Loading...
02-15-2019 IRGIRG Status Update February 5, 2019 City Council Meeting 1 Property IRG property shown here #1 Existing Headquarters Building #2 Existing Technology Center #3 Rhododendron Garden & Pacific Bonsai Museum #4 Greenline Warehouses “A & B” #5 Khalsa Gurmat Center #6 Greenline Business Park Approx. 425 acres 20+ parcels 6 4 3 2 1 North Lake 5 2 The property is subject to the provisions of the 1994 Weyerhaeuser Company Concomitant Pre-Annexation Development Agreement (CZA) and zoning regulations in effect on August 23, 1994 (Federal Way City Code (FWCC)). Any procedural requirements must meet current code (Federal Way Revised Code (FWRC)). Concomitant Zoning Agreement 3 SEPA Threshold Determination The City issued the SEPA threshold determination for Greenline Warehouse “A” on the IRG campus. SEPA is the state-required determination that evaluates certain environmental impacts by a proposed development. The City’s SEPA determination is called a “Mitigated Determination of Non-significance.” A SEPA appeal was filed on November 30, 2018. The SEPA appeal hearing will occur at a time after expiration of the Use Process III appeal period. Greenline Warehouse “A” 4 Use Process Decision The Use Process (UP) application is Part 2 of land use approval for a development (SEPA being Part 1). The Use Process decision accounts for local codes not covered by SEPA, such as the Weyerhaeuser Concomitant Agreement. UP Decision was issued February 4, 2019 and the appeal period ends February 21. UP decision does not authorize construction; separate construction and building permits are required. Greenline Warehouse “A” 5 UP Decision Review was conducted by the Community Development and Public Works Departments, Lakehaven Water & Sewer District, and South King Fire & Rescue. Conditions of approval address transportation, stormwater, wetlands, tree removal, clearing/grading, landscaping, parking, equipment, noise, and air quality. A summary of the UP conditions will follow on subsequent slides. Greenline Warehouse “A” 6 UP Conditions of Approval Summary Includes SEPA mitigation measures. The proposal was reviewed as a general commodity warehouse with an associate office. A future change in the type of use and/or occupancy shall require review to determine any impacts, including revisiting the SEPA threshold determination and UP decision, as needed. Building plan set shall include a section on parking analysis that demonstrates compliance with required parking ratios and consistency with the UP site plan. Work is not allowed within certain wetlands, streams, and associated buffers. Greenline Warehouse “A” 7 UP Conditions of Approval Summary The UP tree plan shall be attached to the final landscaping plan. All significant trees shall be retained within the Managed Forest Buffer and within areas planned to remain undisturbed to the maximum extent feasible. Clearing/grading on the pond parcel shall be limited to the areas necessary for the stormwater pond and associated conveyance infrastructure. The applicant shall obtain Forest Practices approval. Greenline Warehouse “A” 8 UP Conditions of Approval Summary Minor amendments are required for the critical area report. Install wetland buffer fencing and signage. The city shall not issue any approvals to fill wetlands until all state, federal, or other agency permits as may be required to fill the wetlands have been obtained and verification provided to the city. Greenline Warehouse “A” 9 UP Conditions of Approval Summary The building permit submittal shall address screening of mechanical equipment, electrical equipment, utility installations, and trash/recycling enclosure area. A lighting plan shall be submitted. Provide WSDOT approval of the traffic study, channelization plans, and stormwater conveyance. Transit details shall be shown on the Engineering submittal. The building permit shall reflect requirements outlined in the Right-of-Way Modification. Construction plans including water quality treatment shall be included in the permit submittal. Greenline Warehouse “A” 10 UP Conditions of Approval Summary Incorporate BMPs into the building permit plan set as outlined in the KCSWDM. Applicant must provide stormwater and wetland analysis for parcel #2121049014 (this parcel is located at the SW quadrant of Weyerhaeuser Way and SR-18). Applicant shall record easements to allow storm water conveyance, treatment, and detention for Warehouse “A” on and across the adjacent Warehouse “B” property. Provide updated certificates of water and sewer availability. Greenline Warehouse “A” 11