Loading...
AG 19-195 - Pavement Maintenance of WA RETURN TO: PW ADMIN EXT: 2700 ID#: -S5 9 CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM ORIGINATING DEPT/DIv: PUBLIC WORKS/CAPITAL PROJECTS ENGINEERING ORIGINATING STAFF PERSON:NAVEEN CHANDRA EXT:2729 3. DATE REQ.BY:8/15/19 �. TyL)%OF DOCUMENT(CHECK ONE): VI CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RFP(EQ 1:1PUBLIC WORKS CONTRACT SMALL OR LIMITED PUBLIC WORKS CONTRACT ❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT ❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG ❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS) ❑ ORDINANCE ❑ RESOLUTION ❑rCONTRACT AMENDMENT(AG#): ❑ INTERLOCAL T G. PROJECT NAME:GREEN GA[LER NTS PROJECT i. NAME OF CONTRACTOR: *+ 1 k'mmw't of ADDRESS: %� TELEPHONE:, al� •^ o ' E-MAIL: FAx: SIGNATURE NAME: TiTLE:�V%f �. EXHIBITS AND ATTACHMENTS:❑ SCOPE,WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS CFW LICENSE# BL,EXP. 12/31/ UBI# EXP. '. TERM: COMMENCEMENT DATE:® 1/3 f 111 COMPLETION DATE: f t Z i. TOTAL COMPENSATION:$ `Q�/D j 9 (INCLUDE EXPENSES AND SALES TAX,IF ANY) (IF CALCULATED ON HOURLY LABOR CHARGE ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES) REIMBURSABLE EXPENSE: ❑YES ❑NO IF YES,MAXIMUM DOLLAR AMOUNT: $ IS SALES TAX OWED: ❑YES ❑NO IF YES,$ PAID BY: ❑CONTRACTOR ❑CITY RETAINAGE: RETAINAGE AMOUNT: ❑RETAINAGE AGREEMENT(SEE CONTRACT) OR ❑RETAINAGE BOND PROVIDED El PURCHASING: PLEASE CHARGE TO: y �/ — r4Q" - 1. DOCUMENT/CONTRACT REVIEW INITIAL/DATE REVIEWED �� J N I I I;'11.!DA i i•.APPROV D0 j E] PROJECT MANAGER .O DIVISION MANAGER � n `C c 'pEPUTY DIRECTOR 16 Z DIRECTOR ❑ RISK MANAGEMENT (IF APPLICABLE) „e LAW DEPT zz 0. COUNCIL APPROVAL(IF APPLICABLE) SCHEDULED COMMITTEE DATE: COMMITTEE APPROVAL DATE: SCHEDULED COUNCIL DATE: COUNCIL APPROVAL DATE: 1. CONTRACT SIGNATURE ROUTING G] ❑ SENT TO VENDOR/CONTRACTOR DATE SENT: I � v �, ( DATE REC'D: /(2-/m ❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE LICENSES LX EI I B ITS ❑ CREATE ELECTRONIC REMINDER/NOTIFICATION FOR 1 MONTH PRIOR TO EXPIRATION DATE (INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.) INITIAL/DATE SIGNED ❑ FINANCE DEPARTMENT fXLAW� 'Df-'j,1 SIGN, -roIn'NAYORORDIRECTOR) r C r'C11 VC LERK �✓ .�sSIGNFD AG# G " ❑ SIG Nf D C on RETURNED rA E SENT: /RETURN SIL*ORIGINALS :OMMENTS: 2 :XECUTE" "ORIGINALS Innis LIMITED PUBLIC WORKS CONTRACT FOR GREEN GABLES NTS PROJECT This limited public works contract ("Contract") is dated effective this "")I day of , 20_L' d is made by and between the City of Federal Way, a Washington muni corporation City" or "Owner"), and Pavement Maintenance of Washington LLC, a Limited Liability Company("Contractor"). A. The City desires to retain an independent contractor to furnish all labor and materials necessary to perform work at SW 325th PL, SW 325th Way, and 47th Avenue SW, Federal Way,Washington("Property"); and B. The Contractor has the requisite skill and necessary experience to perform such work. NOW,THEREFORE, the Parties ("Parties") agree to the following terms and conditions: 1. . SERVICES BY CONTRACTOR 1.1 Description of Work. Contractor shall perform all work and furnish all tools, materials, supplies, equipment, labor and other items incidental thereto necessary for the construction and completion of the work, more particularly described as the Green Gables NTS project, in Exhibit "A" attached hereto and incorporated by this reference, ("Work"), and in accordance with and as described in the Contract Documents, which include without limitation, this Contract, Contrad Change Order Agreement attached as Exhibit `B," Notice to Labor Unions attached as Exhibit"C," Certificate(s) of Insurance Form attached hereto as Exhibit"D," Prevailing Wage Rates attached as Exhibit "E," Title VI Assurances attached hereto as Exhibit "F," and all other Appendices attached hereto and incorporated by this reference, (collectively the "Contract Documents"),which Work shall be completed to the City's satisfaction, within the time period prescribed by the City and pursuant to the direction of the Mayor or his or her designee. 1.2 Completion Date. The Work shall be commenced within five (5) days of receipt by the Contractor of the City's Notice to Proceed. The Work shall be completed by October 15, 2019. In the event the Work is not completed within the time specified, Contractor agrees to pay to the City liquidated damages in the amount set forth in the formula included in Section 1.3 of this Contract. The Work shall not be deemed completed until the City has accepted the Work. 1.3 Liquidated DarnMeses. Time is of the essence of the Contract. Delays inconvenience the public and cost taxpayers undue sums of money, adding time needed for administration, inspection, and supervision. It is impractical for the City to calculate the actual cost of delays. Accordingly, the Contractor agrees to pay liquidated damages calculated on the following formula for its failure to complete this Contract on time: l 1 3/2017 (1) To pay(according to the following formula) liquidated damages for each working day beyond the number of working days established for completion, and (2) To authorize the City to deduct these liquidated damages from any money due or coming due to the Contractor. LIQUIDATED DAMAGES FORMULA d LD =0.15C T where: LD= Liquidated damages per working day(rounded to the nearest dollar). C = Original Contract amount. T= Original time for completion. When the Work-is completed to the extent that the City has full and unrestricted use and benefit of the facilities, both from an operational and safety standpoint, the City may determine the Work is complete. Liquidated damages will not be assessed for any days for which an extension of time is granted. No deduction or payment of liquidated damages will, in any degree, release the Contractor from further obligations and liabilities to complete this entire Contract. 1.4 Performance Standard. Contractor shall perform the Work in a manner consistent with accepted practices for other properly licensed contractors, performed to the City's satisfaction, within the time period prescribed by the City. 1.5 Compliance with Laws. Contractor shall perform the Work in accordance with all applicable federal, state and City laws, including, but not limited to all City ordinances, resolutions, standards o1r policies, as now existing or hereafter adopted or amended, and obtain all necessary permits and pay all permits, inspection or other fees, at its sole cost and expense. 1.6 Change OrdcFs. The City may, at any time, without notice to sureties, order changes within the scope of the Work. Contractor agrees to fully perform any such alterations or additions to the Work. All such change orders shall be in the form of the Contract Change Order Agreement attached hereto as Exhibit `B,"which shall be signed by both the Contractor and the City, shall specifically state the change of the Work, the completion date for such changed Work, and any increase or decrease in the compensation to be paid to Contractor as a result of such change in the Work. Oral change orders shall not be binding upon the City unless confirmed in writing by the City. If any change hereunder causes an increase or decrease in the Contractor's cost of, or time required for, the performance or any part of the Work under this Contract, an equitable adjustment will be made and the Contract modified in writing accordingly. If the Contractor intends to assert a claim for an equitable adjustment hereunder, it shall, within five (5) days after receipt of a written change order from the City or after giving the City the written notice required above, as the case may be, submit to the City a written statement setting forth the general nature and monetary extent of such claim; provided the City, in its sole 2 d 3/2017 discretion, may extend such five (5) day submittal period upon request by the Contractor. The Contractor shall supply such supporting documents and analysis for the claims as the City may require determining if the claims and costs have merit. No claim will be allowed for any costs incurred more than five(5) days before the Contractor gives written notice as required. No claim by the Contractor for an equitable adjustment hereunder will be allowed if asserted after final payment under this Contract. 1.7 Work and Materials Omitted. The Contractor shall, when directed in writing by the City, omit work, services and materials to be furnished under the Contract and the value of the omitted work and materials will be deducted from the Total Compensation and the delivery schedule will be reviewed if appropriate. The value of the omitted work, services and materials will be a lump sum or knit price, as mutually agreed upon in writing by the Contractor and the City. If the parties cannot agree on an appropriate deduction, the City reserves the right to issue a unilateral change order adjusting the price and the delivery schedule. 1.8 Utility Loc€.t x o zi. Contractor is responsible for locating any underground utilities affected by the Work and is deemed to be an excavator for purposes of Chapter 19.122 RCW, as amended. Contractor shall be responsible for compliance with Chapter 19.122 RCW, including utilization of the"one call"locator system before commencing any excavation activities. 1.9 Air Environment. Contractor shall fully cover any and all loads of loose construction materials including without limitation, sand, dirt, gravel, asphalt, excavated materials, construction debris, etc., to protect said materials from air exposure and to minimize emission of airborne particles to the ambient air environment within the City of Federal Way. 2. TERM This Contract shall commence on the effective date of this Contract and continue until the completion of the Work, which shall be no later October 15, 2019 and the expiration of all warranties contained in the Contract Documents ("Term"). 3. WARRANTY � 3.1 Requisite-Skill. The Contractor warrants that it has the requisite skill to complete the Work, and is appropriately accredited and licensed by all applicable agencies and governmental entities, including, but not limited to being registered to do business in the City of Federal Way by obtaining a City of Federal Way business registration. Contractor represents that it has visited the site and is familiar with all of the plans and specifications in connection with the completion of the Work. 3.2 Defective Work. The Contractor shall, at its sole cost and expense, correct all Work which the City deems to have defects in workmanship and material discovered within one (1)year after the City's final acceptance of the Work. 3 3/2017 t 4. COMPENSATION 4.1 Total Compensation. In consideration of the Contractor performing the Work,the City agrees to pay the Contractor a fixed fee equal to Seventeen Thousand Six-Hundred and 00/100 Dollars ($17,600.00),which amount shall constitute full and complete payment by the City. 4.2 Contractor Responsible for Taxes. The Contractor shall be solely responsible for the payment of any taxes imposed by any lawful jurisdiction as a result of the performance and payment of this Contract. 4.3 Nonpayment. The City shall have the right to withhold payment to the Contractor for any of the Work not completed in a satisfactory manner, in the City's sole discretion, which shall be withheld until such time as Contractor modifies or repairs the Work so that the Work is acceptable to the City. 4.4 Method of P viiient. Payment by the City for the Work will only be made after the Work has been completed, a voucher or invoice is submitted in the form specified by the City,and such invoice is approved by the appropriate City representative.Payment shall be made within thirty(30)days ofreceipt ofsuch invoice orvoucherunless otherwise set forth inthe Bid Form. The Contractor's acceptance of such payment for the Work shall constitute full compensation for the performance of the Work. Invoices shall be submitted,in duplicate to: City of Federal Way ATTN: Accounts Payable 33325 8th Avenue South Federal Way, WA 98003-6325 Duplicate invoices shall be furnished to: City of Federal Way ATTN:Naveen Chandra,P.E., 33325 8th Avenue South Federal Way, WA 98003-6325 5. EQUAL OPPORTUNITY EMPLOYER In all Contractor services, programs or activities, and all Contractor hiring and employment made possible by or resulting from this Contract,there shall be no discrimination by Contractor or by Contractor's employees, agents, subcontractors or representatives against any person because of sex, age(except minimum age and retirement provisions), race, color, creed, national origin, marital status or the presence of any disability, including sensory, mental or physical handicaps, unless based upon a bona fide occupational qualification in relationship to hiring and employment. This requirement shall apply, but not be limited to the following: employment,advertising,layoff or termination,rates of pay or other forms of compensation,and 4 3/2017 r selection for training, including apprenticeship. Contractor shall comply with and shall not violate any of the terms of Chapter 49.60 RCW, Title VI of the Civil Rights Act of 1964, the Americans With Disabilities Act, Section 504 of the Rehabilitation Act of 1973,.49 CFR Part 21, 21.5 and 26, or any other applicable federal, state, or local law or regulation regarding non- discrimination. Contractor shall post a notice to Labor Unions or othei employment organizations, attached hereto as Exhibit "C," as required by Section 202 of Executive Order 11246. Any'Material violation of this provision shall be grounds for termination of this Contract by the City and, in the case of the Contractor's breach, may result.in ineligibility for further City agreements. If this project involves federal funds including UDOT funds administered by WSDOT,the contractor agrees to the clauses contained in Exhibit F. 6. INDEPENDENT CONTRACTOR/CONFLICT OF INTEREST It is the intention and understanding of the Parties that the Contractor shall be an independent contractor and that the City shall be neither liable nor obligated to pay Contractor sick leave, vacation pa or any other benefit of employment, nor to pay any social security or other tax which may arile as an incident of employment. The Contractor shall pay all income and other taxes as due. Industrial or any other insurance purchased for the benefit of the City, regardless of whether such may provide a secondary or incidental benefit to the Contractor, shall not be deemed to convert this Contract to an employment contract. It is recognized that Contractor may or will be performing work during the Term for other parties; provided, however, that such performance of other work shall not conflict with or interfere with the Contractor's ability to perform the Work. Contractor agrees to resolve any such conflicts of interest in favor of the City. 7. TERMINATION Prior to the expiration of the Term, this Contract may be terminated immediately, with or without cause by the City. 8. INDEMNIFICATION 8.1 Contractor Indemnification. The Contractor agrees to indemnify, defend and hold the City, its elected officials, officers, employees, agents, and volunteers harmless from any and all claims, demands, losses, actions and liabilities (including costs and all attorney fees) to or by any and all persons or e6tities, including, without limitation, their respective agents, licensees, or representatives, arising from,resulting from, or connected with this Contract to the extent caused by the negligent acts, errors or omissions of the Contractor, its partners, shareholders, agents, employees, or by the Contractor's breach of this Contract. Contractor waives any immunity that may be granted to it under the Washington State Industrial Insurance Act, Title 51 RCW. Contractor's indemnification shall not be limited in any way by any limitation on the amount of damages, compensation or benefits payable to or by any third party 'under workers' compensation acts, disability benefit acts or any other benefits acts or programs. 