Loading...
11-101008 City of Federal Way • • 'Mechanical Community Development Services Permit #: 11 -101008-00-ME P.O.Box 9718 FILE Federal Way,WA 98063-9718 Inspection Request Line: 25 Ph:(253)835-2607 Fax (253)835-2609 p q ( 3)835-3050 Project Name: LIANG a S g 2'S Project Address: 136 SW 304TH ST Parcel Number: 233730 0220 Project Description: Replace gas furnace Owner Applicant Contractor WEI DING LIANG WEI DING LIANG BEL RED HEATING&AIR(GENERAL) 136 SW 304TH ST 136 SW 304TH ST BELREHA101DK(2/7/13) FEDERAL WAY WA 98023-3938 FEDERAL WAY WA 98023 10733 47TH AVE W MUKILTEO WA 98275 NNW f'''144411111111121111WWM1111111'''' """11111.1111111 Mechanical Valuation 5012. Is this an Online or O.T.C.application? Yes • x�, :-i ray' a. Id.>.• �3' �., ' �Si x.:5"3i'k"•£_v.r.< 'K, ..�. .�'S;.':.`�.xa.. L .3Y..>x.. - J`•. 4 , tf.4 •atr ♦,.Sr �...�.�. *aim Furnaces 1 PERMIT EXPIRES Monday, September 12, 2011 Permit Issued on Wednesday, March 16, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. ,,eOwner or agent: Date: *4V(( PIN&(L A 34i/// , , THIS CARD IS TO REMAIN ON-SITE ' CITY OF Construction Rection Record Federal Way INSPECTION REQUESTS: O 253 835-3050 PERMIT#: 11-101008-00-ME Address: 136 SW 304TH ST Project: WEI DING LIANG FEDERAL WAY, WA 98023-3938 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) CI Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By /� t,f Date .3A/A, , F ! LFFE:3 El Rough Electrical El Final ElectricalEJ Right of Way Approved Approved Approved By Date By Date By Date