Loading...
18-105984 • • a .. Electrical City of Federal way IL Permit #:18-105984-00-EL Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: DIPLOMAT PROPERTY MANAGER LLC Project Address: 160 S 357TH ST Parcel Number: 114000 0010 Project Description: Electrical work to include panel swap and a dedicated circuit for water heater. Owner Applicant Contractor DIPLOMAT PROPERTY MANAGER LLC JAN ROSANDERCUSTOM ELECTRICAL CUSTOM ELECTRICAL SERVICES LLC 160 S 357TH ST SERVICES LLC (01) FEDERAL WAY WA 98003 3716 AUBURN WAY N CUSTOES893J2(4/22/19) AUBURN WA 98002 3716 AUBURN WAY N AUBURN WA 98002 Additional Permit Information Is this an Online or O.T.C.application? Yes Alt.Serv./Feeder:0 to 200 ami 1 Circuits-Residential 1 PERMIT EXPIRES Saturday,21 December,2019 Permit Issued on Friday,December 21,2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONLINE Date: THIS CARD IS TO REMAIN ON-SITE Feclera�Way Construction Inspection Record • y INSPECTION REQUESTS:(253)835-3050 PERMIT#: 18 105984 00 Address: 160 S 357TH ST Project: DIPLOMAT PROPERTY MANAGEI FEDERAL WAY WA 98003-8602 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 LIFER Ground(4295) 0 Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding(4195) 0 Temporary Power(4275) 0 Service(4235) Approved Approved Approved By Date By Date By Date 1 7❑ Feeders/Sub-panels(4045) ® Rough Electrical(4225) 0 Ceiling Cover(4020) Approved Approved Approved By1( :. Date a 4 By '4 Date , .`'t‘.) By Date 10 Final Approved al(4A5;� 0111 By Date atrlb 4. • 0 Rough Electrical ❑ Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date