8.2 City Indemnification. The City agrees to indemnify, defend and hold the Contractor, its officers, directors, shareholders, partners, employees, and agents harmless from 5 3/2017 i any and all claims, demands, losses, actions and liabilities (including costs and attorney fees) to or by any and all persons or entities, including without limitation, their respective agents, licensees, or representatives, arising from, resulting from or connected with this Contract to the extent solely caused by the negligent acts, errors, or omissions of the City, its employees or agents. 8.3 Survival:The provisions of this Section shall survive the expiration or termination of this Contract with respect to any event occurring prior to such expiration or termination. 9. INSURANCE 9.1 Minimum Limits. The Contractor agrees to carry as a minimum, the following insurance, in such forms and with such carriers who have a rating, which is satisfactory to the City: (1) Workers' compensation and employer's liability insurance in amounts sufficient pursuant to the laws of the State of Washington; (2) Comme&ial general liability insurance with combined single limits of liability not less than $2,000,000 for bodily injury, including personal injury or death, products liability and property damage. (3) Automobile liability insurance with combined single limits of liability not less than $1;000,000 for bodily injury, including personal injury or death and property damage. (4) If any structures are involved in the Contract, the Contractor shall maintain an "Ali Risk Builder's Risk 2 form at all times in an amount no less than the value of the structure until final acceptance of the project by the City. 9.2 Endorsements. Each insurance policy shall contain, or be endorsed to contain, the following provisions: (1) The City, its officers, officials, employees, volunteers and agents shall each be named as additional insured. (2) Coverage may not be terminated or reduced in limits except after thirty(30) days prior written notice by certified mail, return receipt requested, to the City. (3) Coverage shall be primary insurance as respects the City, its officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officials, employees or volunteers shall be in excess of Contractor's insurance. (4) Coverage-shall apply to each insured separately against whom claim is made or suit is brought. 6 3/2017 (5) Coverage shall be written on an"occurrence" form as opposed to a"claims made" or"claims paid"l form. 9.3 Verification. Contractor shall furnish the City with certificates of insurance evidencing the coverage required by this Section, attached hereto as Exhibit "D" and incorporated by this reference. The City reserves the right to require complete certified copies of all required insurance policies, at any time. 9.4 Subcontractors. Contractors shall include all subcontractors as additional insured under its policies or shall furnish separate certificates for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein. 9.5 Deductibles and Self Insured Retentlons. Any deductibles or self-insured retentions must be disclosed by Contractor and approved in writing by the City. At the option of the City, Contractor shall either reduce or eliminate such deductibles or self-insured retentions or procure a bond guaranteeing payment for any amounts not covered by the insurance by reason of such deductibles or self-insured retentions. 9.6 Asbestos Abatement or Hazardous Materials. If asbestos abatement or hazardous materials work is performed, Contractor shall review coverage with the City's Risk Manager and provide scope and limits of coverage that are appropriate for the scope of-Work and are satisfactory to the City. Contractor shall not commence any Work until its coverage has been approved by the Risk Manager. 9.7 Termination. The Contractor's failure to provide the insurance coverage required by this Section shall be deemed to constitute non-acceptance of this Contract by the Contractor and the City may.then award this Contract to the next lower bidder. The provisions of this Section shall survive the expiration or termination of this Contract with respect to any event occurring prior to such expiration or termination. 10. SAFETY Contractor shall take all necessary precautions for the safety of employees on the work site and shall comply with all applicable provisions of federal, state and municipal safety and health laws and codes, including without limitation, all OSHA/WISHA requirements, Safety and Health Standards for Construction Work (Chapter 296-155 WAC), General Safety and Health Standards (Chapter 296-24 WAC), and General Occupational Health Standards (Chapter 296-62 WAC). Contractor shall erect and properly maintain, at all times, all necessary guards, barricades, signals and Qther safeguards at all unsafe places at or near the Work for the protection of its employees and the public, safe passageways at all road crossings, crosswalks, street intersections, post danger signs warning against known or unusual hazards and do all other things necessary to prevent accident or loss of any kind. Contractor shall protect from damage all water, sewer, gas, steam or other pipes or conduits, and all hydrants and all other property that is likely to become displaced or damaged by the execution of the Work. The Contractor shall, at its own expense, secure and maintain a safe storage place for its materials and equipment and is 7 3/2017 solely responsible for the same. 11. PREVAILING WAGES i 11.1 Wages of Employees. This Contract is subject to the minimum wage requirements of Chapter 39.12 of the Revised Code of Washington, as now existing or hereafter amended or supplemented. In the payment of hourly wages and fringe benefits to be paid to any of Contractor's laborers, workpersons and/or mechanics, Contractor shall not pay less than the "prevailing rate of wage" for an hour's work in the same trade or occupation in the locality within the State-of Washington where such labor is performed, as determined by the Industrial Statistician of the Department of Labor and Industries of the State of Washington, which "prevailing rates of wage" are attached hereto as Exhibit "E" and incorporated herein by this reference. Prevailing wages paid pursuant to this Agreement shall be the prevailing wage rates, which are in effect on the date when the bids, proposals, or quotes were required to be submitted to the City. 11.2 Excrnpt ggs to Prcvailing_hlage. The prevailing wage requirements of Chapter 39.12 RCW, and as required in this Contract do not apply to: (1) Sole owners and their spouses; (2) Any partner who owns at least 30% of a partnership; and (3) Ae President, Vice President and Treasurer of a corporation if each one owns at least 30%of the corporation. 11.3 Reporting- Requirements. Contractor shall comply with all reporting requirements of the Department of Labor and Industries of the State of Washington. Upon the execution of this Contract, Contractor shall complete and file a Statement of Intent to Pay Prevailing Wages with the Department 'of Labor and Industries. Upon completion of the Work, Contractor shall complete and file an Affidavit of Wages Paid with the Department of Labor and Industries. Contractor shall deliver copies of both the Statement of Intent to Pay Prevailing Wages and the Affidavit of Wages Paid, certified by the Department of Labor and Industries, to the City. 11.4 DISDUteS. In the event any dispute arises as to what are the prevailing rates of wages for work of a similar nature and such dispute cannot be resolved by the City and the Contractor, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries of the State of Washington and the decision therein shall be final and conclusive and binding on all parties involved in the dispute. 12. FAILURE TO PAS' SUBCONTRACTORS In the event theiContractor shall fail to pay any subcontractors or laborers, or fail to pay for any materials or any insurance premiums, the City may terminate this Contract and/or the City may withhold from the money which may be due the Contractor an amount necessary for the payment of such subcontractors, laborers,materials or insurance premiums. 8 3/2017 13. OWNERSHIP OF DOCUMENTS All originals and copies of work product, including plans, sketches, layouts, designs, design specifications, records, files computer disks, magnetic media, all finished or unfinished documents or material which may be produced or modified by Contractor while performing the Work shall become the Oroperty of the City and shall be delivered to the City at its request. 14. CONFIDENTIALITY Any records, reports, information, data or other documents or materials given to or prepared or assembled by the Contractor under this Contract will be kept as confidential and shall not be made available to any individual or organization by the Contractor.without prior written approval of the City. 15. BOOKS AND RECORDS The Contractor agrees to maintain books, records, and documents which sufficiently and properly reflect all direct and indirect costs related to the performance of this Contract and such accounting procedures and practices as may be deemed necessary by the City to assure proper accounting of all funds paid pursuant to this Contract. These records shall be subject at all reasonable times to inspection, review or audit by the City, its authorized representative, the State Auditor, or other governmental officials authorized by law to monitor this Contract. 16. CLEAN UP 1 At any time ordered by the City and immediately after completion of the Work, the Contractor, shall, at its own expense, clean up and remove all refuse and unused materials of any kind resulting from the Work. In the event the Contractor fails to perform the necessary clean up, the City may, but in no event is it obligated to, perform the necessary clean up and the costs thereof shall be immediately paid by the Contractor to the City and/or the City may deduct its costs from any remaining payments due to the Contractor. 17. CONTRACTOR AND SUBCONTRACTOR RESPONSIBILITY: 17.1 Contractor Verification. The Contractor verifies that it has a certificate of registration with the State of Washington; has a current state unified business identifier number; is not disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3); has industrial insurance as required by Title 51 RCW, if applicable; has an employment security department number as required in Title 50 RCW, if applicable; has a state excise tax registration number as required in Title 82 RCW, if applicable; possesses a valid electrical contractor license as required by chapter 19.28 RCW, if applicable; and possesses an elevator contractor license as required by chapter 70.87 RCW, if applicable. 17.2 Subcontractor Contracts. The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require each of its subcontractors to include the 9 3/2017 same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. Upon request of the Owner, the Contractor shall promptly provide documentation to the Owner demonstrating that the subcontractor meets the subcontractor responsibility criteria below. The requirements of this section apply to all subcontractors regardless of tier. 17.3 Subcontractor Verification. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility cnieria.: Have a current I certificate of registration in compliance with chapter 18.27 RCW, which must have been in effect at the time of subcontract bid submittal; Have a current Washington Unified Business Identifier(UBI) number;Not be disqualified from bidding on any.public works contract under RCW 39.06.010 or 39.12.065 (3); Have Industrial Insurance (workers' compensation) coverage for the subcontractor's employees working in Washington, as required in Title 51 RCW, if applicable; A Washington Employment Security Department number, as required in Title 50 RCW, if applicable; A Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW, if applicable; An electrical contractor license, if required by Chapter 19.28 RCW, if applicable; An elevator contractor license, if required by Chapter 70.87 RCW. 18. GENERAL PROVISIONS 18.1 'Entire. Contract. The Contract Documents contain all of the agreements of the Parties with respect to any matter covered or mentioned in this Contract and no prior agreements or understandings pertaining to any such matters shall be effective for any purpose. 18.2 Modification. No provisions of this Contract, including this provision, may be amended or added to except by agreement in writing signed by the Parties or their respective successors in interest. 18.3 Full Force and i A#feet. Any provision of this Contract, which is declared invalid, void or illegal, shall in no way affect, impair, or invalidate any other provision hereof and such other provisions shall remain in full force and effect. 18.4 Assignment. The Contractor shall not transfer or assign, in whole or in part, any or all of its obligations and rights hereunder without the prior written consent of the City. In the event the City consents-to any such assignment or transfer, such consent shall in no way release the Contractor from any of its obligations or liabilities under this Contract. 18.5 Successors In fnterL'tit. Subject to the preceding Subsection, this Contract shall be binding upon and inure to the benefit of the Parties' successors in interest, heirs and assigns. 18.6 Attorney €=c'."c�. In the event the City or the Contractor defaults on the performance of any terms in this Contract, and the Contractor or City places the enforcement of the Contract or any part thereof, or the collection of any monies due, or to become due hereunder, or recovery of possession of any belongings, in the hands of an attorney, or file suit upon the same, each Party 10 3/2017 shall pay all its own attorneys' fees, costs and expenses. The venue for any dispute related to this Contract shall be King County, Washington. 18.7 No Waiver. Failure of the City to declare any breach or default immediately upon occurrence thereof, or delay in taking any action in connection with, shall not waive such breach or.default. Failure of the City to declare one breach or default does not act as a waiver of.the City's right to declare another breach or default. 