Loading...
11-102138 • Mechanical City of Federal Way fla • ' Community Development Services Permit #: 11-102138-00-ME P.O.Box 9718 Federal-260, F 98063-9718 Inspection Re Request Line: (253)835-3050 Ph:(253)835-2607 Fax (2253)835-2609 q Project Name: SHAFFER Project Address: 1073 SW 326TH ST Parcel Number: 926494 0460 Project Description: Replace gas furnace,heat pump and hot water tank Owner Applicant Contractor TIMOTHY&WENDY SHAFFER DAVE TREAT AUBURN SHEET METAL INC(MECH) WENDY SHAFFER AUBURN SHEET METAL INC AUBURI*222RQ(4/30/11) 1073 SW 326TH ST 844 S MT.VILLA DR PO BOX 1354 FEDERAL WAY WA ENUMCLAW WA 98022 ENUMCLAW WA 98022 98023 x _ iid4FEi„,n,.. . " »3`«" Ai, .•u."., :,r: > Mechanical Valuation 11715 Is this an Online or O.T.C.application? Yes ,�,, •z�..���v:�:. '�'a:• �h,rr aw .� �.} . ...{;>__ • ., �:, s'��F .♦ "r.�i Fvai�r'.+M'�r,. ��^•' <f.k..F' a., '»; •'�$ „C ,,, r•• 'Mec�a �. 4�ri �•i�.`i ' - ' s `,�i`!c � `•''' `az' vC> .': • .. ter" xtla•a�:1 . :• 't s a' :°Cr t f Compressors/Heat Pumps 1 Furnaces 1 Hot Water Tanks 1 PERMIT EXPIRES Sunday, November 27, 2011 Permit Issued on Tuesday, May 31, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the se will be in accordance with the laws,-rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 44 12— Date: 5-31 -If FINALED G'I'e4fU THIS-CARD IS T MAIN ON-SITE 440 CITY OF • Construction I ection Record Federal Way INSPECTION REQ TS: (253)835-3050 PERMIT#: 11-102138-00-ME Address: 1073 SW 326TH ST Project: TIMOTHY &WENDY SHAFFER FEDERAL WAY, WA 98023-4908 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in (4165) CI Gas Piping(4125) Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date •B, Date • ‘ . Fit IP • Rough ElectricalEl Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date