19-104978 Electrical
City of Federal Way FILE Permit #:19-104978-00-EL
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: ABAM OFFICE BUILDING Unit 121
Project Address: 33301 9TH AVE S Parcel Number:926501 0130
Project Description: install separate switch for Suite 121
Owner Applicant Contractor
SHELBY CO LLC JANET SIMMONSPOINTER ELECTRIC INC POINTER ELECTRIC INC
1201 PACIFIC AVE UNIT 1400 13845 E RECTOR RD POINTEI148DE(5/31/21)
TACOMA WA 984024322 BOW WA 98232
13845 RECTOR RD
BOW WA 98232
Additional Permit Information
Is this an Online or O.T.C.application9 Yes
Circuits-Commercial 1
PERMIT EXPIRES Thursday, 15 October,2020
Permit Issued on Wednesday,October 16,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
1
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 19 104978 00 Address: 33301 9TH AVE S Unit 121
Project: SHELBY CO LLC FEDERAL WAY WA 98003-2602
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
i❑ UFER Ground(4295) ❑ Ditch cover(4030) s❑ Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
El Pool Bonding(4195) ® Temporary Power(4275) I El Service(4235)
Approved Approved I Approved
By DateBy
By Date 1 Date
..
0 Feeders/Sub-panels(4045) ® Rough Electrical(4225) ® Ceiling Cover(4020)
Approved Approved I Approved
By Date 1By DateA By Date
Final-Electrical(4055)
roved
By Date/OP'77'1,
•
•
El Rough Electrical El Final Electrical Right of Way
Approved Approved Approved
By Date By DateBy Date