Loading...
11-103846 Mechanical City of Federal Way • W Community Development Services Permit #: 11-103846-00-ME P.O.Box 9718 Federal Way,WA 98063-9718 Line:ect InS ion Request (2 53)(253)835-2607 Fax'(253)835-2609 p 835-3050 FILE Project Name: GOMEZ Project Address: 30522 5TH AVE SW Parcel Number: 178890 0370 Project Description: Remove and replace gas furnace Owner Applicant Contractor CAROLINE K GOMEZ SARAH TURNER GLENDALE HEATING&A/C 30522 5TH AVE SW GLENDALE HEATING&A/C GLENDHA053Q2 (11/2/11) FEDERAL WAY WA 98023 12462 DES MOINES WAY S 12462 DES MOINES WAY S SEATTLE WA 98168-2266 SEATTLE WA 98168-2266 Mechanical Valuation 2706.24 Is this an Online or O.T.C.application? Yes rt- N .: ,.r. `fit ,`• ♦, �. ' .i' Furnaces 1 PERMIT EXPIRES Tuesday, March 20, 2012 Permit Issued on Thursday, September 22, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: 1 q (�Z I FIN.1 L CD A /so Ai i 44;11 ` THIS CARD IS TO MAIN ON-SITE CITY • °F Construction I ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT #: 11-103846-00-ME Address: 30522 5TH AVE SW Project: CAROLINE K GOMEZ FEDERAL WAY, WA 98023-3914 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in (4165) 0 Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date 'BO S Data--3o 71/ 0 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date