19-102877 Building - Commercial
City of Federal Way Permit #:19-102877-00-CO
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: CELEBRATION CENTER SUITE B-201
Project Address: 1414 S 324TH ST Parcel Number: 150050 0080
Project Description: TI-Provide new accessible restroom and provide exit to fire rated corridor. Includes
plumbing and mechanical.
Owner Applicant Contractor Lender
HARSCH INVESTMENT MIKE LEEBOWMAN CREEK MIKE LEEBOWMAN CREEK OWNER IS LENDER
PROPERTIES CONTRACTING LLC CONTRACTING LLC
1414 S 324TH ST 5420 RANDALL AVE SE 5420 RANDALL AVE SE
FEDERAL WAY WA 98003-8444 AUBURN WA 98092 AUBURN WA 98092
Census Category: 437-Commercial alt/add/conversion
Includes: #1 #2 #3 #4
Occupancy Class: M
Construction Type: Type V-B
Occupancy Load:
Floor Area(sq.ft.) 2,712.00
Additional Permit Information
Occupancy#1-Area(Sq.Feet) 2712 Occupancy#1-Construction Type Type V-B
Mechanical to be Included9 Yes Plumbing Work Valuation9 5000
Mechanical Work Valuation? 1450 Number of Stories 2
Is this an Online or O.T.C.application9 Yes Permit for Building Shell Only9 No
Plumbing to be Included9 Yes Occupancy#1-Use Retail/Mercantile
Comprehensive Plan Designation City Center Frame Zoning Designation CC-F
Total Valuation: 13,000.00
Fans 1
Lavatories 1 Water Closets I Water Heaters
PERMIT EXPIRES Wednesday, 11 December,2019
Permit Issued on Friday,June 14,2019
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way. i q
Owner or agent: 2 Date: / 1-1 I /
� 1�a1�
THIS CARD IS TO REMAIN ON-SITE
Federal Wa Construction Inspection Record
y INSPECTION REQUESTS:(253)835-3050
PERMIT#: 19 102877 00 Address: 1414 S 324TH ST Unit B-201
Project: HARSCH INVESTMENT PROPERTI FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
® Initial Erosion Control(4365) � Footings/Setback(4110) ID Re-steel(4215)
To be done PRIOR to breaking ground I Approved to place concrete Approved to place concrete or grout
• •By Date By Date � By Date
,
® Plumbing Groundwork(4190) ® Slab/Concrete Floor(4255) El Underfloor Framing( )4285
Approved to cover j Approved to place concrete Approved to sheath floor
By Date
By Date i By Date
® Floor Sheathing(4105) ® Rough Plumbing(4230) Q Mechanical Rough-in(4165)
Approved to install flooring Approved Approved
•;By Date i By y.. Date i(1)/ti'n .,By 41J Date 11/4/17
El •
11 Gas Piping(4125) i• Fire/Draft Stops(4095) '1 El Interim Erosion Control(4370)
Approved to release test Approved Approved
By Date ABy Date .i�By Date
Prior to scheduling a Framing inspection; ® Framing(4120) j El Insulation(4150)
Electrical,Plumbing&Mechanical Rough-in Approved to insulate
and Fire/Draft Stop inspections must be signed-
off
Approved to install wallboard
and approved. IBC 109.3.4
By Date i° /1 .: By Date
,'l 7 Gypsum Wallboard Nailing(4130) •'•0 Suspended Ceiling Grid(4265) ,' .
Final-SK S K F&R(4060)
Approved to install mud&tape Approved to drop tile Approved
By Date i
• J.By Date By Date
•
El Final-Planning ' El Final Erosion Control(4375) El Final-Mechanical(4065)
Approved Approved Approved
i
By Date ' By Date By S Date /0
•
El Final-Plumbing(4075) El Final-Building(4050)
Approved Approved
By 2111 Date 0 y If .X By' 4 Date Io/3l lin
0 Rough Electrical El Final Electrical 0 Right of Way
Approved Approved Approved
By Date By Date By Date
i
i
k ;
Li,
ea 1 I
I
1° i
if
§ li 9'
1--)
,,,, 0 i il i
I
Qi , te,,, 1 00 Ai 4 li
0,4 6,4
to-4 i ) . ....., k
4't 1 IJ.
„,-..) (!4 '-' Y- P I 1= i §
t el 41°
4C t L,,) i „,, -v %I. 11.4 410 P...N g ir- - a
'” 11 N N
g 11,- $ o I r,
i -1.'19 NI D 1 I. ' f . ii.,
i 2 re) uto ^,-N
.. al ,.. ' i'fl 1
1:14 + g.; 1 i k i I 44/4- 14i.t2 1 iri 1 1-.4 11 b7- It14 I
..,4
0 "
g .. ..-- .,
Ad 1 1 2 1k.
i V t
3+ 41
-f,
_
1§ 4
.1
..- i
.-4 ,,, .. A ..J 1
foil 1 i 1 1,4i g .§, . -44, i 1 g 1 i
1p i
‘I‘ 'fita. ii I I f
P1114 +1
I it
4t4:4 .4t. 14 44) ./,. a 1‘41 1 fr
ii Iii 1:
ft.
