Loading...
19-104912 Building - Multi Family Comm'wtyDe a Permit #:19-104912-00-MF 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: CAMPUS VIEW APARTMENTS Project Address: 183 S 340TH ST Parcel Number: 132201 0010 Project Description: ADD-Replacement of two decks/Replacement deck shall be subject to field inspection by City Building Inspector-no plans. Owner Applicant Contractor Lender PATRICIA NELSON ISAIAH PARKSTEADFAST STEADFAST CONSTRUCTION 10101 SE 3RD ST UNIT 404 CONSTRUCTION INC INC BELLEVUE,WA 98004-6080 4913 70TH AVE W 4913 70TH AVE W UNIVERSITY PLACE WA 98467 UNIVERSITY PLACE WA 98467 Census Category: 437-Commercial alt/add/conversion Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area(sq.ft.) ' Additional Permit Information Mechanical to be Included? No Plumbing Work Valuation/ 0 Mechanical Work Valuation? 0 Number of Stories 1 Is this an Online or O.T.C.application/ No Permit for Building Shell Only? No Plumbing to be Included/ No Total Valuation:2,956.40 CONDITIONS: Post to footing shall be exposed at time of inspection.All post to beams,post to footings shall be mechanically connected; blocking shall be installed over bearing points,between joists. Access shall be provided to second story deck at framing/final inspection PERMIT EXPIRES Wednesday,8 April,2020 Permit Issued on Friday, October 11,2019 , I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ashington and the City of Federal Way. Owner or agent: Date: 1Q l/ 1 [ � '110k\tr\ THIS CARD IS TO REMAIN ON-SITE Feder'tA* Construction Inspection Record Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 19 104912 00 Address: 183 S 340TH ST Project: PATRICIA JOAN NELSON FEDERAL WAY WA 98003-6637 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ,® Initial Erosion Control(4365) ® Footings/Setback(4110) 0 Foundation Wall(4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete By Date •1 By Date �By Date •El Drainage/Downspout(4040) El Re-steel(4215) 0 Slab/Concrete Floor(4255) Approved to backfill Approved to place concrete or grout Approved to place concrete By Date By Date By Date • ® Underfloor Framing(4285) ® Floor Sheathing(4105) El Shear Walls(4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date El Roof Sheathing(4220) 1 0 Fire/Draft Stops(4095) EI Interim Erosion Control(4370) Approved to install roofing Approved • Approved By Date By Date By Date Prior to scheduling a Framing inspection; 13[ Framing(4120) �d Insulation(4150) Electrical,Plumbing&Mechanical Rough-in Approved to insulate Approved to install wallboard and Fire/Draft Stop inspections must be signed- oPfand approved. IBC 109.34 By a Date 1017 • By Date EI Gypsum Wallboard Nailing(4130) El Suspended Ceiling Grid(4265) I=1 Final-SKF&R(4060) Approved to install mud&tape Approved to drop tile Approved By Date By Date By Date $ Final-Planning El Final Erosion Control(4375) ® Final-Building(4050) Approved Approved Approved • By Date i By Date ..By /4. Date /0 LA 'c 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date