Loading...
19-104978 Electrical City of Federal Way FILE Permit #:19-104978-00-EL Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: ABAM OFFICE BUILDING Unit 121 Project Address: 33301 9TH AVE S Parcel Number:926501 0130 Project Description: install separate switch for Suite 121 Owner Applicant Contractor SHELBY CO LLC JANET SIMMONSPOINTER ELECTRIC INC POINTER ELECTRIC INC 1201 PACIFIC AVE UNIT 1400 13845 E RECTOR RD POINTEI148DE(5/31/21) TACOMA WA 984024322 BOW WA 98232 13845 RECTOR RD BOW WA 98232 Additional Permit Information Is this an Online or O.T.C.application9 Yes Circuits-Commercial 1 PERMIT EXPIRES Thursday, 15 October,2020 Permit Issued on Wednesday,October 16,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: 1 THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 19 104978 00 Address: 33301 9TH AVE S Unit 121 Project: SHELBY CO LLC FEDERAL WAY WA 98003-2602 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. i❑ UFER Ground(4295) ❑ Ditch cover(4030) s❑ Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding(4195) ® Temporary Power(4275) I El Service(4235) Approved Approved I Approved By DateBy By Date 1 Date .. 0 Feeders/Sub-panels(4045) ® Rough Electrical(4225) ® Ceiling Cover(4020) Approved Approved I Approved By Date 1By DateA By Date Final-Electrical(4055) roved By Date/OP'77'1, • • El Rough Electrical El Final Electrical Right of Way Approved Approved Approved By Date By DateBy Date