Loading...
15-103451r� ►• '.— w- i , City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 BILE Project Name: LAKE HAVEN ESTATES LOT 5 Project Address: 1607 SW 340TH ST Wilding - Sifigle Vamily PermitSJ #: 15 -10345.1 -00 -SF Inspection Request Line: (253) 835-3050 Parcel Number: 403325 0050 Project Description: NEW - Construction of a 2 -story, 2,499 square foot single family residence with a 78 square foot covered entry and a 599 square foot attached garage, including plumbing and mechanical. *** 4 bedrooms; $400,000 estimated selling price*** Owner Applicant Contractor lender J K MONARCH LLC J K MONARCH LLC J K MONARCH LLC COLUMBIA BANK PO BOX 188 PO BOX 188 JKMONML874NA (8/1/17) 5727 N 21ST ST PUYALLUP WA 98371 - PUYALLUP WA 98371 PO BOX 188 TACOMA WA 98401 PUYALLUP WA 98371 Census Category: 101- New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load Floor Areas . ft. 2,499 0 0 0 Additional Permit Information New / Additional Sq. Feet - 1 st Floor....................1085 New / Additional Sq. Feet - 3rd Floor....................0 New / Additional Sq. Feet - Basement...................0 Occupancy # 1 -Construction Type ........................Type V - B New / Additional Sq. Feet - Garage ....................... 599 Occupancy # 1 -Class .............................................R-3 Plumbing to be Included?.......................................Yes Occupancy # 1 -Use ............................................... Residence (1 or 2 family) Plumbing Fixtures New / Additional Sq. Feet - 2nd Floor...................1414 Occupancy # 1 - Area (Sq. Feet).............................2499 BasicPlan?........................................................... No New / Additional Sq. Feet - Deck .......................... 0 Mechanical to be Included?....................................Yes New / Additional Sq. Feet - Other .......................... 48 New / Additional Sq. Feet - Total .......................... 3146 Bathtubs ......................................... 2 Dishwashers................................... 1 Laundry Washer Outlets ............... 1 Lavatories ....................................... 4 Showers.......................................... 1 Sinks............................................... 2 Water Closets ................................. 3 Water Heaters................................. 1 Hose Bibbs..................................... 2 CONDITIONS: 1. Prior to final inspection approval, a minimum of one significant tree replacement tree shall be planted on this lot. The tree shall be an evergreen tree a minimum 6 feet tall, or a deciduous tree with a minimum 2 -inch caliper measured 4.5 feet above the root ball minimum. This is a condition of the plat and as identified in applicant AHBL memo to City dated September 24, 2015. IT PqWIT EXPIRES Saturday,,-Apr 2ND 6 Permit Issued on Mondayob hereby certify that the above information is correct and th ion the above described property and the occupancy and the use wil a in accorcLance with the laws, rules and regulations of the State of Washington d the City of Federal Way. Owner or agent: Date: d City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by CChy staff. Tenant Name: LAKE HAVEN ESTATES LOT 5 Address: 1607 SW 340TH ST Permit #: 15 -103451 -00 -SF Includes: # 1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load Floor Area (sq. ft.) 2,49e 1 0 1 0 0 Owner Name: J K MONARCH LLC Owner Address: PO BOX 188 PUYALLUP WA 98371 aQQOC�D b-l�c—llo Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severiy affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affedting the construction or use of said structure or the land upon which itis situated. Such compliance is the responsibility of the owner and / or occupant of the premises. CITY of �N1��Mh�. • TRIS CARD IS TOMAIN ON -SITS - Federal Wa 0 Construction In ection Record y INSPECTION REQU TS: (253) 835-3050 PERMIT #: 15 -103451 -00 -SF Address: 1607 SW 340TH ST Project: OMEGA INTERNATIONAL INVESTI FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. SWM Precon Sib Approved By Date Foundation Wall (4115) Approved to place concrete By V -4g, Date t 1 l 26. 1 C- Slab/Concrete Floor (4255) Approved to place concrete By Date Shear Walls (4245) Approved to install siding By A-p� Date ll 21 Mechanical Rough -in (4165) Approved By P J Date Interim Erosion Control (4370) Approved By Date To be done prior to breaking ground By Date Drainage/Downspout (4040) Approved to backfill By 60 Date � 2 E] Underfloor Framing (4285) Approved to sheath floor BY A.J Date 1/41a. t. 0 Roof Sheathing (4220) Approved to install roofing By Aoj Date L t2_1 Gas Piping (4125) Approved to release test By j4(3 Date A I � �t Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved IBC 1093.4 Footings/Setback (4110) Approved to place concrete By IM, Date Vt (241 lr 0 Plumbing Groundwork (4190) Approved to cover By Date 0 Floor Sheathing (4105) Approved to install flooring By tr,,f'j Date 31 til ( ho Rough Plumbing (4230) Approved By A -.1J Date 2 0 Fire/Draft Stops (4095) Approved Date 3 -17- (�P Framing (4120) Approved to insulate B Date 4ClAt4s R4, ?