10-100288 •
City of Federal Way • Electrical
Community Development Services Permit #: 10-100288-00-EL
P o Box 9718
Federal Way,WA 98063-9718
Ph.(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (2
53)835-3050
Project Name: AVALON CARE CENTER
Project Address: 135 S 336TH ST Parcel Number: 926504 0110
Project Description: Low-voltage wiring for 12 Kiosk
`
Owner Applicant Contractor
135 SOUTH 336TH STREET LLC MIKE PATTERSON FIRE POWER INC
6380 WILSHIRE BLVD#1106 Firepower,Inc. FIREPI*137NO(8/20/11)
LOS ANGELES CA 10220 N NEVADA ST SUITE 200 10220 N NEVADA ST SUITE 200
90048-5019 SPOKANE WA 99218 SPOKANE WA 99218
£ F " f �nri,, tt F4'''!' 1
Is Use Educational or Institutional? No Service greater than 1000 Amps9 No
•i`1. • T4r"aw,....• 'M
• ,4#` Xv-It?F4,• k� „
xw ' 3` < rt S*• "• + • � «-j
£•
, .k��
Low Voltage-Other(Commercial: 1
PERMIT EXPIRES Saturday, January 22, 2011
Permit Issued on Friday, January 22, 2010
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way. 'te Q
Owner or agent: 0NWMC Date:
FIt' LED i ZInd
• THIS CARD IS TO MAIN ON-SITE
CITY OF Construction I ection Record
Federal Way INSPECTION REQU TS: (253)835-3050
PERMIT#: 10-100288-00-EL Address: 135 S 336TH ST
Owner: 135 SOUTH 336TH STREET LLC FEDERAL WAY, WA 98003-6601
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 UFER Ground(4295) El Ditch cover(4030) 0 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
•
. '
El Pool Bonding(4195) El Temporary Power(4275) 0 Service(4235)
Approved Approved Approved
By Date By Date By Date
El Feeders/Sub-panels(4045) 0 Rough Electrical(4225) 0 Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
0 Final-Electrical(4055)
Approved
134 -7 Date /" 7Q/C7
❑ Rough Electrical Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date