Loading...
11-103097 I 1 r ., ' City of Federal Way • � Mechanical Community Development Services PO Box 9718 Permit #: 11 -103097-00-ME Federal Way,WA 98063-9718 Inspection Request Line: (253) Ph:(253)835-2607 Fax:(253)835-2609 p q 835-3050 Project Name: MACDONALD a,$I/4 Q6 Project Address: 4847 SW 315TH PL Parcel Number: 189870 0230 Project Description: replace existing gas furnace , Owner Applicant Contractor DOUGLAS A MACDONALD JAIMIE HOW BRENNAN HEATING&A/C LLC 4847 S 315TH LN BRENNAN HEATING&A/C (GENERAL) FEDERAL WAY WA 98023-2019 4601 S 134TH PL BRENNHA971R9(12/29/11) SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 • 3 ti . _ ter.. , , ' :a 4 ;Permit Informa�tIo =E. ,;1»' Mechanical Valuation 1450 »»tt Is this an Online or O.T.C.application? Yes ,..':,=;:;.:',;-,° • ` :. �7.-q, rt ' .+''-,11 rpaures M - .1' .: „ 4. `Z "4• _.. >v , Furnaces 1 PERMIT EXPIRES Sunday, January 29, 2012 Permit Issued on Tuesday, August 2, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in ccordance with the laws, rules and regulations of the State of Washington 64and the City of Federal Way. (, Owner or agent: Date: t5 —d -1/ FI# U€1' ii4t lii r r' ` THIS CARD IS TO ,MAIN ON-SITE CITY OF • ' THIS In ection Record Federal Way INSPECTION REQ TS: (253) 835-3050 PERMIT#: 11-103097-00-ME Address: 4847 SW 315TH PL Project: DOUGLAS A MACDONALD FEDERAL WAY, WA 98023-2019 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in (4165) ❑ Gas Piping(4125) ❑ Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By fLp- Date 9... ll...._ ii FILE ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date