�j(%&rdIK4AVaIe kf Rkai. EJ Insulation (4150) Approved to install wallboard �j Date 7:T— 7t�5_ Gypsum Wallboard Nailing (4130) Approved to install mud & tape Date �3D= � � Final Electrical E] By FinalErosion Control (4375) Approved Date Final - Mechanical (4065) Approved E] Final - Plumbing (4075) Approved E] Final - Building (4050) Approved By KA Date j!rI tli l By V* Date$(2li Ib BY Date By Date 4ClAt4s R4, ?�j(%&rdIK4AVaIe kf Rkai. EJ Rough Electrical Approved Final Electrical Right of Way Approved Approved By Date By Date By Date D ATE INSPECTOR AREA AND TYPE OF' i 3(X4 t6 ak* - OK Tb ins-6(t e-'," j;Fcr,t + ik+ �-tr 141rc. Ah Ah LIMITATIONS: This report is considered preliminary and subject to change upon review by our project manager. The information REVIEWED M initial/date) contained herein is provided solely for our client and should not be transmitted to a third party without the full written permission of 2.7 GeoResources, LLC. This report presents opinion formed as a result of our observations of activities relating to engineering geology and geotechnical engineering. The GeoResources, LLC field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress and quality of the work. The contractor is solely responsible for WRITTEN BY (initial/date) its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents. We rely on the contractor to comply with the plans and specifications throughout the duration of this project irrespective of the presence of our representative. Our work does not include supervision or direction of the actual work of the contractor, his employees or agents. Our firm will not be responsible for job or site safety. GeoResources, LLC is not a licensed surveyor and is not responsible for line and - I 01� /or grade. Page 2 Of 2 DAIrV FIELD REPORT PROJECT NO.: JKMonarch. 1 607SW340thSt 5007 Pacific Hwy E. Ste 16 REPORT DATE: Monday, November 23, 2015 REPORT NO.: 2 Fife, Washington 98424 --------- GR FIELD REP.: DRT Office: (253) 896-1011 Fax: (253) 896-2633 PERMIT NO.: PROJECT NAME/LOCATION JKMONARCH.1607SW340THST, FEDERAL WAY, WASHINGTON LIMITATIONS: This report is considered preliminary and subject to change upon review by our project manager. The information REVIEWED M initial/date) contained herein is provided solely for our client and should not be transmitted to a third party without the full written permission of 2.7 GeoResources, LLC. This report presents opinion formed as a result of our observations of activities relating to engineering geology and geotechnical engineering. The GeoResources, LLC field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress and quality of the work. The contractor is solely responsible for WRITTEN BY (initial/date) its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents. We rely on the contractor to comply with the plans and specifications throughout the duration of this project irrespective of the presence of our representative. Our work does not include supervision or direction of the actual work of the contractor, his employees or agents. Our firm will not be responsible for job or site safety. GeoResources, LLC is not a licensed surveyor and is not responsible for line and - I 01� /or grade. Page 2 Of 2 r DAIM FIELD REPORT PROJECT NO.: JKMonarch. 1 607SW340thSt 5007 Pacific Hwy E. Ste 16 REPORT DATE: Monday, November 23, 2015 REPORT NO.: 2 Fife, Washington 98424GR FIELD REP.: DRT ..........--- _............... __.._.._. Office: (253) 896-1011 --._.__ ....... Fax: (253) 896-2633 PERMIT NO.: PROJECT NAME/LOCATION JKMONARCH.1607SW340THST, FEDERAL WAY, WASHINGTON REPORT SUBMITTED TO: CLIENT JK Monarch cc Roy Simmons Jeff S CONTRACTOR NAME AND CONTACT: General SUBCONTRACTORS FOR GEOTECHNICAL CONSTRUCTION Earthwork WEATHER Cloudy, 40's & TEMP. { TIMES OF SITE VISITS: From 12:45 To 1:45 From To ... ...... ..From To FIELD NOTES A GeoResources representative arrived on site at the request of Mr. Jeff S. with JK Monarch to General observe the excavation for the foundation elements at the site. We observed 2 — 4 inch quarry spalls at the location shown on page 2. The subgrade soils appeared to be tan/light brown silty SAND with gravel. The quarry spalls appeared compacted. We tested the quarry spalls at random locations with a Yz-inch steel T -probe and observed less Bearing than 2 inches of penetration, indicating a dense condition. Capacity Based on our observations it is our opinion that the subgrade observed today is suitable to support 1,500 psf in bearing