17-100442 ,, Building - Single Family
City of Federal Way - Permit #:17-100442-00-SF
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 "
Project Name: WOODBURY 4 , •;a-
Project Address: 4814 SW 330TH CT .. Parcel Number: 802950 0410
Project Description: ALT-Tear off existing roo ,nd repla wi p ition roofing.
Owner , ica 0' Contractor Lender
CHRISTOPHER M WOODBURY N • L PLATINUM ROOFING
4814 SE T 00 ' LLC 1435"U"CT NW
FEDERA Y WA 23 35 NW U CT vV./BA URN WA 98001
AUBURN WA 98
Cen s Cargo j- i alt/ahan in number of units
Includes: #1 03 #:014 #3 #4
Occupancy C 1
Construction Type: _ifii q/ch
Occupancy Load:
Floor Area(sq.ft.)
Additional Permit Information
Mechanical to be Included? No Is this an Online or O.T.C.application? No
Plumbing to be Included? No Comprehensive Plan Designation SF-High-Density
Residential
Zoning Designation RS 9.6
Total Valuation:21,760.00
PERMIT EXPIRES Saturday,29 July,2017
Permit Issued on Monday,January 30,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 2 1\ Date: //3U /7---
•
\NO(C Stiarift4kA .r
40P, THIS CARD IS TO REMAIN ON-SITE
sp
Feder • Construction Inection Record ` ' `
y INSPECTION REQUESTS: (253)835-3050
PERMIT#: 17 100442 00 Address: 4814 SW 330TH CT
Project: KATHERINE J WOODBURY FEDERAL WAY WA 98023-3319
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
#E3 Roof Sheathing(4220) •E1 Final-Building(4050)
Approved to install roofing Approved
By Date —. By Date
0 Rough Electrical 0 Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date •