11-101121 ' a
' •
Mechanical
City of Federal Way •
11-101121-00-ME
#:
Community Development Services Permit
P.O.Box 9718
Federal Way,WA 98063-9718
Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (2
53)835-3050
Project Name: STANDFILL
Project Address: 2661 SW 330TH ST Parcel Number: 894520 0980
Project Description: Replace gas 50 gallon hot water heater
Owner Applicant Contractor
L E STANDFILL WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO
2661 S 330TH PL NORTHWEST PERMIT/WESCO (GENERAL)
FEDERAL WAY WA 98023-2829 1345 W GULF RD WASHIES971OB(9/2/11)
POINT ROBERTS WA 98281 2800 THORNDYKE AVE W
SEATTLE WA 98199
•
Mechanical Valuation 950 Is this an Online or O.T.C.application? Yes
'4111111111130
« `' yt3{ :: •M 1F biiiV- j4.. •
. '• •vt• . .:..y?f 4'`.��. ^•
.c wt^ 6
Hot Water Tanks 1
PERMIT EXPIRES Tuesday, September 20, 2011
Permit Issued on Thursday, March 24, 2011
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way. f I
Owner or agent: Date: j'2'_4 (!
- �
3/5 CAI
' THIS' M
CARD IST AIN ON-SITE 4
Cm OF Construction I ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 11-101121-00-ME Address: 2661 SW 330TH ST
Project: L E STANDFILL FEDERAL WAY, WA 98023-2829
Scheduled inspections may be failed if this card is not on-site. PO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By Date
C �. —'31,—A)
❑ Rough ElectricalEl Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date