in its current condition. Should the subgrade become saturated or disturbed prior to the pour the disturbed soil should be removed and replaced per the project plans. A picture of the site during our visit is included on page 2. LIMITATIONS: This report is considered preliminary and subject to change upon review by our project manager. The information contained herein is provided solely for our client and should not be transmitted to a third party without the full written permission of GeoResources, LLC. This report presents opinion formed as a result of our observations of activities relating to engineering geology and geotechnical engineering. The GeoResources, LLC field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress and quality of the work. The contractor is solely responsible for its means, methods, sequences, construction site safety, quality of work, and adherence to the contract documents. We rely on the contractor to comply with the plans and specifications throughout the duration of this project irrespective of the presence of our representative. Our work does not include supervision or direction of the actual work of the contractor, his employees or agents. Our firm will not be responsible for job or site safety. GeoResources, LLC is not a licensed surveyor and is not responsible for line and /or grade. REVIEWED QY JPM initial/date) BY (initial/date) Page 1 of 2 Rr_f'"EIVED � CITY OOF<' JUL 15 2015 PERMIT APPLICATION ��4ID Federal Way 3 CITY OF FEDERAL WAY CDS PERMIT NUMBER / 1-o j+5 - TARGET DATE SITE ADDRESS ITE/UNIT # 1607 SW 340th St Federal Way, WA 98023 PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL # $ 250,000 RS j 9 2 -6 `I _ i TYPE OF PERMIT Z BUILDING V PLUMBING 9Z MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT Lakehaven Lot #5 PROJECT DESCRIPTION New construction single familV residence with attached 3 car garage. Detailed description of work to be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER JK Monarch (253)840-5660 MAILING ADDRESS E-MAIL PO Box 188 permits@jkmonarch.com CITY STATE Puyallup WA Fii�98371 NAME JK Monarch PHONE (253)306-4383 CONTRACTOR MAILING ADDRESS PO Box 188 E-MAIL roy@jkmonarch.com CITY Puyallup STATE WA ZI�98371 FAX WA STATE CONTRACTOR'S LICENSE N N DATE FEDERAL WAY BUSINESS LICENSE # JKMONML874NA n2/ 1 / 20 -15 -103162 -00 -BL NAME JK Monarch PRIMARY PHONE (253)840-5660 MAILING ADDRESS PO Box 188 E-MAIL APPLICANT CITY Puyallup STATE WA ZIP 98371 _permitsC@jkmonarch.com FAX PROJECT CONTACT NAME Filipp Kapustin PRIMARY PHONE (253)840-5660 MAILING ADDRESS PO Box 188 E-MAIL permits@jkmonarch.co (The individual to receive and respond to all correspondence CITY Puyallup STATE WA U ZIP 98371 FAX COttCernitt9 this application) PROJECT FINANCING NAME Columbia Bank ❑ OWNER -FINANCED Required value of $5,000 or more (RCW 19.27.095) MAILING ADDRESS, CITY, STATE, ZIP 5727 N 21 st St Tacoma, WA PHONE (253) 761-8170 I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as apart of this application. --�- _— SIGNATURE: DATE 07/06/15 PRINT NAME: Flllpp Kapustin BUlletin #100 —January 1, 2013 Page l of 3 k:AHandouts\Pcrmit Application • 0 VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ 8,000 Indicate how many of each type offixture to be installed or relocated as part of this project. Do not include existing res to remain. AIR HANDLING UNITS 9 FANS 9 GAS PIPE OUTLETS OTHER (Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS (commcmiai BOILERS �_ FURNACES HOT WATER TANKS pas) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION (in square feet) BASEMENT EXISTING VALUE OF PLUAMING WORK PLUMBING PERMIT FOR OFFICE USE ..... ..:)...................................................._...............................................__....... ....... ..._........ .._..._-.... i ol? �.. _... FIRST FLOOR (or Mobile Home) SECOND FLOOR NEW BUILDING 1,085 1,414 1,085;r, ,085 1,414 COVERED ENTRY $ 8,100 Indicate how many of each type offixture to be installed or relocated as part of this project. Do not include existing -fixtures to remain. '' BATHTUBS (or Tub/Shower combo( 4 LAVS (Hand Sinks( �_ TOILETS WATER PIPING 1 DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS ` SINKS (wtrhen/utilitM �_ WATER HEATERS (Electric( HOSE BIBBS SUMPS 1 WASHING MACHINES 17 TOTAL FIXTURES TENANT ARI -: -GLOM GRAVEL SIAM A MNMOF M M To MAN V OR Q;PAITO VMVATED PORTON OF IM LOT, }STAN ON SM cY_91jfyg DRAINAGE SITE DRAINAGE: ROOF -TIGHT LINE TO STORM STUB DRIVEWAY -ROUTE TO ROAD SILT FENCE -DET AIL - NTS b 2 R-2W MIK 61 MK POR ow M FAMLY Loom ,V To b• U14.RRf fPALLb FOR !Y' 166' ,M& TION ENTRANCE CONSTRUCTION NT5 SILT FENCING AS REQUIRED CONSTRUCTION ENTRANCE STOCKPILED SOIL ?" .%a 04 ttic zoo,,% -zq— SEC 0",." o...k RECEIVED JUL 16 2015 CM OF FEDERAL WAY CDS LA<EHAvEN ESTATES DATE: 7/15/15