19-102042 Mechanical
City of Federal Way FILE Permit #:19-102042-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: HUSTON
Project Address: 4129 SW 325TH ST Parcel Number: 873201 0600
Project Description: FURNACE CHANGE OUT ADD AC
Owner Applicant Contractor
CALLY HUSTON JENAH BARLOWMM COMFORT M M COMFORT SYSTEMS(GENERAL)
4129 SW 325TH ST SYSTEMS MMCOMCS85564(9/24/19)
FEDERAL WAY WA 98023 18103 NE 68TH ST SUITE C-200
REDMOND WA 98052 18103 NE 68TH ST SUITE C-200
REDMOND WA 98052
Additional Permit Information
Mechanical Work Valuation? 7500 Is this an Online or O.T.C.application? Yes
a tW 3'�x Cie :., 4 33v�-�'• sj ir y j3�3�
l3T_�, n��,e, .. �,,,, �`a�,� .�,� ., ._ `ds� 3;+�v .�>. ...✓.3... � ,_.Y. ,�,., � j. „3,.� a� �S%.���,�'
Air Conditioners-Stand Alonc 1 Furnaces 1
PERMIT EXPIRES Monday,28 October,2019
Permit Issued on Wednesday,May 1,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent ONLINE Date:
THIS CARD IS TO REMAIN ON-SITE
CITY OF 064 Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253)835-3050
PERMIT#: 19 102042 00 Address: 4129 SW 325TH ST
Project: BRANDON HUSTON FEDERAL WAY WA 98023-2427
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until,it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
® Mechanical Rough-in(4165) t Gas Piping(4125) Q Final-Mechanical(4065)
Approved ! Approved to release test Approved q� /f�
-./9‘
By Date ! By Date By �� Date ( '
0 Rough Electrical Final Electrical 0 Right of Way
Approved Approved Approved
,,By Date • By Date By Date