Loading...
12-103033 • Suilding - Mufti Ffimily City of Federal Di Way Permit 12-103033-00-MF Community&Econ.Dev.Services #: 33325 8th Ave S Federal Way,WA 98003F EInspection Request Line: Ph:(253)835-2607 Fax:(253)835-26091 P eq (253)835-3050 Project Name: TRELLIS APARTMENTS BLDG 10 •Project Address: 2426 SW 352ND ST Parcel Number: 176150 0200 Project Description: REP-Removing composition roofing and installing new composition roofing. Owner Applicant Contractor Lender, WHISPERING HILLS OF BIRD 3-D ROOF SYSTEMS LLC 3-D ROOF SYSTEMS LLC 2677 WILLAKENZIE RD#3 PO BOX 330 3DROOSL982CJ(2/11/14) EUGENE OR LYNNWOOD WA 98046-0330 PO BOX 330 97401-4873 LYNNWOOD WA 98046-0330 Census Category: 555-Non-structural roofing permits Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load Floor Area(sq.ft.) 0 0 0 0 Additional Permit Information Mechanical to be Included? No Number of Stories 2 Permit for Building Shell Only? No Plumbing to be Included? No New/Additional Sq.Feet-Total 0 No Fixtures Associated With This Permit Il CONDITIONS: Subject to field inspection without plans. PERMIT EXPIRES Saturday, December 29, 2012 Permit Issued on Monday, July 2, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use wil ccordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: 2 I Z PNAO. i /eo/,t' ` • THIS CARD IS TO MAIN ON-SITE cm,OF ''~ Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 12-103033-00-MF Address: 2426 SW 352ND ST Project: FEDERAL WAY, WA 98023-3189 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) 0 Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By Date .El Foundation Wall(4115) 0 Drainage/Downspout(4040) El Re-steel(4215) Approved to place concrete Approved to backfill Approved to place concrete or grout By Date By Date By Date 0 Slab/Concrete Floor(4255) 0 Underfloor Framing(4285) ' 0 Floor Sheathing(4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date ' e0 Shear Walls(4245) 0 Roof Sheathing(4220) 0 Fire/Draft Stops(4095) Approved to install siding Approved to install roofing Approved .By Date By /j Date 7 .._/2._ By Date I 0 Interim Erosion Control(4370) Prior to scheduling a Framing inspection; , 0 Framing(4120) ' Approved Electrical,Plumbing&Mechanical Rough-in and Approved to insulate Fire/Draft Stop inspections must be signed-off and By Date approved. IBC 1093.4 By Date o Insulation(4150) Gypsum Wallboard Nailing(4130)' Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud&tape Approved to drop tile By Date By Date By Date • ❑ Final-Fire Department(4060) ' '0 Final Erosion Control(4375) ❑ Final-Building(4050) Approved Approved Approved By Date By Date By fc Date 7z),/Z 0 Rough ElectricalEl Final Electrical Right of Way Approved Approved Approved By Date By Date By Date