03-19-2019 S 324th Alignment Comp Plan Amendment1 City of Federal Way Meeting 2018 Comprehensive Plan Amendments March 19, 2019 Presentation to the City Council Proposed S 324th Street Extension Comprehensive Plan Amendment Proposal for Planned Extension of S 324th Street to 32nd Avenue S amended to an extension to Weyerhaeuser Way South 2 City-initiated request to realign the South 324th Street Extension east of I-5 further south to connect with Weyerhaeuser Way South Background 3 3 The Comprehensive Plan is a long range, living document, that identifies a vision for the City. Over time the vision may adapt as new opportunities and information becomes available. Staff evaluates opportunities to allow and enhance Economic Development while still meeting the overall vision. Background 4 4 Existing 5 Conflict with current alignment of South 324th Street Extension 6 6 Proposed Building (latest submittal) Existing Olympic Pipeline Proposed Realignment 6 Future Realignment - S 324th Street Extension 7 Realignment of South 324th Street Extension 8 8 1320 ft. of new 5-lane roadway with roundabout 570 ft. of new 3-lane roadway Remove 980 ft. of existing roadway and traffic circle 980 ft. of new 5-lane roadway with roundabout 8 Traffic Impacts 9 9 9 Existing Pipelines 10 Existing Olympic Pipeline Olympic Pipeline PSE Pipeline Existing PSE Pipelines There is no change in the alignment at the crossing of the existing Olympic Pipeline. The PSE Pipelines are located within the existing Weyerhaeuser Way S road prism already and to the west of Weyerhaeuser Way S. There is no change in impacts at any of the three crossing locations. 10 Wetlands Impacts 11 There are two identified potential wetland fringes within the project area. It has been determined the project can be constructed and they will be further evaluated during the design phase. Potential options include: Slightly shifting the road off-center within the Right of Way Slightly modifying the sidewalk, planter and utility strip Shifting the Right of Way connection point Mitigating the wetlands impacts Wetlands Potentially within project area Wetlands plan prepared by Talasaea Consultants, Inc. for Greenline Business Park 11 Existing Alignment: $12 million S 324th St reconstruction 32nd Ave S reconstruction Removal and reconstruction of existing improvements Right-of-Way Acquisition Proposed Alignment: $4 million S 324th St The above costs are for the improvements shown on the previous slides associated with the Comprehensive Plan Amendment only, not the entire project. The overall project would be reduced from approximately $135 million to $127 million. Cost Difference 12 Adopt the Mayor’s recommendation as contained in the draft adoption ordinance Adopt the Mayor’s recommendation as modified by Council Do not adopt the Mayor’s recommendation Refer the amendment back to Planning Commission for further proceedings Options 13 Questions? 14