18.8 Governing Law. This Contract shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington. 18.9 Authority.d Each individual executing this Contract on behalf of the City and Contractor represents and warrants that such individuals are duly authorized to execute and deliver this Contract on behalf of the Contractor or City. 18.10 Notices. Any notices required to be given by the City to Contractor or by the Contractor to the City shall be delivered to the Parties at the addresses set forth below. Any notices may be delivered personally to the addressee of the notice or may be•deposited in the United States mail, postage prepaid, to the address set forth herein. Any notice so posted in the United States mail shall be deemed received three(3)days after the date of mailing. 18.11 Captions. The respective captions of the Sections of this Contract are inserted for convenience of reference only and shall not be deemed to modify or otherwise affect in any respect any of the provisions of this Contract. 18.12 Performance. Time is of the essence of this Contract and each and all of its provisions in which performance is a factor. Adherence to completion dates is essential to the Contractor's performance of this Contract. 18.13 Compliance with Ethics Code. If a violation of the City's Ethics Resolution No. 91-54, as amended, occprs as a result of the formation and/or performance of this Contract, this Contract may be rendered null and void, at the City's option. 18.14 Conflicting Provisions. In the event of a conflict between the terms and provisions of any of the Contract Documents, the Mayor or his or her designee shall issue an interpretation of the controlling document,which interpretation shall be final and binding. DATED the day and year set forth above. Cl F FEDERAL WAY: r J' Ferrell, Mayor 33325 8th Avenue South Federal Way, WA 98003-6325 11 3/2017 APPROVED AS TO FORM: ATTEST: J. Ryan Call,City Attorney - t ie urtney, CMC, City Clerk i . Pavement Maintenance of Washington LLC By: (Address) (Phone) STATE OF WASHINGTON ) ss. COUNTY OF N L� On this day personally appeared before me �ARX -5tlC„Cti,� , to me known to be the of �) that executed the or�g instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said limited liability company, for the uses and purposes therein mentioned, and on oath stated that he/she was authorized to execute said instrument. GIVEN my hani and official seal this day of (Z ��r ,2014 do 7 ° NOTARY (typed/printed name of notary) �'�• = = Notary Public in and for the State of Washington. 'PUBLIC e My commission expires ►+►F►,rriiNt�s« 12 3/2017 EXHIBIT A SCOPE OF WORK This project shall consist of Construction of four Speed Humps and Installation of Precast-Dual Faced Sloped Mountable Curb within the City of Federal Way,and all items necessary to complete the work as described in the Contract Documents.Signs and Pavement Markings will be completed by others. SCHEDULE A—GREEN GABLES NTS PROJECT Unit Prices for all items,all extensions,and the total amount of the bid must be shown. Show unit pri tal s in legible ngures.Where conflict occurs between the unit price and the to amount nam e8 for any item,the unit price shall prevail,and the totals shall he corrected to conform thereto. ITEM SECT. ITEM DESCRIPTION APPROX - UNIT UNIT TOTAL BID NO. QTY PRICE 1 1-09 Mobilization I LS $2,500.00 $2,500.00 2 1-10 Temporary Traffic Control I LS $2,500.00 $2,500.00 3 8-07 Precast Dual Faced Sloped Mountable 60 LF Curb $110.00 $6,600.00 14 8-22 Speed Humps 4 EA $1,500.00 $6,000.00 PAVEMENT MAINTENANCE OF WASHINGTON LLC TOTAL= $17,600.00 SPEED HUMPS: Dump Truck,Tool Truck 1. One Mobilization 2. Install Speed Humps Half section at a time to maintain alternating traffic PRECAST CURB: Tool Druck,Truck and Trailer 1. One Mobilization 2. Prep for installation 3. Install 3/2017 EXHIBIT B CONTRACT CHANGE ORDER AGREEMENT PROJECT NUMBER CHANGE ORDER NUMBER EFFECTIVE DATE PROJECT TITLE CONTRACTOR SUMMARY OF PROPOSED CHANGES: The time provided for completion in the Contract is ❑ Unchanged ❑ Increased ❑ Decreased by Calendar Days.This Document shall become an Amendment to the Contract and all provisions of the Contract not amended herein will apply to this Change Order. Will this change affect expiration or extent of Insurance coverage? ❑Yes,[]No If"Yes"Will the Policies Be Extended? ❑Yes❑No PRICE CHANGE ,UMP SUM: INCREASE$ DECREASE$ UNIT PRICE: THE ITEMS ARE APPROXIMATE OR ESTIMATED QUANTITIES INVOLVED IN THIS CHANGE ITEM NO. ITEM QTY. UNIT PRICE ADD OR DELETE TOTAL NET CONTRACT: INCREASE$ DEGREASE$ STATEMENT: Payment for the above work will be in accordance with applicable portions of the standard specifications, and with the understanding that all materials, workmanship and measurements shall be in accordance with the provisions of the standard specifications, the contract plans, and the special provisions governing the types of construction. DEPARTMENT RECAP TO DATE: ORIGINAL CONTRACT AMOUNT $ PREVIOUS CHANGE ORDERS $ THIS CHANGE ORDER $ *ADJUS'T'MENTS $ NEW CONTRACT AMOUNT $ CONTRACTOR'S SIGNATURE DATE DIRECTOR'S SIGNATURE DATE ADJUSTMENTS 14 3/2017 CHANGE ORDER ESTIMATE IS HEREBY ❑INCREASED $ ❑DECREASED $ PAY THIS ADJUSTED AMOUNT: $ DIRECTOR'S SIGNATLAE DATE t 15 3/2017 EXHIBIT C NOTICE TO LABOR UNIONS OR OTHER EMPLOYMENT ORGANIZATIONS NONDISCRIMINATION IN EMPLOYMENT TO: (Name of Union or Organization) The undersigned currently holds contract(s) with involving funds or credit of the City of Federal Way, Washington, or.(a) subcontract(s) with a prime contractor holding such contract(s). You are advised that, under the provisions of the above contract(s) or subcontract(s) and in accordance with Section 202 of Executive Order 11246 dated September 24, 1965, the undersigned is obliged not to discriminate against any employee or applicant of employment because of race, color, creed or national origin. This obligation not to discriminate in employment.includes,but is not limited to,the following: EMPLOYMENT,UPGRADING,TRANSFER OR DEMOTION RECRUITMENT AND ADVERTISING RATES OF PAY OR OTHER FORMS OF COMPENSATION SELECTION FOR TRAINING INCLUDING APPRENTICESHIP, LAYOFF OR TERMINATION This notice is furnished to you pursuant to the provisions of the above contract(s) or subcontractor(s) and Executive Order 11246. Copies of this Notice will be posted by the undersigned in conspicuous places available to employees or applicants for employment. (Contractor or subcontractor) Date � 16 3/2017 EXHIBIT D CERTIFICATE OF INSURANCE(SEE ATTACHED). d 17 3/2017 DATE(MNVDD/YYYY) CERTIFICATE OF LIABILITY INSURANCE .� 09/0712019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONNAME Kristie English English Insurance Group,LLC -PHONE FAX [wrExn; (425)673-7948 IVC No:(425)673-7942 5005 200th Street SW Suite 102 SAIL LYNNWOOD,WA 98036 a9DRESS. kristie(ilenglishinsurancc-group.cam License#•245177 INSURER(S)AFFORDING COVERAGE NAIC# INSURER A: OHIO SECURITY INSURANCE COMPANY 2 INSURED INSURER B: MUTUAL OF ENUMCLAW 14761 PAVEMENT MAINTENANCE OF WASHINGTON,LLC _INSURER C National Union Fire Insurance Company f Ptftb 24074 19411 SE GREEN VALLEY RD INSURER AUBURN,WA 98092 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: 00000000-1764474 REVISION NUMBER: 86 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. iNSR ADDI.'SUBR - POLICY EFF POLICY EXP LIMITS LTR TYPE OF INSURANCE n' n POLICY NUMBER CMMIOD/YYY MMIDD/YYY A X COMMERCIAL GENERAL LIABILITY Y BLS59286086 11/26/2018 11/26/2019 EACH OCCURRENCE $ 1,000,000 DAMAG CLAIMS-MADE I OCCUR PREMISES/Ea oceurrence $ 1.000,000 MED EXP(Any one arson) $ 15,000 PERSONAL&ADV INJURY S 1.000.000 GEN'L AGGHLGAI E=LIMI I APPLIES PER: GCNERALAGGRCOATC S _2,000,000 _ POLICY Ej]JEC F-1 LOC PRODUCTS-COMPIOP AGG $ 2,000.000 OTH -$ ..... B AUTOMOBILE LIABILITY CPP0024376 11/26/2018 11/26/2019 _aftCOMBINED SINGLE LIMIT $ 1.000.000 Ix ANY AUTO BODILY INJURY(Per person) $OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGEAUTOS ONLY X AUTO$ONLY Per accident $ C UMBRELLA LIAB X OCCUR EBU018232547 12/19/2018 11/26/2019 EACH OCCURRENCE $ 2 000,000 X EXCESS LIAB CLAIMS-MADE AGGREGATE $ 2,000,000 DED RETENTION$ l $ WORKERS COMPENSATION StopGa A BLS59286086 11/26/2018 11/26/2019 X BTgtt TE Ea AND EMPLOYERS'LIABILITY � � ��� ANY PROPRIETOR/PARTNER/EXECUTIVE Y� N/A E,L.EACH ACCIDENT S 1,000 000 OFFICER/MEMBER EXCLUDED? (Mandatory In NH) E L DISEASE-EA EMPLOYEE.$ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below I E L DISEASE-POLICY LIMIT S 1.000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) RE: Green Gables NTS Project located at SW 325th PI.SW 325th Way,and 47th Ave.SW FEderal Way,WA The City of Federal Way,its officers,officials,employees,volunteers and agents are listed as additional insured when required by written contract per attached form CG 88100413. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN City of Federal Way ACCORDANCE WITH THE POLICY PROVISIONS. 33325 8th Ave.South FEDERAL WAY,WA 98003 AUTHORIZED REPRESENTATIVE KREy ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD Printed by KRE on September 07,2019 at 03:18PM r ENDORSEMENT No. 19 This endorsement,effective 12:01 AM: December 19, 2018 Forms a part of policy no: EBU 018232547 Issued to: PAVEMENT MAINTENANCE OF WASHINGTON LLC BY: NATIONAL UNION FIRE INSURANCE COMPANY OF PITTSBURGH, PA. Prime Expresssm Additional Insured Endorsement-- Primary and Non-Contributory This policy is amended as follows: Section VII. DEFINITIONS, Paragraph N. is amended to include the following additional provision: Insured means: Any person or organiyation for whom you are ;performing operations Men you and such person or organization have agreed in writing in a contract or agreement that such person or organization is an additional insured on .your policy, but only if such person or organization is included under the coverage provided by Scheduled Underlying Insurance. Such person or organization is an additional insured only with respect to liability arising out of Your Work at the location(s) designated in such contract or agreement. This provision does not apply to liability arising out of the sole negligence of such person or organization for its own acts or.omissions or those of its employees or anyone else acting on its behalf. Coverage afforded to these additional insured parties will be primary to, and non-contributory with, any other insurance available to that person or organization. i All other terms, definitions, conditions, and exclusions of this policy remain unchanged. Authorized Representative or Countersignature (Where Applicable) 105514(5!10) AH2894 EXHIBIT E PREVAILING RATE OF WAGE (SEE ATTACHED). SEE DEPARTMENT CONTRACT BOOK FOR HARD COPY OF THIS EXHIBIT - PREVAILING WAGE RATES.USE LATEST PUBLISHED FIGURES. 18 3/2017 EXHIBIT F TITLE VI ASSURANCES During the performance of this contract, the contractor/consultant, for itself, its assignees and successors in interest(hereinafter referred to as the"contractor") agrees as follows: 1. Compliance with Regulations The contractor shall comply with the Regulations relative to non-discrimination in federally assisted programs of United States Department of Transportation (USDOT), Title 49, Code of Federal Regulations, part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract. 2. Non-discrimination The contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, sex, or national origin in the selection and retention of sub-contractors, including procurement of materials and leases of equipment..The contractor shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Rygulations. 3. Solicitations for Sub-contracts,Including Procurement of Materials and Equipment In all solicitations either by competitive bidding or negotiations made by the contractor for work to be performed under a sub-contract, including procurement of materials or leases of equipment, each potential sub-contractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to non-discrimination on the grounds of race, color, sex, or national origin. 4. Information and Reports The contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the contracting agency or the appropriate federal agency to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to WSDOT or the USDOT as appropriate, and shall set forth what efforts it has made to obtain the information. 19 3/2017 5. Sanctions for Non-compliance In the event of the contractor's non-compliance with the non-discrimination provisions of this contract, the contracting agency shall impose such contract sanctions as it or the USDOT may determine to be appropriate, including, but not limited to: Withholding of payments to the contractor under the contract until the contractor complies, and/or; Cancellation,.termination, or suspension of the contract, in whole or in part 6. Incorporation of Pr?visions The contractor- shall include the provisions of paragraphs (1) through (5) in every sub- contract, including procurement of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The contractor shall take such action with respect to any sub-contractor or procurement as the contracting agency or USDOT may direct as a means of enforcing such-provisions including sanctions for non-compliance. Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a sub-contractor or supplier as a result of such direction, the contractor may request WSDOT enter into such litigation to protect the interests of the state and, in addition, the contractor may request the USDOT enter into such litigation to protect the interests of the United States. { 20 3/2017 Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 ************************************************************************************************************ Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker.On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and hoUd�ays shall be paid at double the hourly rate of wage. D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage.All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the fust eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The fust two(2)hours after eight(8)regular hours Monday through Friday and the fust ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage.All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten(10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four- ten hour schedule,shall be paid at one and one-half times the hourly rate of wage.All hours worked in excess of ten (10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. AN hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. . f I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid atone and one-halftimes the hourly rate of wage. All hours worked over ten(I0)hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions)shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. N. All hours worked on Saturdays(except makeup days)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 {Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 Overtime Codes Continued I. O. The first ten(10)hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten(10)hours on Saturday shall be paid at double the hourly rate of wage, P. All hours worked un Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2)hours after eight(8) regular hours Monday through Friday and up to ten(10) hours worked on Saturdays shall be paid at one and one-half rimes the hourly rate of wage. All hours worked in excess of ten(10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage.All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. A A!1 hC..r....,nrked..n C..n.l­ -4 1.nl:,l...c.1-1)U.nal l of f.vn timnc fi.A 6--l—Toff nf...oyP S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked,except Labor Day,shall be paid at double the hourly rate of wage.All hours worked on Labor Day shall be paid at three times the hourly rate of wage- 11 U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays(except Labor Day) shall be paid at two times the hourly rate of wage..All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day)shall be paid at one and one-lialf times the hourly rate of wage.All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W, All hours-worked.on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer))shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked over twelve(12)hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday, the day before Saturday,Friday, and the day after Sunday, Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as,may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage.