11-104063 l\Iec'hanical
City of Federal Way • r W
Community Development Services Permit #: 11 -104063-00-ME
P.O.Box 9718
Federal Way,WA 98063-9718 Inspection Request Line:
Ph"(253)835-2607 Fax (253)835-2609 p Q (253)835-3050
Project Name: HAPP 0-r;1)-
Project
$71)-
Project Address: 2721 SW 327TH ST Parcel Number: 894520 0040
Project Description: Replace gas furnace and hot water tank.
Owner Applicant Contractor
KARL H HAPP JIM LE AIR NORTHWEST CLIMATE CONTROLS INC
PO BOX 23624 NORTHWEST CLIMATE CONTROLS INC NORTHCC990P4 (12/22/11)
FEDERAL WAY WA 98093 101 23RD ST SE SUITE B-2 101 23RD ST SE SUITE B-2
PUYALLUP WA 98372 PUYALLUP WA 98372
•
N,...r M "y ...,z .>. ;s•• ya.,,� 7. "'r>an, r •,F <ar •». ;s .» •`,M+:, en
•'"�k arws t"n�,.i i�s?�n �" ;s..p.. rwr� • ,♦
M�, z'iwryt'• :. ..�..::, , ,#=•%, '.i�+" . ,�iY a".�h'�`rp«�'««,. l§
Mechanical Valuation 2200 Is this an Online or O.T.C.application Yes
r;.: *"' ,<i. ?"._ ..tY;1. ., .Z:i7+*** .. ;,� ;n dKSFx�'w.,. n+.p«.+ .�
♦ s,F� .y^•,yc �:.,:r;.. :«."�«t s a` 3�.1.f`,� e : .pK .^�,^,"„yw,m,."";:.'"°" .s 3�r�
�:,.��"�,!�f`k 3" ....�:�.... � vim#x+�>�3-��":..a;«.,�:.b�o. i.raS.:'i�+•en.��•'.� .µ.<. :!e»x M „��S /F:�.�t�.d«g�!Ns? ,Wk, Z' '
Furnaces 1
PERMIT EXPIRES Saturday, April 7, 2012
Permit Issued on Monday, October 10, 2011
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
Owner or agent: tIE. Date:
PTNAUR jo/ti //I
THIS CARD IS TO MAIN ON-SITE
CITY OFiiip&ht: ' Construction In ection Record
Federal Way INSPECTION REQUE TS: (253) 835-3050
PERMIT#: 11-104063-00-ME Address: 2721 SW 327TH ST
Project: KARL H HAPP FEDERAL WAY, WA 98023-2536
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in (4165) ❑ Gas Piping(4125) El Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By /..?/C Date /Q//V/
FILE
El Rough ElectricalID Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date