CI 'ft*ti '''''
- N )
.** *
III its
I
at 1 1 itZI - ,... Nn- 4% '11 --1/4 el4Ct Q , 1,-‘• 1 .3
I/14
—
t I(
---7
aNi
-4
I 1 1
0 1
. i
..,, X .1,...,4 I'S
.,,,> C../ t'• uj I 0 ,...„ , c..T., '
,--- LIJC ()C)I 4'" 1 '4 ' ..S4171M.a'!-*14 1-1%; I*;N•3" C;, ,. 4 lizs* i 3 1 4 i 1 iSli V ;I I
t 11 0 I it illia
(....) 6,-?-* e"<*i ti. g r\1 ta :-..-,,.: % a g r• 4?, - I livvt ...)
Ljj .±.„7,- .1.;.,;i: ,i .., 4+.. _0, ...,, , .4:1 ' Z`12.*".. 44...., •eS 1._ :-,,jt"' : Ni i °I 1 1 LI -Gilt ° N if
1•4) {
I
>' 'Z'l n i II 1
1
. b
E. t .., v ti li i 4 1 . al
8 8 4=, 1 1 k
/ 1 i
R 0 t 0 -. t
To" 1 iIQ° 2 a Nts g I 1 II. t I -
t 1 4. P 8
11 6 . r . 1 I ;
II
I Li): 14 _ 1 "" g r§ g .01 ill'
410 ....
..g1S:•a; :''' jt V i 1 l t4i
g
34C1
41) .7/ 1 4, i
5 U.
t 'A
VALUE OF MECHANICAL WORK
MECHANICAL PERMIT /j uD
1
Indicate how maniaof each t e off re to be Inst .: relocated as part of this noject.Do not include existing j"u tures to remai.
MR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Deaczibe)
AIR CONDITIONER FIREPLACE INSERTS HOODS(coo,apereiay
BOILERS FURNACES HOT WATER TANKS lana(
COMPRESSORS GAS LOG SETS REFRIGERATION SYST
,— DUCTING GAS PIPING WOODSTOVES
VALUE OF PLUMBING WORK
PLUMBING PERMIT
Indicate foa, o each tx. re to be installed or Tel9cated as hart of this project.Do not include exasti tit tures to remain.
BATHTUBS(erhb/sha.:erCombo) - — LAYS(Haul f TOILETS WATER PIPING
DISHWASHERS RAINWATER SYSTEMS r URINALS OTHER(Describe)
DRAINS SHOWERSVACUUM BREAKERS
DRINKING FOUNTAINS SINKS([6tehea/uokgq ---"T-
I WATER HEATERS Wm..
HOSE BIBBS SUMPS WASHING MACHINES TOTAL FDLTURBs
GENERAL INFORMATION
CRITICAL AMNIA ON PROPER??? WATER PUAVLYOE BIER PORVMY= VALUE OP ZUSTINO nemtarumpers
f NA— w Pr 'e-- f1c-
Y J�a WT w* II*Maw Feat) EIIernro FERE*PAs1ELEu SYBffC S? ' PROPOBD 5 RL EUPPR Ott 9Y11`10—
f.2,1! A'1/0 Yes❑ No ❑Yes o No
1CAVitaW * `t
RESIDENTIAL — NEW OR ADDITION
'<' ..,.e RIPTION In square feet) EX/STING PROPOSED TOTAL FOR OFFICE USE
ip,
FIRST FLOOR(or Mobile Horn: C
COVERED ENTRY .
m
GARAGE 0 CARPORT
1
Area TotaYa _
ESTIMATED SELLING PRICE$ _ __ 0 OF BEDROOMS
CoMME I*, NEw/ADDITION
AREA DESCRIPTION Area is Occupancy Groupie) C traction Addi nal Information
stories
t`
3K W,y� ,,.,sem®' -� ,o_ <.3, �._,_�` '.,Y.„:,,,. � ,yam. ,4. ,fla.
R
Alamitos
COMMERCIAL—REMODEL/TENANT IMPROVEMENTS
Area in Construction f of
ARBA DESCRIPTION pttrs Fest Occupancy Pia) stories Additiomd Information
TENANT AREA OILY A7 J']
R
��z- �' i+ fa � y v0 �A Y �y�by
vcM � � ao ,e . d, r � "E., x.�4�-.g$�., 3 7i.: 1�1. e- � f
Bulletin#100—January 29,2016 Page 2 of 2 k:\Handouts\Pe mit Application