(except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day(10 in a 4 x 10 workweek)or 40 hours during t workweek.)All hours worked Monday through Saturday over twelve-(12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 Overtime Codes Continued 2. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked L holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage:All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage. G. Ali hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid atand one-half times the hou7il! rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holida,.:. sh:ll be paid at double the hourly rate of wage. Ona£aur-day,ten- hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage.The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage.All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established, or forty(40)hours of straight time per week,Monday through Friday, or outside the normal shift,and all work on Saturdays shall be paid at time and one-half the straight time rate.Hours worked over twelve hours(12)in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall 'receive an additional one dollar($1.00)per hour for all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees.Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established, or forty(40)hours of straight time per week,Monday through Friday, or outside the norrr4 shift, and all work on Saturdays shall be paid at one and one-half times the hourly r All work perform after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double+hc hourly rate of wage.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. 3 d Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 Overtime Codes Continued 3. E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage.Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two(2)times the regular rate of pay.Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay. J. All hours worked between the hours of 10:00 pm and 5:00 am,Monday through Friday, and all hours worked on Saturdays shat I be paid at a one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. K. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten(10)hour shifts are established, or forty(40)hours of straight time per week, Monday through Friday,or outside the norma 5 am to 6pm shift,and all work on Saturdays shall be paid at one and one-half tines the hourly rate of wage.All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays,and all hours worked in excess of twelve.(I2)hours in a single shift shall be paid at double the hourly rate of wage, After an employee has worked eight(8)hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more.When an employee returns to work without at least eight(8)hours time off since their previous shift,all such time shall be a continuation of shift and paid at the applicable overtime rate until he/she shall have the eight(8)hours rest period. 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week.shall be paid at double the hourly rate of wage.All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. C. On Monday through Friday,the first four(4)hours of overtime after eight(8)hours of straight time work shall be paid at one and one half(1-1/2)tiines the straight time rate of pay,unless a four(4)day ten(10)hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday,the first two(2)hours of overtime after ten(10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay.On Saturday,the first twelve(12)hours of work shall be paid at one and one half-q-1/2)times the straight time rate of pay,er:,:cpt .:.ar if the job is down on Monday through Friday due to weather ca ditions or other conditions outside the conuoi e` he vinplayer,the first ten(I0)hours on Saturday may be worked at the straight time rate of pay.Al I hours worked over twelve(12)hours in a day and all hours worked on Sunday and Holidays shall be paid at two(2)times the straight time rate of pay. Overtime Codes Continued 4. D. All hours worked in excess of eight(8)Hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturday,Sundays and holidays shall be paid at double the hourly rate of pay.Rates include all members of the assigned crew. 4 Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 EXCEPTION: I On all multipole structures and steel transmission lines, switching stations,regulating,capacitor stations,generating plants, industrial'plants,associated installations and substations,except those substations whose primary function is to feed a distribution system,will be paid overtime under the following rates: The first two(2)hours after eight(8)regular hours Monday through Friday of overtime on a regular workday,shall be paid at one and one-half times the hourly rate of wage.All hours in excess of ten(10)hours will be at two(2)times the hourly rate of wage.The first eight(8)hours worked on Saturday will be paid at one and one-half(1-1/2)times the hourly rate of wage.All hours worked in excess of eight(8)hours on Saturday,and all'hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized,shall be paid at the double the hourly rate of wage. 4. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at.one and one-half times the hourly rate of wage.All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day,ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage.The Monday or Friday not utilized in the normal four- day,ten hour work week,and Saturday shall be paid at one and one half(1'�)times the regular shift rate for the first eight(8)hours.All other hours worked Monday through Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. All hours worked Petween the hours of 6:00 pm and 6:00 am,Monday through,u S su da,,.shall be paid at a premium rate of 20%over t e hourly rate of wage.All hours worked on Sunda_,- , , w ()aid ac one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve(12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight,(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, and all hours on Sunday shall be paid at double the hourly rate of wage.All hours worked on Labor Day shall be paid at three times the hourly rate of wage. I. The First eight(8)hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of eight(8)per day on Saturdays shall be paid at double the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. J. The first eight(8)hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of eight(8)hours on a Saturday shall be paid at double the hourly rate of wage. All hours worked over twelve(12)in a day,and all hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage. K. All hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage,so long as Saturday is the sixth consecutive day worked. All hours worked over twelve(12)in a day Monday through Saturday,and all hours worked on,Sundays and Holidays shall be paid at double the hourly rate of wage. L. The first twelve(12)hours worked on a Saturday shall be paid at one.and one-half times the hourly rate of wage.All hours worked on a Saturday in excess of twelve(12)hours shall be paid at double the hourly rate of pay.All hours worked over twelve(12)in a day Monday through Friday,and all hours worked on Sundays shall be paid at double the hourly rate of wage.All hours worked on a holiday shall be paid at one and one-half times the hourly rate of wage, except that all hours worked on Labor Day shall be paid at double the hourly rate of pay. 5 Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 4. M. All hours worked on Sunday and Holidays shall be paid at double the hourly rate. Any employee reporting to work less than nine(9)hours from their previous quitting time shall be paid for such time at time and one-half times the hourly rate. N. All hours worked in Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays,and all work performed between the hours of midnight(12:00 AM)and eight AM(8:00 AM) every day shall be paid at double Lhe hourly rale of wage. O. All hours worked between midnight Friday to midnight Sunday shall be paid at one and one-half the hourly rate of wage. After an employee has worked in excess of eight(8) continuous hours in any one or more calendar days,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of six(6) hours or more. All hours worked on Holidays shall be paid at double the hourly rate of wage. P. All hours worked on Holidays shall be paid at one and one-half times the hourly rate of wage. Q. The first four(4)hours atter eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve(12)hours Monday through Saturday shah be paid at doubie the hourly rate. PL4 hours worked on Sundays and holidays snail m pard at double the hourly rate of wage. R. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage,so long as Saturday is the sixth consecutive day worked. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. S. All hours worked on Saturdays and Holidays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays shall be paid at double the hourly rate of wage. T. The first two(2)hours of overtime for hours worked Monday-Friday shall be paid at one and one-half times the hourly sate of wage.Allurs worked in excess of ten(10)hours per day shall be paid at double the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.For work on Saturday which is scheduled prior to the end of shift on Friday,the first six(6)hours work shall be paid at one and one-half times the hourly rate of wage,and all hours over(6)shall be paid double the hourly rate of wage.For work on Saturday which was assigned following the close of shift on Friday,all work shall be paid at double the hourly rate of wage. U. The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.(Except on makeup days if work is lost due to inclement weather,then the first eight(8)hours on Saturday may be paid the regular rate.)All hours worked over twelve(12) hours Monday through Saturday,and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. , V. Work performed in excess of ten(10)hours of straight time per day when four ten(10)hour shifts are established or outside the normal shift(5 am to 6pm),and all work on Saturdays,except for make-up days shall be paid at time and one-half(1 ''/Z)the straight time rate. In the event the job is down due to weather conditions,then Saturday may,be worked as a voluntary make-up day at the straight time rate.However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday.All work performed on Sundays and holidays and work in excess of twelve(12)hours per day shall be paid at double(2x) the straight time rale of pay. After an employee has worked eight(8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours. When an employe6 returns to work without a break of eight(8)hours since their previous shift,all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8)hours. 6 Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 4. W. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions)shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. When an employee returns to work without at least eight(8)hours time off since their previous shift,all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight(8)hours. X. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.Work performed outside the normal shift of 6 am to 6pm shall be paid at one and one-half the straight time rate,(except for special shifts or three shift operations). All work performed on Sundays and holidays shall be paid at double the hourly rate of wage.Shifts may be established when considered necessary by the Employer. The Employer may establish shifts consisting of eight(8)or ten(10)hours of work(subject tQ WAC 296-127-022), that shall constitute a normal forty(40)hour work week.The Employer can change from a 5-eight to a 4-ten hour schedule or back to the other. All hours of work on these shifts shall be paid for at the straight time hourly rate.Work performed in excess of eight hours(or ten hours per day(subject to WAC 296-127-022)shall be paid atone and one- half the straight time rate. When due to conditions beyond the control of the Employer,or when contract specifications require that work can only be performed outside the regular day shift,then by mutual agreement a special shift may be worked at the straight time rate,eight(8)hours work for eight(8)hours pay. The starting time shall be arranged to fit such conditions of work. When an employee returns to work without at a break of eight(8)hours since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8)hours. Holiday Coded 5. A. Holidays: New.Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays:New Year's Day,Presidents' Day,Memorial Day,Independence Day,Labor DAy,'Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day(8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). H. Holidays:New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6). 1. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, and Christmas Day (6). J. Holidays:New Year's Day,Memorial Day,Independence Day,Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). K. Holidays: New YFar's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9). 7 Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 S. L. Holidays:New Year's Day,Martin Luther King Jr.Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day,And Christmas Day(8). N. Holidays: New Years Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday Atter Thanksgiving Day,The Day Before Christmas, And Christmas Day(9).If A Holiday Fails On Sunday,The Following Mondal Shall Be Consideree]As A Holiday, Q. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,and Christmas Day(6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day.(7 1/2). S. Paid Holidays:New Year's Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And The Day Before Or After Christmas(9). Z. Holidays:New Year's Day, Memorial Day, Independence Day,Labor Day,Veterans Day, Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day(8). Roliday Code; Continued 6. A. Paid Holidays:New Year's Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). i E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and a Half- Day On Christmas Eve Day.(9 1/2). G. Paid Holidays:New Year's Day,Martin Luther King Jr.Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and Christmas Eve Day(11). H. Paid Holidays:New Year's Day,New Year's Eve Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(10). I. Paid Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,The Last Working Day Before Christmas Day,And Christmas Day(9). Z. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday,the following Monday shall be considered as the holiday. 8 Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8).Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays:New Year's Day,Martin Luther King Jr.Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding-friday. D. Paid Holidays: New Year's Day,Memorial Day,Independence Day,Labor Day,Veteran's Day,Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day before Christmas day and Christmas day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays:New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays:New Year's Day,Martin Luther King Jr.Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays:New Year's Day,President's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day,The Day Before Christmas Day And Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays:New Year's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day and Christmas Day(6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 9 Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 7. L. Holidays:New Year's Day,Memorial Day,Labor Day,Independence Day,Thanksgiving Day,the Last Work Day before Christmas Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,And the Day after or before Christmas Day (10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thank.,=_i ;ag Day#And Christmas Day(7).Any holiday which falls on a Sunday shall be observed as a holiday on the foiiii,i;,1'1on�c?ay. Q, Holiday?: Ncw Ycar'.a ratty, Memorial My, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.If any of the listed holidays.falls on a Saturday,the preceding Friday shall be a regular work day. R. Paid Holidays: New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday.If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, Friday after Thanksgiving Day,Christmas Day,the Day after Christmas,and A Floating Holiday(9).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. T. Paid Holidays: New Year's Day, the Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and The Day after or before Chfstn'as Day_(10). If any of the listed holidays falls on a Sunday,the day.observed by the Nation shall be considers a holiday and compensated accordingly. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. V. Holidays:New Year's Day,President's Birthday,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day,Christmas Day,the day before or after Christmas,and the day before or after New Year's Day. If any of the above listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. W. Holidays:New Year's Day, Day After New Year's, Memorial Day,Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Eve Day,Christmas Day,the day after Christmas,the day before New Year's Day,and a Floating Holiday. X. Holidays:New Year's Day,Day before or after New Year's Day,Presidents'Day,Memorial Day,Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day before or after Christmas day.If a holiday falls on a Saturday or on a Friday that is the normal day off,then the holiday will be taken 10 r, Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 on the last normal workday.If the holiday falls on a Monday that is the normal day off or on a Sunday,then the holiday will be taken on the next normal workday. 7. Y. Holidays:New Year's Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,and Christmas Day.(8)If the holiday falls on a Sunday,then the day observed by the federal government shall be considered a holiday and compensated accordingly. Z. Holidays:New Year's Day,President's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. Hold"Codes Continued 15. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the day before Christmas Day and Christmas Day.(8)Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. B. Holidays:New Yjar's Day,Martin Luther King Jr.Day,President's Day,Memorial Day,Independence Day,Labor Day,Veteran's Day,Thanksgiving Day,and Christmas Day.(9) C. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the day before Christmas Day and Christmas Day.(8) D. Holidays:New Year's Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day,Christmas Day,and the day after Christmas. E. Holidays:the day before New Years's Day,New Year's Day,Martin Luther King,Jr.Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Veteran's Day,Thanksgiving Day,Friday after Thanksgiving Day,the day before Christmas,and Christmas Day.(12) Nate Codes 8. D. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows-Level A: $0.75,Level B: $0.50, And Level C:$0.25. M. Workers on hazn>`at projects receive additional hourly premiums as follows: Levels A&B: $1.00,Levels C &D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$1.00,Level B:$0.75,Level C:$0.50,And Level D:$0.25. P. Workers,on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit:$1.50, Class C Suit:$1.00;And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid. 11 Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 8. S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31, 2012. T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle,and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. U. Workers on hazmat projects receive additional hourly premiums as follows—Class A Suit:$2.00,Class B Suit:$1,50, And Clad C Shit-$1.00.Workexc nerfnrminv_undervrmind wnrk rw.eive an additional$0.40 per hoar for any and all work performed underground, including operating, servicing and repairing of equipment. The premium for underground work shall be paid for the entire shift worked.Workers who work suspended by a.rope or cable receive as additional$0.50 per hour.The premium for work suspended shall be paid for the entire shift worked.Workers who do"pioneer"work(break open a cut,build road,etc.)more than one hundred fifty(150)feet above grade elevation receive an additional$0.50 per hour. V. In addition to the hourly wage and fringe benefits,the following depth and enclosure premiums shall be paid.The premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. The premiums are to be paid one time for the day and are not used in calculating overtime pay. Depth premiums apply to depths of fifty feet or more.Over 50'to 100'-$2.00 per foot for each foot over 50 feet.Over 101'to 150'-$3.00 per foot for each foot over 101 feet.Over 151'to 220'-$4.00 per foot for each foot over 220 feet. Over 221'_$5.00 per foot for each foot over 221 feet. Enclosure premiums apply when divers enter enclosures(such as pipes or tunnels)where there is no vertical ascent and is.measured by the distance travelled from the entrance.25' to 300'-$1.00 per foot from entrance.300'to 600' -$1.50 per.foot beginning at 300'.Over 600'-$2.00 per foot beginning at 600'. W. Meter Listallers,work on single phase 120/240V selflcontained residential meters.The Lineman/Groundmen rates would apply to meters not fitting this description. X. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit: $1.50,Class C Shit:$1.00,and Class D Suit:$0.50.Special Shift Premium:Basic hourly rate plus$7.00 per hoar When due to conditions beyond the control of the Employer or when an owner(not acting as the contractor),a government agency or the contract specifications requires that work can only be performed outside the normal 5 am to 6pm shift,then the special shift premium will be applied to the basic hourly rate.When an employee works on a g)ccia 1 _lhift. Lh,y sllal be paid a.•peciad shift premium for each hour worked unless they are in OT or Double-time status. For exam:1k:,the special shill premium does not waive the overtime requirements for work performed on Saturday or Sunday.) Y. Tide Work:When employees are called out between the hours of 6:00 p.m.and 6:00 a.m.to work on tide work (work located in the tide plane)all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage[Boatswains Chair:Employees working on a swinging state or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents($0.75)per hour above the classification rate. 12 Benefit Code Key—Effective 8/31/2019 thru 4/1/2020 8. Z. Workers working{ith supplied air on hazmat projects receive an additional$1.00 per hour. Special Shift Premium:Basic hourly rate plus$2.00 per hour.When due to conditions beyond the control of the Employer or when an owner(not acting as a contractor),a government agency or the contract specifications require that more than(4)hours of a special shift can only be performed outside the normal 6 am to 6pm shift,then the special shift premium will be applied to the basic straight time for the entire shift.When an employee works on a special shift,they will be paid a special shift premium for each hour worked unless they are in overtime or double- time status.(For example,the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) Note Codes Continued 9. A. Workers working with supplied air on bazmat projects receive an additional$1.00 per hour. Special Shift Premium: Basic hourly rate plus$2.00 per hour. When due to conditions beyond the control of the Employer or when an owner(not acting as the contractor),a government agency or the contract specifications require that more than four(4)hours of a special shift can only be performed outside the normal 6 am to 6pm shift,then the special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a special shift,they shall be paid a special shift premium for each°hour worked unless they are in overtime or double- time status.(For example,the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) Certified Crane foerator..Premium: Gane operators requiring certifications shall be paid$0.50 per hour above their classification rate. Boom Pay Premium: All cranes including tower shall be paid as follows based on boom length: (A)—130'to 199'—$0.50 per hour over their classification rate. (B)—200'to 299'—$0.80 per hour over their classification rate. (C)—300' and over—$1.00 per hour over their classification rate. B. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the shift shall be used in determining the scale paid. Tide Work:When employees are called out between the hours of 6:00 p.m.and 6:00 a.m.to work on tide work(work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair:Employees working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. C. Tide Work:When employees are called out between the hours of 6:00 p.m.and 6:00 a.m.to work on tide work(work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair:Employees working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. Effective August 11,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary,traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.These classifications are only effective on or after August 31,2012. 13 f'rit;eh' OF 14 State of Washington Department of Labor & Industries Prevailing Wage Section-Telephone 360-902-5335 PO Box 44540,Olympia,WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAG4 listen Here include both the hourly wage rate and the hourly rate of fr inni,?benefits:On Public works projects,workers wage and bene6z rates must add to not less than this total.A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 09/05/2019 County Trade Job.Classification ! Wage HolidayfGyartime Note CRlisk King Asbestos Abatement Workers lJourney Level I $50.86 5D 1H View Ming Boilermakers Journey Level $69.04 5N 1C I view King iBrick Mason Journey Level 1 $58.821 5A 1M I Viww King Brick Mason Fainter-Caulker-Cleaner J $58,821 5A 1M i View, King Building 5ervice_Em_ptoyees ;Janitor $25.58 5S 2F 'Jiew King 8uildinq Service Em 1p oyees Traveling Waxer/Shampooer $26.03 5S 2F view King '3u+lSir3s3Service Ernpk_oyrvti_ (Window Cleaner(Non- $29.33 55 7z View `Scaffold) + I 1 King JrZ,tic3+nqr icfII>vc:'s "Window Cleaner(Scaffold} $30.33 55 { 2F f View Kies; 'Calainet_wiakers 'In Shop." l - _ Q., (Journey Level $22.74) King ICarpencerS lAcoustical Worker $62.44 7A I 4C 1 vicN King {Carpenters Bridge, Dock And Wharf $62.44 7A 4C View ,Carpenters 4 King Czirp!7�r.ters icarventer $62.44 ZA Vl rr King Csrpenter•� Icarpenters on Stationary $62.57 7A View Tools King Carpenters Creosoted Material $62.54 7A 4C View King I Care;rt.r; Floor Finisher $62.44 7_A View King 1gikrpentersFloor Layer $62.44 7A 4C View King Cx "r"nter s Scaffold Erector $62.446 7A 4� aiew King Cement Masons JApptication of all $62.97 7A 4U View Composition Mastic King Cement Masons Application of all Epoxy $62.47 7A 4U View Material King Cement Masons Application of all Plastic $62.97 7A 4U View Material King Cement Masons Application of Sealing $62.47 7A 4U View (Compound King Cement Masons ~Application of Underlayment $62.97- 7A 4U View King Cement Masons Building General $62.47' 7A 4U Vl -- —. King Cement Masons Composition or Kalman $62.97 Z6 41.1 View (Floors I '— Kmg Cement Masons [Concrete Paving $62.47 7A 41J View <r+�g Cement Masons ?Curb Ft Gutter Machine $62.971 7A 1 41) View https.Nfortress. a.giivlhtilwagelaokuplpn Wa6eh+�kup.aspx 8128/2019 I Page 2 of 19 King (.erneiit Masons Curb ft Gutter, Sidewalks '562.47 7A st View King Cement Masons Curing Concrete $62.47 7A 4U View King Cem nt Masons Finish Colored Concrete $62.97 7A 4U View King Cement Masons Floor Grinding $62.971' ZA 4U i View King Cement Masons Floor Grinding/Polisher $62.47 7A 4U Vi King Cement Masons Green Concrete Saw,self- $62.97 7A ' tI View - powered King Cement Masons Grouting of,all Plates $62.47 7A 40 View King Cement Masons lGrouting of all Tilt-up Panels $62.47 7A 4U View King Cement masons Gunite Nozzleman $62.97 7A 4U View King Cement Masons Hand Powered Grinder $62.97 7A 4U View KinCement Masons Journey Level $62.47 7A 4U Yiew Kina Cernent-Masi, :Patching Concrete 562.47: 7A 4U 1 View King Cement Masons Pneumatic Power Tools $62.97 7A 4UI I View King f7Pmpror Mann; Power Chiopin4 It Brushing I S62.971 7A I 4UI I yiQw 4U View King Cer newt Nasons Sand Blasting Architectural $62.97 7A Finish Xing Cement Masons Screed&Rodding Machine 1 562.97 7A 4U V1 King Cement Masons Spackling or Skim Coat $62.471 7A 4U View Concrete King Cement Masons Troweling Machine Operator $62.97 7A 4U View King Cement Masons Troweling Machine Operator 562.971 7A 4U View on Colored Slabs King. CerrFept Masons Tunnel Workers $62.97 7A 4U View King Divers Fr Tenders Belt/Vehicle or Submersible 1$116.24 7A View Operator(Not Under Pressure) King Divers Fr Tenders Dive Supervisor/Master $79.231 7A 4C Viee- King Vie- KingDivers fe Tenders Diver 5116.201 7A 4C 8V Vrew King Divers li Tenders Diver On Standby $74.231 7A 4C view Kinq Divers Ft Tenders Diver Tender $67.31 7A 4C View King Divers fi:Tenders IManifoid Operator $67,311 7A 4C vi�•w King Divers Ct Tenders Manifold Operator Mixed Gas $72.31 7A 4C w er+ King Divers It Tenders Remote Operated Vehicle $67.31 7A 4C View :Operator/Technician King Divers&Tenders Remote Operated Vehicle $67.31 7A 4C View Tender King Dredge^t rker, Assistant Engineer $56.44= 5D 3F view King Dredge Workers Assistant Mate(Deckhand) $56.001 5D 3F View icing Dred.ge_Workers Boatmen ; $56.44! 5D 3F j View King t?red_qiZ workers jEngineer Welder $57.51 50 3F View King Dredge Workers Leverman, Hydraulic $58.67 5D 3F View King I?redge Workers Mates $56.44 5D 3r View King Dregg! Workers Oiler $56.00 5D 3F View King Q ywall-AR licatar Journey Level $62.44 5D j 1H View King Drywal',Tapers ;Journey Level $62.94 5P 1E view King Journey Level $30.59 5L IE i View htips://rorreess-wa:gov Inil'WageluokupiprvWugeiookup.aspx 812812019 r Page.3 ul'19 King I Electricians Inside table Splicer $83.171 7C 4E view King IElectri�cians- Inside (Cable Splicer(tunnel) $89.341 7C I 4E vis;w KingIE=_zctl ric�an - inside ;Certified Welder $80.361 7C 4E View King Electricians -Inside Certified Welder(tunnel) $86.251 7C 4E Vieww rf itvr King Electricians Inside Construction Stock Person $41.488 7C 4E V }ting Electricians- Inside _ (Journey Level $77.551 7C 4E 1 View King Electricians- Inside Journey Level(tunnel) $83.171 7C 4E j Vicwv King Electricians - Motor.$b!qp Journey Level $45.081 5A 1 B V King Electricians-Powerline Cable Splicer $79.60 5A 4D View Construction King Electricians Powerline f Certified Line Welder $72.98 5A 4D View Construction 4 King Electricians-Powerline Groundperson $47.94 5A 4D f View Construction King Electricians- Powerline Heavy Line Equipment $72.98 5A 4D View Construction Operator King Elearicians -Prwurline Journey Level Lineperson $72.98 5A 4D View I'OnSlructwr-' King Electricians-Powerline Line Equipment Operator $62.06 5A 4D View Constructiart King 'Electricians-P__owerline Meter Installer $47.94 5A 40 8W View Construction King (Electricians-Powerline ;Pole Sprayer $72.98 5A 4D View !Construction King Electricians-P.owerline jPowderperson $54.55 5A 4D View Construction 8 King Electronic Technicians Journey Level $51.071 7E 1E View King Elevator Constructors (Mechanic $94.22 7D 4A Vi King Elevator Constructors WechanicIn Charge $101.731 7D 4A Vketinr King Fabricated Precast Concrete ,All Classifications-In- $1 8.25F 5B IR View Products Factory Work Only King Fence Erectors Fence Erector $43.11 i7A 4V 8Y View Kirg Fence Erectors Fence Laborer $43.11 7A 4V 8Y View King riaclser3 Journey Level $43.11 7A 4V 8Y VVI King Gliders Journey Level $66.51 7L 1 Y View King Heat Et Frost Insulators AndJourneyman $76.61 5J 4H View Asbestos Workers King Hating Et uipment Journey Level $85.88 7F 1E View Mechanics King Hod Carriers Er Mason Journey Level $52.44 7A 4V BY View Tenders King Industrial Poter Vacuum Journey Level $12.00 1 View Cleaner I KI'g Inland Boatmen GBoat Operator $61.411 5B IK View Kang Inland Boatmen Cook $56.48 56 1K View King Inland Bo,: men IDeckhand 557.48 5B 1K w King `Inland Boatmen �Deckhand Engineer $58.911 5B 1K View hops 1-furtjcss.wa,gav/lai;wageloukup,'pry h�gclookup.asps 8/28/2019 Page 4 OF 19 King Inland BoatmeT____T1 Launch Operator $58.89: �B 1K , view King Inland Boatmen Mate 1 $57.311 5B 1K view King 1CLeaner Operator, Foamer $31.49 1 View Of Sewer Et Water Svstems WOperator Remote Control King 11::t_r WP Grout Truck Operator $12.00 1 View Remo C�nr' * tr�L King lnspertiastil .-- r_�* a :ig Head Operator $24.91 1 View Of Sewer Et Water Systems By, Remote Controi King !nsper::no':-:r•an'sn /Sealing Technician $19.33 1 View Of Sewer&stater sysltms N Remote Control King Y TvTruck Operator I $20.451 ` 1 II I View + fSewerE;WaterLWrr8 4pomn6.rnntrnl King Insulation Applicators lJourney Level S62.441 7A I 4C View uinc� Ironworkers 'Journeyman S72.13i 7N 10 View King Laborers 'Air,Gas Or Electric Vibrating V $50.86( 7A 4v 8Y 'view 15creed King Laborers JAirtrac Drill Operator $52.44; 7A 4V 8Y View xMg Laborers Ballast Regular Machine 1 $50.861 7A I 4V SY I Vie,v King I. + 'Batch Weighman $43.1'(1 7A i 4V $Y ' •riew King:Laborers lBrick Pavers 1 $50.86] 7A 4V 8Y View King JLaborers 18rush Cutter $50.861 7A 4V 8Y 1 thew King wLaborers ;Brush Hog Feeder $50.86; lA 4V 8Y ve King Laborers ;Burner $50.861 7A 4V 8Y `ri w King (Laborers 1caisson Worker ? $52.44 7A ! SY view 1<111.g Laborers Carpenter Tender $50.86 7A 4V BY View King JLaborers 'Cement Dumper-paving _ S51.80! 7A� 4V 8Y ° view King Labdre_rs ICement Finisher Tender $50.861 7A 4V 8Y , view King Laborers I Change House Or Dry Shack $50.661 7A 4V BY view King laborers Chipping Gun (30 Lbs. And ; $51.80• 7A 4V 8Y View 1 Over) 1 King JLaborers Chipping Gun (Under 30 Lbs.)j $50.861 7A 4V 8Y view ;Sing Laborers Choker Setter $50 68 7A 4V 1 �Y i view Kin g �Laborcr; !ChuckTcnder $50.861 7A 4V I 8Y 'Jic rf King i.aborers Clary Power Spreader 1 $51.80 7A 4V 8Y ± view King `Laborers Clean up Laborer $50.86, 7A 4V 8Y r vLew King laborers Concrete Dumper/Chute I $51.801 7A 4V 8Y 1 View 'Operator ' King I aboici-s Concrete Form Stripper l $50.861 7A 4V ; 8Y I view u.ing Labo!zrs Concrete Placement Crew 1 $51.80 7A 4V EBY w King Laborers Concrete Saw Operator/Core $51.801 7A 4V 1 SY View Drilter King_Laborers Crusher Feeder f $43.111 7A V 8Yyr view King Laborers i ?Curing Laborer ! $50.86 7A 4V I-8Y vicrw httpsalfartresss4a.gov�inUwsgaloukupiprvlY'ageluokup.upx 8/1A12019 Page 5or19 King Liborers Demolition: Wrecking ft $50.86 7A 4V 8Y View Moving(Incl. Charred Material King Laborers Ditch Digger $50.86 7A 4V 8Y .y5fw King Laborers Diver $52.44 7A 4V 8Y View King Laborers Drill Operator(Hydraulic, $51.80 7A 4V $Y View Diamond) King Laborers Dry Stack Walls $50.861 7A 4V 8Y vier. King Laborers Dump Person $50.86) 7A 4V BY View King Laborers Epoxy Technician $50.86 7A 4V 8Y Vlew King Laborers Erosion Control Worker $50.86` 7A 4V Y Kinn Laborers jFaller it Bucker Chain Saw 1 $51.80 7A 4V BY View King Lgorers Fine Graders $50.86 7A 4V BY Vtew King Laborers Firewatch $43.11 7A 4V 8Y View King Laborers Form Setter $50.86 7A 4V 8Y View King Laborers Gabian Basket Builders S50.86_ 7A 4V BY, View King Labarers General Laborer $50.86 7A 4V 8Y View King Laborers Grade Checker ft Transit $52.44 7A 4V BY View Person King Laborers Grinders $50.86 7A 4V BY View King Laborers Grout Machine Tender $50.86 7A 4V 8Y View King Laborers lGroutmen (Pressure) $51.80 7A 4V BY View Including Pnst Tension Beams King La orers Guardrail Erector $50.86 7A 4V 8Y View King Laborers Hazardous Waste Worker $52.44 7A 4V 8Y View (Level A) King Laborers Hazardous Waste Worker $51.80 7A 4V 8Y View (Level B) King Laborers Hazardous Waste Worker $50.86 7A 4V BY View (Level C) 1"j, Laborers (High Scaler $52.44 7A I 4V 8Y View e::n.; PLaborers IJackhammer $51.80 7A 4_V 8Y View ictr•.; Laborers laserbeam Operator $51.80 7A 4V 8Y view Kinn Laborers IMaintenance Person­__ $50.86 7A 4V SY View icing Lahoreu IManhote Builder-Mudman $51.80 7A 4V BY View King Laborers Material Yard Person $50.86 7A 4V 8Y V_g_w King Laborers [Motorman-Dinky Locomotive $51.80 7A I 4V BY View King Laborers +Nozzleman (Concrete Pump, $51.80 7A [ 4V 8Y View Green Cutter When Using Combination Of High Pressure Air ft Water On Concrete Ft Rock, Sandblast, Gunite, Shotcrete,Water Blaster, Vacuum Blaster) King Laborers ;Pavement Breaker $51.80 7A 4V SY View King Laborers Pilot Car $43.11 7A 4V8Y View King Laborers Pipe Layer Lead $52.44 7A 4V LY Vi w King Laborers Pipe Layer/Tailor $51.80 7A 4V 8Y View https:L'io,tress.wa.gov/1ni,,'WagelookupipryWagelookup uspx 8/29/2019 Page 5 of 19 King 1.ilbarurIPip-Pot Tender $51.80 7A 4V BY _ r ._ King Laborers _Pipe Reliner $51.801 7A 4V ) 8Y View King Lat_rgrers rtPipe Wrapper S51,801 7A 4V BY Virg King Laborers Pat Tender $50.86' 7A 4V 8Y View King Laborers Powderman S52.441 7A 4V SY View King Laborers Powderman's Helper S50.861 7A 4V 8Y View King Laborers Power Jacks $51.80 7A 4V eY view King Laborers Railroad Spike Puller-Power $51.80 7A� 4V 8Y View King Laborers Raker-Asphalt S52.44 7A 4V BY View King Laborers 'Re-timberman $52.44 7A 4V BY View King Laborej IReniaLe Equipment Operator $51.80 7A 4V §Y . View King Laborers Rigger/Signal Person $51.80 _7A 4V 8Y Vv 1\II+'S I orars ..I.v"UP II�T�� 1`Sll OCA L± I civ � V I �abyl cis .I�IY IwN r cl aanl ���.uu. �H +iCir King ILgborers ]Rivet Buster $51.80 7A 4V Y View Alrl4j L6UV�C!] RVUUCI aJ f.OVj 7A E YY S_Y YitVr King LaborersScaffold Erector $50.86 7A 4V I 8Y View King Laborers IScale Person_ $50.86 7A 4V 8Y Vlew KinnLaborers ISIoper(Over 20") $51.80 7A 4V 8Y view Kinn 1 ahnrPrs Sinner 5prayPr $50:86 7A 4V SY View Krug LabuteEa 1!Spleader (Cunuele) $51.80 7A 4V 8Y 4 View King Lab_V.refs !Stake Hopper _ $50.86 7A 4V 8Y View KinLaborers Stock Piler $50.86 7A 4V 8Y view King - King Laborers Swinging Stage/Boatswain $43.11 7A 4V BY View Chair King Laborers Tamper B:Similar Electric, $51.80 7A 4V 8Y View Air rt Gas Operated Tools King Laborers Tamper(Multiple rt Self- $51.80 7A 4V BY View propelled) King Laborers Timber Person-Sewer $51.80 7A 4V BY View (tagger,Shorer ft Cribber) King Laborers Toolroom Person (at Jobsite) $50.86 7A 4V BY View - King Laborers Topper $50.86 7A 4V LY, View King L borers Track Laborer $50.86 7A 4V 8Y View King Laborers Track Liner(Power) $51.80 7A 4V BY View King Laborers Traffic Control Laborer 546.10 7A 4V 9C View King Laborers ITraffic Control Supervisor $46.10 ZA 9y QL y= King Laborers I Truck Spotter $50.86 7A 4V 8Y View Kin Laborers, Tunnel Work-Compressed King Laborers Tugger Operator $51.80 7A 4V BY Ver King p ssed Air $120.61 7A 4V 96 View Morker 0.30 psi King Laborers Tunnel Work-Compressed Air ;$125.64 7A 4V 9B View Worker 30,01-44.00 psi _ King Laborers Tunnel Work-Compressed Air x$129 32; 7A 4V 9B View Worker 44.01-54.00 psi_ _ King Laborers Tunnel Work-Compressed Air $135.02., 7A 4V 9B View _ Worker 54.01-60.00 psi King jLaborers $137.1.11 7A 4V 9B View haps://'ortreSN'wn.go:v/lni/wagelnvkup/prvWagelt)okup uspx 8/2812019 S Pnge 7 of l9 Tuni.O4 Work-Compressed Air Vworker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $142.24 7A 4V 9B View Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $144.14 7A 4V 9B- View Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $146.14 7A 4V 9B View Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air 5148.14 7A 4V 98 View Worker 72.01-74.00 psi King Laborers iTunnel Work-Guage and Lock j $52.54 7A 4V 8Y View iTender _ k King Laborers Tunnel Work-Guage and Lock $52.54 7A 4V 8Y View iTender _ King Laborers (Vibrator $51.80 7A 4V i 8Y Vieve King Laborers Vinyl Seamer i $50.86 7A 4V- 8Y8Y vie'rr 7 King Laborers Watchman $39.18, 7A 4V 8Yy!ow__ Kirrg Laborers Welder $51.80] 7A 4V 8Y Vi Kin Laborers Well Point Laborer 551.M A 4V BY King 80� 7A 4V 8Y View King Laborers 1 Window Washer/Cleaner $39.18 7A 4V 8Y View King Sewer r Water .g. f p 7A 4V 8Y View Kin Laborers Under rpund General Laborer Et To man $50.66 King 1-borers -Unde_grwid Pipe Layer $51.80 7A 4V 8Y view r Et te SeweWar King t_.IrLEcape Constructor, Landscape $39.18 7A 4V 8Y View Construction/Landscaping Or Planting Laborers King landscape Construction Landscape Operator $68.02 7A I 3K 8X _l View King Landscape Maintenance Groundskeeper $17.87 1 1 View King Lathers ,tourney Level $62,44 51D l 1H View King Marble Setters Journey Level $58.82 5A 1M View King Metal FabriLgtiorr Ir,Shape Fitter $15.86 1 View King metal Fabncatxan ..n_Shopl. Laborer $12.00 1 View King Metal Fabrication (in Shop) Machine Operator S13.04 i View King hletai F0!jpcation inn 5tiopi Painter $12.00 1 View King Rental Fabrication IIn Shop) Welder $15.48 1I View King M±l t h Journey Level $63,44 7A 4C j View King Modular 8uildines Cabinet Assembly $12.00 1 View King Modular Btiildln&s Electrician $12.00 1 View King ModularBl,Jtdings Equipment Maintenance : $12.00 1 View King Moduiar;5uildi2m Plumber $12.00 1 1 View King Modular Buttins Production Worker $12,00 1 View King Modular Buil in-,,-5 Tool Maintenance $12.00 1 View King AMacluiar_3uRdinsLs Utility Person $12.00 1 View King Modular Buildinqs Welder _ $12.00 1 view King Painters Journey Level $43.40 6Z 2B View King Pile Driver Icrew Tender $67.31 7A 4C I View King Pile Driver .Crew Tender/Technician $67.31 7A 44C Yiew htipsr//fortress.wa.gov/Inilwuicionkup/prvWagelookup.aspx 8/28/2019 Page R of 19 King Ptle Orrver H%joerbarsc Worker- $77-93 7A 4C View Compressed Air Worker 0.30.00 PSI King Pile Driver Hyperbaric Worker- $82.93 7A 4C View Compressed Air Worker 30.01 -44.00 PSI King Pile Driver Hyperbaric Worker- $86.93 7A 4C View Compressed Air Worker 44.01 54.00 PSI King Pile Driver jHyperbaric Worker- $91.93 7A 4C View !Compressed Air Worker 54.01 60.00 PSI King Pile Driver !IHyperbaric worker- $94.43 7A 4C View 11 f C(.mp a-tt Air Worker 60.01 --", -- _....._ King Pile Driver 1Hyperbaric Worker- $99.43'; 7A 4C View Compressed Air Worker 64.01, ,-68.00 PSI ! King Pile Driver Hyperbaric Worker "$101.43' 7A 4C View ,Compressed Air Worker 68.01 s 70.00 PSI King PRe Driver Hyperbaric Worker- $103.431 7A 4C View Compressed Air Worker 70.01 -72.00 PSI I King Pile Driver Hyperbaric Worker- t$105.43 7A 4C View Compressed Air Worker 72.01 -74.00 PSI _ KingPile Driver Journey Level $62.69 7A 4C View King lia-5 t-Cr C JiDurney Level -- $59.42 M 1R View King Playground 5 mark 1Journey Level 1 $12.001 1 View E.�r ui�m@nP InsCalfe�s i F Kira Plumbers&Pipefitters Journey Level $87.69' b_Z f G V_ New King Power Ewquiment Operators Asphalt Plant Operators # $69.16! 7A 3K SX View King Power Equipment gators Assistant Engineer P $65.05 7A 3K 8X view King I Power_Equlpment Operators Barrier Machine(zipper) j $68.551 7A 3K 8X I View King Power Equ,spment ODeratsars Batch Plant Operator: ' $68.55 7A 3K SX View 'concrete Hing Power�� E,,jut�? L nt.U 9Er toys Bobcat $65.05 7A 3K SX View King Power Equipment Operators Brokk-Remote Demolition $65.05 7A 3K 8X View Equipment King Power Equipment Operators Brooms $65.05 7A 3K 8X View King Power Equipment Operators Bump Cutter $68.55 7A 3K 8X View Kin Power E ui ment 0 ator; Cableways $69.16 7A 3K 8X View King Power Equiprrrnt_C7pratrr5 Chipper $68.55 7A3K SX View King Power Ecluipinam 0 erators Compressor $65.05 7A 3K 8X View King Power EgulDment ODerators Concrete Finish Machine- $65.05 7A 3K 8X View Laser Screed King Power E_ u: merit Qperators Concrete Pump-Mounted Or $68.02 7A 3K SX T View Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Op.e ators $69.161 7A I 3K SX View l^.ttps:rliiHrr,+:r.wa,;tv;lnvwnLcluo "fp.'grvVVagclaukup.,acti 6/28/2019 hge9ot 19 Concrete Pump:Truck Mount With Boom Attachment Over 2M _ King hpy+or Etc uipmerrt Opgrgt:�r� Concrete Pump:Truck Mount $68,55 7A 3K 8X View With Boom Attachment Up To 42m King Power Ec uiipment Aerators Conveyors $68.02 7A 3K 8X YICLN King Power Ectuigribent Operator_s Cranes friction: 200 tons and $71.26 7A 3K 8X View over King Power i_guipanent,0oratsxs Cranes: 100 tons through 199 $69.85 7A I 3K 8X View tons, or 150'of boom (including jib with attachments) King Power EglLip neat Onerdta7rs Cranes:20 Tons Through 44 $68.55 7A 3K 8X 1 View Tons With Attachments King Power Esrulrament s n atorltor, Cranes:200 tons-299 tans, $70.57 7A 3K 8X View or 250' of boom including jib i with attachments King Power£ ur went Crserators Cranes:300 tons and over or $71.26 7A 8X View 300' of boom including jib with attachments King power Ectuip Hent Qpkrarors Cranes:45 Tons Through 99 $69.16 7A 3K 8X View Tons,tinder 150'Of Boom (including Jib With Attachments) King Power EquiErmentrators JCranes:A-frame-10 Tons $65.05 7A 3K 8X View And Under King Power"c ui_rnenae D_.,ra_turs Cranes:Friction cranes $70.57 7A 3K BX View 'through 199 tons King Power Egut went O2fn3to_rs Cranes: through 19 tons with $68.02 7A 3K 8X View }attachments,A-frame over 10 tons King Power Equipment Operators ICrusher S68.55 7A 3K 8X View King Power 5qulg _;r[_Qperatora iDeck Engineer/Deck Winches $68-55 7A 3K SX View (power) King Power_Equi ment 0 rat;ors I Derricks, On Building Work $69.16 7A 3K 8X View Xing ,Dozers D-9 Et Under $68.02 7A 3K 8X View King Power t uipment. ratcn Drill Oilers:Auger Type, $68-02 7A 3K 8X View Truck Or Crane Mount King Power Equipment OOefators Drilling Machine $69.85 7A 3K 8X View King Power E;gwpL nent t?rstratcrrs Elevator And Man-lift: $65.05 7A 3K 8X View Permanent And Shaft Type King Power i_quipment Oge ators Finishing Machine, Bidwell $68,55 7A 3K eX_ View And Gamaco ft Similar Equipment King Power zqurpment,Ofwr_un Forklift:3000 Lbs And Over $68.02 7A 3K i`8X View With Attachments King roweryuigmeait C? ratgrs (Forklifts: Under 3000 Lbs. $65.05 7A 3K 8X View With Attachments King Power FcIWL)oTen Oprratoq Grade Engineer: Using Blue $68.55 7A 3K 8X View Prints, Cut Sheets,Etc King Ii qww �qwk Tiew Operatp+s Gradechecker/Stakeman $65.05 7A 3K SX View littps://Fortress.wa.gov!lni/wagelookup/prvWagelookup,aspx 8/28/2U 19 S Page 10 or 19 King P_)w �VUI rrient pep it.v.' Guardrail Punch $68.55 7A 3K SX yiew King Power Equipment OperaiorsZuipment rd Tail End Dump $69.16 7A 3K 8X View ticulating Off-Road 45 Yards. 8:Over King p)tiv r Eriwpmo,t%joe'Aw'. rHard Tail End Dump $68.55 7A 3K 8X View (Articulating Off-road (Equipment Under 45 Yards King Power Equiprnr:nt operators Horizontal/Directional Drill $68.02 7A 3K 8X View Locator King Power Equ_pmors HorixontalrDirectional Drill j $68.55 7A 3K 8X View Operator King Prxwe+r Frli,i rmPntQj w-r:ttgr: Hydrakfts/Boom Trucks Over $68.02 7A 1 8X View 10 Tons King 'cwr*r E;LjIL�)m4n,Operators Hydralifts/Boom Trucks, 10 S65.05 7A 3K 8X View _ Tons And Under King jpgwar[term�rar, �a Eat rs Loader, Overhead 8 Yards. li1$69.85� i 3K 8X View ever i I _ King Power Equipment 00 raters Loader,Overhead,6 Yards. $69.16 7A 3K §X View But Not Including 8 Yards King Power rguipmenc upei ataxs Loaders,Overhead Under 6 $68.55 7A 3K 8X 'view Yards King -POWLIC--- u�mefit_C)D fstors Loaders, Plant Feed $6fl.55 7A 3K � ax View King Power Equipment_Otors Loaders:Elevating Type Belt $68.02 7A 3K 8X View King Power Equipment0¢ieratrars Locomotives,All $68.55 7A ` 3K 3X View King Power Etc uipmenL p�eratars Material Transfer Device $68.55 7A 3K 8X view King 's�wz_r Egioipmew L z%tors Mechanics,All(leadmen- $69.85 7A 3K 8X View ,$0.50 Per Hour Over Mechanic) _ King Power Ecppmerlt_ Aerators Motor Patrol Graders $69.16 7A 3K 8X View King Power Egwp fffq Dperatars Mucking Machine, Mole, $69.16 7A 3K 8X View Tunnel Drill,Boring, Road Header And/or Shield King Power Equipment O�peraturs Oil Distributors, Blower $65.05 7A 3K 8X View Distribution 8:Mulch Seeding Operator King Power ErLuen[Operatory Outside Hoists(Elevators And $68.02 7A 3K OX View Manlifts),Air Tuggers,Strato King Power EEagsiament Operators Overhead, Bridge Type $68.55 7A 3K 8X View { Crane: 20 Tons Through 44 1Tons King Power Equipment O ratans 'Overhead,Bridge Type: 100 $69.85 7A 3K 8X View Tons And Over King Powrr E;turpiv nt Opet auort iOverhead, Bridge Type: 45 $69.16 7A 2K 8X View Tons Through 99 Tons King P-ower_Equipment Op�ratars Pavement Breaker 1 $65.05 7A 3K 8X View King pov+rr 1.3r�ryrncr t-7pr ratWr; Pile Driver(other Than Crane $68.55 7A 3K 8X View Mount) j- King Power_f giiipmr t rears Plant Oiler-Asphalt, Crusher $68.02 7A 3_K 8X View King Power Equipment Op?�arprs Posthole Digger,Mechanical $65.05 7A 3K 8X View King Power Equipment Operators Power Plant $65.05 7A 3K 8X view I htips:f/fortress.wa:govllni/wagelookupipry Wagelookup.aspK 8/28/2019 Page r I of 19 King Ypwwr Eq ripme�nt-O apratnrt Pumps-Water $65.05 7A 3K BX View King Power Equipment Operators IQuad 9, Hd 41, D10 And Over $69.16 7A 3K 8X VFw King Pgover Equtpnient Oper i prs Quick Tower- No Cab, Under $65.05 7A 3K 8X View 100 Feet In Height Based To Boom King Power Egwpr etit.Operators ,Re ate Control Operator On $69.16 7A 3K 8X. View :Rubber Tired Earth Moving Equipment _ King Power Equipment Operators Rigger and Gellman $65.05 LA K 8X View King PcrwerEgsti_pment 0 erattars Rigger/Signal Person, $68.02 7A 3K 8X View Bellman (Certified) King Power Equipment Operators iRoRagon $69.16 7A 3K 8X View King Power E_quiRa t O erators Roller, Other Than Plant Mix $65.051 7A 3K 8X View King Power Equipment Operators Roller, Plant Mix Or Multi-lift $68.02 7A 3K 8X Vi w ;Materials , King Power Equr�nent Operatnr:s Roto-mill, Roto-grinder $68.55 7A 3K 8X View King Power Equipment ODerators ,Saws-Concrete $68.02 7A 3K 8X view King Scraper, Self Propelled $68.55 7A i 3K 8X View Under 45 Yards King Power Egsai menr 0 rotors Scrapers-Concrete Et Carry $68.02 7A 3K 8X View 1?e.__ __ All , King Pt vmm Eq UinqnLQpergM Scrapers, Self-propelled:45 ! $69.16 7A 3K 8X View Yards And Over King Power Equipment,gperatars Service Engineers- $68.02 7A 3K 8X View Equipment King Power_E uipment[peratvrs 5hotcrete/Gunite Equipment $65.05 7A 3K 8X View King Power Eguipment O rattail Shovel,Excavator, Backhoe, $68.02 7A 3K 8X View Tractors Under 15 Metric Tons King Power Equtprnent Operatcxs Shovel, Excavator,Backhoe: $69.16 7A 3K BX View Over 30 Metric Tons To 54 Metric Tons King i'gw±yr ggWpmetrt jplintui Shovel, Excavator, Backhoes, $68.55+ 7A 3K 8X View Tractors: 15 To 30 Metric Tons i King Power E.quipmenLfetors Shovel, Excavator, Backhoes: $69.85 7A 3K 8X View Over 50 Metric Tons To 90 Metric Tons King Power £q-ulpment operators Shovel, Excavator,Backhoes: $70.57 7A 3K 8X View Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $69.161 7A 3K 8X View King P'qv r E uyipSpreader,Topsider fi $69.16 7A 3K 8X .View Screedman .— . King Power Equipment Operators Subgrader Trimmer $68.55 7A 3K 8X View King Power Equip ent Operators Tower Bucket Elevators $68.02 7A 3K BX V_�w King Power Equip enc, Tower Crane Up To 175'In $69.85 7A 3K 8X View Height Base To Boom King Vq)nv6uiRmenr 01,'-,.om,�rs Tower Crane: over 175' $70.57 7A 3K 8X View through 250'in height, base to boom https:l/rortycis.wa-guvlhii/wagelookup/prvWagelookup.aspN 8/2812019 Page 12(if 19 King power Fgt,t m t Ujr arurs Tower Cranes: over 250'in $71.26 7A 3K BX View height from base to boom King Pr}wr r tigtrinrt;enc Op+eraror Transporters, All Track Or $69.16 7A 3K 8X 1view Truck Type f King Power Equipment,Operators Trenching Machines $68.02 7A 3K 8X Vir;w King Power Equipmeot Op_e,ators Truck Crane Oiter/driver- $68.55 7A 3K 8X View 100 Tons And Over King Power1 rlrupni n{{]px�ratPr4 Truck Crane Oiler/Driver $68.02 7A 3K 8X View Under 100 Tons King 1'awer E ui n etrt Operators ITruck Mount Portable $68.55 7A A 8X View Conveyor King Power EouiMent_ODerators I Welder $69.16 7A 3K ,L View King P2M Eq_u,ipment tinerators jWheet Tractors,Farman $65.051 7A 3K 8X View TVpe Kin -:-Equipment_0 erators Yo Yo Pay Dozer $68.55 7A 3K 8X View Kinn 7uwk a �QutgmenE Ooermor5- Asohalt Plant Operators 569.16 7A 3K 8X i View tlnrler rQ nd Sewer ii Water King Power Ei3ujpMe t t3�acors- Assistant Engineer $65.05 7A 3K 8X View Underground fewer ii water King Paver € t, rent C7�erators Barrier Machine(zipper) $68.55 7A 3K 8X View under_ round_Smwer i W King P—"er Eciuipmcnt OperatorT- Batch Plant Operator, $68.55 7A 3K BX View Underground Sewer&Water Concrete p King Rat A r Etlraigm t perarofs• Bobcat $65.051 A 3K SX ' View Unrler ourcd Sewer &Watw King tori- Brokk-Remote Demolition $65.05 7A 3K 8X View dnderground Sewer&Water Equipment King P—er l-rtritnmr*r7t r11tv*rtrrtir; Rronms 569.05 7A 3K AX View Under r4 ound Sewer&Water King Pater Ec ui l2ment Operators- Bump Cutter $68.55 7A L 8X View qn derr.u L,pA_S"itr_Et Wgter i King Prower Eqiipmerst OtWrators Cableways $69.16 7A 3K 8X View Unrierorn ind Sewer R Water Und - King li vr!jr Equi rnerit_f} raror5 Chipper $68.55 7A 3K 8X -View llndergraunrz Sewer y water j. King r�werEqurDna.rtE Operators iCompressor $65.05 7A 3K 8X View Underground Sewer&Water King Power E u pment(]peratrarsF Concrete Finish Machine $65.05 7A 3K 8X View undereround Sower.8 water Laser Screed King Power Equ�Jpmenr Operators_ .Concrete Pump-Mounted Or $68.02 7A 3K 8X View Under_qrot Sewer F.Water• iTrailer High Pressure Line 1 mp, Pump High Pressure fang Pvwacr E4utiument Operatct Concrete Pump:Truck Mount I $69.16 7A 3K 8X View lJn�tprr rnut�r*5r rrrr F, waror With Boom Attachment Over 42 M . King ProweregUr}ar+het t!J3xer�Gu�5 Concrete Pump:Truck Mount $68.55 7A 3K 8X View Underground Sewer E Watttt ,With Boom Attachment Up (To 42m King Power Equipmem Operators- Conveyors $68.02 7A 3K 8X View UnderjUt iid Sewei .h 'Water King $71.25 7A 3K 8X• View hupx;;/fortress,wa.gov;ni!wagclookup/prviVagcloukup..upx 8/28/2019 P4ge 13 of 19 Power Eguiprnent Operators- Cranes friction:200 tons and Urrderstroonrl}ewer a'Nater, over _ __.. King Power Euuiprneizt opere[ rs Cranes: 100 tons through 199 $69.85 7A 3K 8X View lindergraund Sewer fi Wa[c�rtons, or 150' of boom (including jib with ,attachments) King Power Equ?l?ment Operators Cranes: 20 Tons Through 44 $68.55 7A 3K 8X View Underground Sewer&water ITons With Attachments King Rower E, tpaent Qperator3: Cranes: 200 tons-299 tons, $70.57 7A 3K 8X View Underground SewE Nar.,r or 250' of boom including jib with attachments King Rower EgU;gment Operators Cranes: 300 tons and over or $71.26 7A 3K 8X View Underground 5ewwr E�._w_ater 1300'of boom including jib with attachments King Pawer Egt�rA�en. ti�xr at.^,r; Cranes:45 Tons Through 99 $69.16 7A 3K 8X View tlndergrgtrnd5ewer& Y_s'at r Tons, Under 15U Of Boom (including Jib With Attachments) King Pawer EG uipgntq©perators- Cranes:A-frame- 10 Tons $65.05 7A 3K 8X View Underground_iewer ft water And Under King Pawergugrnent Operatrars�• Cranes: Friction cranes $70.57 7A 3K 8X View Under round Sewer Et Water through 199 tons King Fower Egwpmen[OWa tors- Cranes:through 19 tons with $68.02 7A 3K 8X View UndergrogRg Sewer&yt+at r attachments,A-frame over 10 tons King Power err�Irg4idW.at rs- Crusher — — $68.55, 7A 3K 8X View Sewer King Power_Euipment.p�rators- Deck Engineer/Deck Winches $68.55 7A 3K 8X 1 View Underground Sewer 8 Water (power) King RowerEguiemerit Operators• Derricks,On Building Work $69.16 7A 3K 8X i View Undee rokund Sewer Et water .L King Power Equipment Operators- Dozers D-9 Et Under $68.02 7A 3K 4 8X ' View 4nftrqLouqd Sewer&Water f King Power Eguiprnent 0 rat ari- Drill Oilers:Auger Type, $68.02 7A 3K 8X View Underground Sewer E;water Truck Or Crane Mount King Pow_er --guipment Orer_:i,mr•,. Drilling Machine $69.85 7A 3K 8X View Underground Sewer€t water King Power Equipment.Opgta,ttlr Elevator And Man-lift: $65.05 7A 3K 8X View UnderRrouiid Sewer Ix water Permanent And Shaft Type King PerEqui er L 0 ,r it..r_w Finishing Machine, Bidwell $68.55 7A 3K 8X View Urawndergrour�+ yrYr a N-[ar And Gamaco ft Similar Equipment King Pawer E ui,merit O gators Forklift: 3000 Lbs And Over $68.02 7A 3K 8X View ...�__.9.._P. _ice._ Underground Sewer ft_Water With Attachments King P_gwy `Equip"tt Operators-• Forklifts: Under 3000 Lbs. $65.05 7A 3K 8X View itndgrgro_urni Sewer Et'Mater With Attachments King Pawer E_qulprnrn[O eratars: Grade Engineer: Using Blue $68.55 7A LK 8X View 11nderground Sewer Ft Watel, Prints, Cut Sheets, Etc KingPowerrvEcLu!prniLtt_�cra[ars• Gradechecker/Stakeman $65.05 7A 3K 8X View Underground Sevier Et Water King Power Egppni!nt Ooefatm., Guardrail Punch $68.55 7A 3K 8X View Under_gti and Sewer Er water https://fortress.wa.govtlni/.wagelookup/pry Wagclookup.aspx W812019 Page 14 of 19 King P!rvurrr =,ILtpm�nc Q)te,jatr r. Hard Tail End Dump $69.16 7A 3K 8X View Urrcder�r•�rind Sewr r Et Water Artic.Watrng Off-Road Equipment 45 Yards. Ft Over King 0p-;%rru%• Hard Tail End Dump $68.55 7A 3K 8X View UnderImpri i.'i,ewpr&Water Articulating Off-road Equipment Under 45 Yards King Power Eesutpme?r,t_Operators- I Horizontal/Directional Drill $68.02 7A 3K 8X View Underground Sewer& tl'3ter ILocator King Power€ ui went Operators- Horizontal/Directional Drill $68.55 7A 3K 8X View UnderQraund Sewer 5,;_—Water ioperator King Hydralifts/Boom Trucks Over $68.02 7A 3K7 View Underground_5 er fx Water 10 Tons King ?rawei E u rent 00 Utrsrs Hydralifts/Boom Trucks, 10 $65.05 7A 3K 8X View �nderground,Sewer&Water Tons And Under King Mayer tquipn,,�nc gators 'Loader, Overhead 8-cards. & $69.85 7A 3K 8A view oder rorrrrd Se+n of&Water Over -- h....�L..�./ x V 1.. fLn 1C TA 71! OV f\1111Y-, _�L+re o��i�,y u�n� _•ii_i LUQUCI, V VGI IICQV I V I a1 V]. �V 1.IV /n �f♦ �1 � nt Underground_Sewer£x Water But Not Including 8 Yards King Powgrzc}urvgment Operators Loaders, Overhead Under 6 $68.55 7A 3K 8X View lnderereund Seer ft Water Yards King pnw?r E_+ai ,nwr+t neratr+rs Loaders, Plant Feed $68:55 7A K 8X View Under iii uuiid Sewer ft Water King Power coutpment(3oerators Loaders: Elevating Type Belt $68.02 7A 3K 8X View Underground Sewer Ft Water King Power Gqujpment f] racars_ Locomotives,All $68.55 7A K 8X View Underground Sewer&Water King Powmr Equtprggn' _Qperayors_ iMaterial.Transfer Device $68.55 7A 3K 8X View Underground Sewer&Water King power Equ!pment 0 errat_ars- Mechanics, All(leadmen • $69.85 7A 3K $X View Unde(q_(q.rnd Sewer ft Water $0.50 Per Hour Over Mechanic) King power EyqPinerit Operators Motor Patrol Graders $69.16, 7A 3K 8X View Unde%s ound Sewer&'Nater King l3ower_Equ}pmrr,t.-0{xralurs Mucking Machine, Mole, $69.16 7A 3K 8X View U__nde_rground Sewer a_Water Tunnel Drill, Boring, Road Header And/or Shield King Power cgutp t eperat,rs Oil Distributors, Blower $65.05 7A 3K 8X_ View UaId_ergr,�uru!ewer Et'Na_zo. Distribution Ft Mulch Seeding 10perator King Power Equi_pIT ent_0perators• Outside Hoists (Elevators And $68.02 7A 3K BX View Underground Sewer&Water Manlifts), Air Tuggers, Strato King ?>•+er EgGnprner,t [ ,erat_nrs Overhead, Bridge Type $68.55 7A 3K 8X View 4inJer a uriix}5.awer ft wltri Crane: 20 Tans Through 44 i ITons King Power %uipment_Overarors ;Overhead, Bridge Type: 100 $69.85 7A 3K 8X View ilndergrnund Sewer Ft Water I Tons And Over King �Lueirr�qulprrre:t 0ge a ars !Overhead, Bridge Type:45 $69.16 lA 3K BX .I View Underground Sewer Ft Water (Tons Through 99 Tons King Prower-Egrripmelit U;ver,ttFs- Pavement Breaker $65.05 7A 3K 8X View Ungwq round$ewer f;Water King Prower +�iixneat rit Operors Pile Driver(other Than Crane $68.55 7A 3K 8X View kt7 Under round Sewer&Water Mount) AtpsWI'orlress.wa.gov!Int/wagelookup/prvWagelookup.aspx 8/2912019 Page 15 of 19 King P()-er—qLnomeet Ovef"Itors. (Plant Oiler-Asphalt, Crusher $68.02 7A 3K $X View - 1i;ndefvlcnd Sewer Et I King $65.05 7A 3K 8X' View Lr ]Porthole Digger,Mechanical Underground Sewer Et Water I King Power Fqwpment Coerators- Power Plant $65.05 7A 3K BX View King PowerEgvtj) jmwt Qp rators- Pumps-Water A K BX View �L_ $65,05� L L Underground Sewer Et Water King Power jqyiLxneijeOperators Quad 9, Hd 41,D10 And Over $69.16 7A 3K 8X View Underground Sewer Et water King Power Equipment , _ perators. Quick Tower-No Cab, Under $65.05 7A 3K8X View Underground Sewer EL Water 1100 Feet In Height Based To i Boom King Remote Control Operator On $69.16 7A 3K 8X View q!Lqeground Sewer Ft Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger and Bettman $65.05 7A 3K ax Under gsound iSewer F±water. King PgwLer,g us ent O stars Rigger/Signal Person, $68.02 7A 3K 8X View Underground Sewer Et Water Beltman (Certified) King Power Equipment Operators-, Roltagon $69.16 7A 3K BX View Uq_der round Sewer k Water I King Power Equipment OMators- Roller, Other Than Plant Mix $65.05 7A 3K SX View Underground Sewer Et Water King Power EquiQgLent Ojtt[acofs- Roller, Plant Mix Or Multi-lift $68.021 ZA IK 8X View Underground-5-twer-EWater Materials—k _ King Power Eauioment ODerators Roto-mitt, Roto-grinder $68.55 7A 3K 8X View �Ln -i�ma r !jtqjLWnd Sewer&Water King P wer Eqyipmtnt_Ogeraqn- Saws-Concrete $68.02 7A 3K 8X View Underground Sewer 8t Water I King RqvKer Equi9r9gq Qp.er!ktors- Scraper, Self Propelled $68.55 7A 3K 8X View Uvj(!erqrqqrrd Sewer is Water Under 45 Yards King rower Eqqi_prrivtp4!pK� Operator; Scrapers-Concrete Ft Carry $68.01 7A 3K 8X View Umy._ground, ie_ All Sewer ft Water King P_qvt4tr E_qujp V Scrapers,Self-propelled:45 $69.16 7A 3K 8X iew Underground Sewer&Water Yards And Over King qjpLOperators- Service Engineers $68.02 7A 3K 8X View qn4trpound Sewer EL Wger Equipment King Power Eouioment%wrators Shotcrete/G unite Equipment $65.051 7A 3K 8X View Undgrg,[ound Sewer Ft Water King Po-eF_E_qtpM";ppe�gqr�- Shave[, Excavator, Backhoe, $68.021 LA 3K 8X View I , I . — — Under round Sewer Water Tractors Under 15 Metric Tons King Power Equipme $69.16 7A 3K 8X View Shovel, Excavator, Backhoe: Underground Sewer F1 water Over 30 Metric Tons To 50 Metric Tons King Rower Equnj �QpLjtors ShovelExcavator, Backhoes $68.55 7A 3K RX View jp ene , ,__ _ — — — Undeiground Sewer Water Tractors-, 15 To 30 Metric Tons King Pq�tr Ecluiprnent 0 rqkq[s, Shovel, Excavator, Backhoes: $69.85 7A jK L X View 1Jrt;it'�ground Sewer F1 Water Over 50 Metric Tons To 90 Metric Tons hitp,.i://I'(irtre5s,wLi.gay/Ini/wagelookup/pryWagelookup.aspx 8/29/2019 Page 16 of 19 King slower `quipnnent f3p_erarqrs• Shovet, Excavator, Backhoes: $70 57 7A3K SX View Us�ct -vaund Sewer d'Nater Over 90 Metric Tons King ?pr+er �qurpment Q pecators. Stipform Pavers $69.16 7A 3K 8X View Underground Sever F-t Water King r gN?e_f Ec wpyNjjc Qpc star, Spreader,Topsider 8 $69.16 7A 3K 8X View Underground Sewer Ex water Screedman King ?oar Eg;u:i,":= 5ubgrader Trimmer $68.55 7A 3K 8X View lJndearournd Sewer ft Water King Power Equipment Operators_ Tower Bucket Elevators $68.02 7A 3K 8X View Undergfound Sewer&water King Pwrr, c7ta:pcnenc uperatnrs_ Tower Crane Up To 175' In $69.85 7A 3K 8X View Upidergr4ijnd k-Werjj WaterHeight Base To Boom King Power Equipment O0rators•_. 'Tower Crane:over 175' $70.57 7A 3K 8( View order- ound Sewer E Water. through 250'in height,base Ito boom King Powcr EquiDmcrrt Operator; Tower Cranes:over 250'in $71.26 A 3K §X View UI11/rl Ull!111�)1y. olI U YYll4.1 I1ICIIISI IL I I UI 11 UQ]r 111 UUUI11 King Power Eguiustent Operators- Transporters, All Track Or $69.16 7A 3K SX View t3ndeMrnund Sewer ft Water Truck Type King Prower c ur ITee13L Ow--raters- Trenching Machines $68.02 7A 3K as"X View Under r f�nd A-W-Ater King Power EQuigm_ t Onpfatars- Truck Crane Oiter/driver- $68.55 7A 3K 8X View Under round Sewer&Water 100 Tons And Over King Puwer E u¢ pillem ueraturs Truck Crane Oiler/Driver $68.02 7A 3K 8X View Underground Sewgr It Water Under 100 Tons King Power�qulpm rpt gp.!? atprs- Truck Mount Portable $68.55 7A 3K 8X View Undf--L ound Sewer ft water Conveyor King Power Equipment 0 atgrs= Welder $69.16 7A 3K 8X View Underground Sewer&Water King Paver �i artent_Operatugs•. Wheel Tractors, Farman $65.05 a 8K 8X View Underground Sewer Et Water Type King Prower:wnTitpnent 0 erators• Yo Yo Pay Dozer $68.55 A 3K 8X View Underground We&Water King Power Line Clearance Tree Journey Level In Charge $50.96 5A 4A View Trimmers King Power Line Clearance Tree Spray Person $48.35 5A 4A View Trimmers King Power Line Clearance Tree Tree Equipment Operator $50.96 5A 4A View Trimmers King Power Line Clear once Tree Tree Ti immer $45.54 5A 4A View Trimmers _ King Power Line Clearanre Tree Tree Trimmer Groundperson $34.51 5A 4A View Trimmers King Retrgeration.ix-Ail Journey Level i $82.51 U View Conditioning Mechanics King Residential BrjfK Mason Journey Level $58.82 1 yiny King Residential Ca-oenters Journey Level $32.06 1 i view _ _-_ _ King Residendal_�ernej7 Masons Journey Level $29.25 1 vm'*w King ltesrtien :a►l7rw:all Journey Level $46.43 7A 4C View appllcafors King ,Residential Divwall Tapers Journey Level $47.17 5P 1E hUps;rll ortress.wa,govll ni:u ageknl kupi pre W ageioukup,aspx 82312019 Page 17 of 19 if ng Neiidentr.tt Elec:tricwn, (Journey Level $36.01 0 L—LLew Kill ��Residential Glaziers (Journey Level $44.151 7L 1H View _ l`"; King rResidentat Insulaidon Journey Level $29.87 1 View Applicators King Residential Laborers (Journey Level $26.18 1 View 91 ng Residential Marble Setters {Journey Level $27.38 1 View Ring Residential Painters Journey Level $27.80 1 :hew King Res`,den�.W PWrnbers a jJourney Level $39.43 1 View r5 t'ritwi'r5 T King feLmdenrra-Rerrir,--:[ir:n -1 Journey Level $54.12 5A 1G View King Worker sidential Sheet Metal Journey Level(Field or Shop) $51.89 7F 1 R View King Residential Soft Floor i.4y:r; Journey Level $51.07 5A � j Vievr King iat Spi ii kltyr :tt _r Journey Level $48.18 5C 2R View Fire F Otet en ir — King Residential Stone Masons Journey Level $58.821 5A iffi- View King Residential Terrazzo Workers Journey Level $54.061 5A 1M View King Residential Terrazzo/Tile Journey Level $24.39 1 View Finishers King :Residential Tile Setters Journey Level $21.04 i E View King Roofers Journey Level $53.27 5A 3H View King Roofers Using Irritable Bituminous $56.27 5A 3H View _ Materials i King Sheet Metal Workers Journey Level(Field or Shop) $85.88 7F 1E Vic^v King 5n-10ultkip R,!palr New Construction $36.36 7V 1 View Boilermaker King shipI:urtding fx_Ship Rep=>t New Construction Carpenter $36.36 7V 1 View King 5t .auitding_s ih.p R4poir New Construction Crane $36.36 7V 1 View [ Operator ging ShIpbr.riHinR_Fx_5hr R yair N!w Construction Electrician $36.36 7V 1 V_19v King Iuittg+Sh,p Repaid INew Construction Heat ft $76.61 5J 4H View Frost Insulator k;ntJ Shipbuilding ft_Shi _ epair New Construction Laborer $3636 7V 1 View Ktnrg $h i tl_I:!r r z si 'Stq)Reo.�1+ 'New Construction Machinist $36.36 7V 1 Vi King Si 1pbt,Id,r c �l yh^G R'�hay New Construction Operating $36.36 7V 1 View Engineer ShinL,ul.dmg E ah..F repair New Construction Painter $36.36] 7V 1 View Kirin 5l7ippui?clans Ee 5ii Rei lir New Construction Pipefitter $36.36 7V 1 View Kmg 15hiPbuilding Et �p Repair INew Construction Rigger $36.36! 7V 1 View King rnaul7a.,lti,lrk d 'iitrilb!pa r New Construction Sheet $36.36 7V 1 View 1MetaL KingShi lauslrliii� a Si 1p Rr�oic New Construction Shipfitter $36.36 7V 1 Viea, _ — — — King 'yhi,rr : i, ,Y +t o aotm r New Construction $36.36 7V 1 View Warehouse/Teamster King i!7ipbuilding ` �>oq; 3 pal. New Construction Welder! $36.36 7V 1 j View Burner King 1hfpt9ullclif,q Er Siilp Rt�pau Ship Repair Boilermaker $46.15 7X 4J 1 Vie,v, haps:/llarlress,µa.gov.il iitvagetotikuprprvWagcloukup.aspr 8/28i2014 Page IB of 19 King Ki Shmauitdin Snipep r,r Ship Repair Carpenter $44.45 Lx "1J Vir;w King Ship Repair Crane Operator $45.06 7Y 4K f VVeew King 5h}pb, }t ir,q It 5.01p ALqpwr Ship Repair Electrician $46.15 7X Yalu King iuiU-na_a 5hip_Repjjsr Ship Repair Heat ft Frost $76.61 5J 4H View Insulator King Shipbuilding Et Shy Repair Ship Repair Laborer $46.15 7X 4J View - - - - King Shipbuildin _(i Ship R�ir rShip p Repair Machinist _ i $4b.15 7X 4J View King Shipbuilding Et Llji Re air Repair Operating $45.06 7Y 4K View Engineer King Shi buildin &5.i Re it Ship Repair Painter $46.15 7X 4J Vfotw _ _ �,._. King Silipkui(ding Et Ship gUair Ship Repair Pipefitter $46.15 7X 4J View King ShiQbuildina Ft Ship Repair Ship Repair Rigger $46.15 a View King Shipbyu li-nq-u 5htp_Rc air .5hip Repair Sheet Metal 546.15 7X 4J View King Shipoultd7ne a Sh,p Repair Ship Repair Shipwright $44.95 7X 4J view King Shiphuildinq 4phip Repair Ship Repair Warehouse / $45.061 7Y 4K View Teamster King Sign Makers �t Installers Journey Level $50.90 0 1 View lElectricaJ King Sian Makers a ',r st,i1: :~, Journey Level $31.52 0 1 View (Von-Electric..;x I King Soft Floor Layers Journey Level $51.07 5A 3.1 View King Solar Controls For Windows Journey Level $12.441 View King 5 r�,inkler FitC rs.[Fir: Journey Level $81.39 5C 1X View Protection) King St, e RiggingM,�chani;.;,Nan(Journey Level $13.23 1 View Str,act-Ur at) King 5tone Masons Journey Level $58,62 5A 1M Y King Street Anr1_Parking Lnt Journey Level $19.09 1 View 53ngepe'r Workers I King Surveyors Assistant Construction Site $62.71 7A 3K 8X View Surveyor King Surveyors Assistant Construction Site $62.71 7A 3K BX View Surveyor KingSurve�o_rs Chainman $58.93 7A JP King lsurveyara Construction Site Surveyor 563.76 ZA K 'EX View King Telecommunication Journey Level $51.07 7E 1E View Technicians King rrtr�+�_ut�r, iIt-CQJtNIIULGOI CdbtL-Split.er $41.81 3A 2B View Outside King rogie ihnne t-� Congrurnoo Hole Oigger/Ground Person $23.53 5A 2B View Outside King Telephone Line Construction Installer(Repairer) $40.09 5A 2B View Outside King ieltwrg Line Cs.lriJc.ttP j5pecial Aparatus installer I�, $41,61 view Oi:tsid+? I J King Tjtt_i qA ttr !,ij te C_:?nsi uetioo Special Apparatus Installer ll 540.99 5A 2B View -Outside King CDnstrtx;tion Telephone Equipment $41.81 `LA 2B `View -Outside 10perator{Heavy) hitps:Aortress.wa goy"IniiwagelookupiprvWagelookup.aspX 8128i2-019 Page 19 of 19 King reieQ_htnc Line Const ur twirl Telephone Equipment $38.92'( 5A 26 View ---- rr t::scie Operator lL �r+s s King r?Ic r onto Line Cinsr [.ren Telephone Lineperson $38.92 5A 2B View Outside King Telephone Une Construction Television Groundperson $22.32,; 5A 2B View _ Outside j King 3'elei;iirar+N Line Construction Television $29.60! 5A 2B View - Outside Lineperson/Installer i King TPleialu+ne L 0 La r,structuai Television System Technician $35.20 5A 2B View Outside King rete L nrr Cortsrr c_tion Television Technician $31.67 5A 2B View Outside 1 King i elep.(one Li+1.e;:ransrrra tpn -Tree Trimmer i $38.92 5A 2B View - Outside King Terrazzo Workers !Journey Level ]� $54.06 5A 1M View King Tile Setters lJourney Level $54.06 5A 1M View King TIti4arbie it Terrazzo IFinisher - $44.89 5A 1BI View 1 Finishers j King T;"Wic Cua qo� Scnp rr: Journey Level $47.681 7A 1K View King jTruck Drivers ;Asphalt Mix Over 16 Yards $61.591 5D 4Y 8L view King (Truck Driveri Asphalt Mix Over 16 Yards $61.59 5D 4Y 8L View fW. WA-Joint Council 28) King Truck Drivers iAsphalt Mix Over 16 Yards $60.75 5D 4Y SL View (W.WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards $60.75 �D 4Y 8L View King Truck Drivers Asphalt Mix To 16 Yards(W. $60.75 5D 4Y SL View iWA-Joint Council 28) King, Truck Drivers Dump Truck $60.75I 5D r _ 4Y 8L View x ng Truck Drivers !Dump Truck ft Trailer $61.59, 5D 4Y 8L View King Truck Drivers' Dump Truck ft Trailer $60.751 5D 4Y 8L _View King Truck Drivers ;Dump Truck(W.WA-Joint $60.75 5D 4Y 8L View CounciL 28) King Truck Drivers Other Trucks $61.59 �D 4Y 8L View King Truck Drivers Other Trucks(W.WA-Joint $61.591 5D 4Y 8L View (Council 28) King Truck Drivers Other Trucks(W.WA Joint $60.75 5D 4Y 8L View ;Council 28) King Truck Deuces R^rirr:y 4?rx Dump Trucks,side end and $60.75 5D 4Y 8L View bottom dump, including ,semi-trucks and trains or combinations thereof: Less ithan 16 yd. capacity King Truck-Drivers-_Ready Mix ITransit Mix $61.59 5D 4Y AL Vi King wets Drrii-ert c Ir'r;iaztow Irrigation Pump Installer $17.71 1 View �Ir'.3U It`.'tdlE f5 - King '+veli-Drill+yrs h.1r:iq;-rtrx Oiler $12.97 1 View Rum„Instillers King we it Dr,-lk,rt� it r;;oiiigo_ Well Driller $18.00 1 View PI.Imp Instisl:ce!s h(tlis:'/fortress.wa.gov/Ini/wagelookup/prvW3gClookup.aspx 8/28/'_019 GREEN GABLES NTS PROJECT City of Federal Way 33325-Eighth Avenue South Federal Way, WA 98003 Prepared By: CITY OF FEDERAL WAY, WASHINGTON r r APPENDIX A SPECIAL PROVISIONS DIVISION 8 MISCELLANEOUS CONSTRUCTION 8-32 ASPIi_ALT GDNCRETE SPEE©f{UMP New Section 8-32.1 Destriptioss The work shall consist of constnicting asphalt concrete speed humps with associated Pavement,truing per City of Federal Way Detail r)WC'.Nn 3-24 8-32.2 Materials Asphalt concrete for speed humps shall be HMA Class %z" PG 64-22 meeting the requirements of Section 5-04 of the Standard Specifications. S-,32.3 Omstruction Requirements The various materials shall be installed as noted on the plan detail. 8-32.4 Measurement Measurement will be per each where a speed hump and associated pavement markings are installed. 5-32.5 f aynied "Speed IIump,Complete",per each. The unit bid price per each proposal will be full compensation for the cost of all tools,labor, equipment, and materials necessary or incidental to provide and install the asphalt concrete speed hump. d APPENDIX"B" PROJECT LOCATION MAP AND STANDARD DETAILS, City of Federal Way 33325 Eighth Avenue South Federal Way, WA 98003 Prepared By: CITY OF FEDERAL WAY, WASHINGTON a f. F r r r,r IMP- IV 410 3J ` C :ti s I f f ti F MO 1r YIIMr + a y >'Rom..r n-ua.«. I` ____.,,_�...\...\._{�p_._+Iso•;TTP)--_-iI� By athars By Othem 11,K S'+CLLDIf-ON SME IS f"P 4 V"M=Li'HtEI11,;NC(TP' r RIM4 ftv:m dr "PER Tyw SIRO PW1 w.,a(npckl jl} Ali i By Others ..-r-,r�....t"•r r'`�P~vv-.�^•�r�,"``e-'*e-',c",r�r"r�r,•--�"^.'",�`r+ sn.A uE.•r r -it wB-1 'I BI:MP .b 1 .111' .)7r w6-!A SUMP AWfAO 1 DO' wIU-1 15 4. E1AIR ^..t IB••t6' Y NOTES 1}ADVANCE SIGNS USED ONLY FOR ARST N SERIES Z)ARIEN 2 DR MORE BUMPS,REPLACE Wtl-IA WITH YN-14(5)4BU1w5 AHEAD) •moi .. n � '. - 1• r r SECTION A-A - PARABOUC CROWN I FOOT OWE,R'DEPTH ASPH4Li Cftmo.TP BOTH ENOS(SEE NOTE 11 OTANOMO CIA±D D OR I s• Rl C►SC C YUI(TTP) 6• �• �TAPE � CUTER t—•AcK CDM(rip) SN6:L.lER SECTRTN M-B(CURB AND GUTtR) SA:NON 1}9(SWXILOER) MOIL I)PRIOR TO SPEED HUMP CONSTRUCOON THE ENGINEEA MAY RECUIRE ASPHALT GRINDING N ORDER?O PROVIOE A SMOOTH TRANSITN7N iwr �' PwuoamumcSPEED HUMP T3-26