Loading...
19-103954 Electrical • City of Federal Way Permit #:19-103954-00-EL Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: UNO Project Address: 30620 2ND AVE SW Parcel Number: 556000 0760 Project Description: Move dryer hookup;add 2 outlets Owner Applicant Contractor GORDY UNO GORDY UNO OWNER IS CONTRACTOR 30620 2ND AVE SW 30620 2ND AVE SW FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 USA USA Additional Permit Information Is this an Online or O.T.C.application? Yes Circuits-Residential 2 PERMIT EXPIRES Friday, 14 August,2020 Permit Issued on Thursday,August 15,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: W Date:T-' � (5, — THIS CARD IS TO REMAIN ON-SITE Federal Way Construction Inspection Record Fed y INSPECTION REQUESTS:(253)835-3050 PERMIT#: 19 103954 00 Address: 30620 2ND AVE SW Project: GORDY UNO FEDERAL WAY WA 98023-3906 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. • ® UFER Ground(4295) , ® Ditch cover(4030) El Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding(4195) ® Temporary Power(4275) 0 Service(4235) Approvedi Approved Approved By Date By Date By Date ® Feeders/Sub-panels(4045) ® Rough Electrical(4225) 1 ® Ceiling Cover(4020) Approved Approved Approved .By Date �;�By ��`" Date /C 2 /O'/9 .;By Date ID Final-Electrical(4055) Approved By /.1 Date /Zip '? 0 Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date IA RECEIVED ELECTRICAL CITY OF Federal Way AUG5 2019PERMIT APPLICATION CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT 3 PERMIT NUMBER i / _ / 0 q y _ t SUITE/UNIT/SPACE# SITE ADDRESS: 30 4o20 2t,c) Aum s, (-%-) w r PROJECT VALUATION ASSESSOR'S TAX/PARCEL# CURRENT/PROPOSED USE $ `1Ua 45 cS (`o eD 0 0 _ 0 ---77 & 0 PROJECT NAME (Tenant or Homeowner Last Name) G o e)� U v%_ P#k-05 v e_ tis- cue:I t-,-- cJ PROJECT DESCRIPTION a c) 1to.4-s Detailed description of work to be included on this permit only NAMEII PRIMARY PHONE PROPERTY OWNER GO��� U v• O (206.)72C2- 41o26MAILING ADDRESS E-MAIL CITY STATE ZIP FAX ekre( Ww' it CrZ02-3 ( ) - NAME PRIMARY PHONE ( ) MAILING ADDRESS E-MAIL ELECTRICAL CONTRACTOR CITY STATE ZIP FAX ( ) - WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# / / NAME -.. _ PRIMARY PHONE ��te� U G (Zf 743- f�zs 26 APPLICANT MAILING ADDRESS gd��v E-MAIL 36C,, 2O 9•1.04-C. nuc GO - QG�ai [ .C-61AN; CITY STATE ZIP FAX rtJ p,"4( Wu, c.j , gF623 ( ) - NAME PRIMARY PHONE PROJECT CONTACT ( ) _ I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. SIGNATURE: .n./ DATE " / S—` / 9 PRINT NAME: GU u- .---( j U ti Bulletin#160–April 14,2016 Page 1 of 1 k:\Handouts\Electrical Permit Application RECEIVED 1 9 - I ° 0 3�15�f 0 L �fTYaF : AUG 15 2019 Property Owner ��,�r p Y Federal CITY OF FEDEI tIpy CpMMUNfIYDEYE wytrical Work Permit Application Applying For Your Electr cal Permit In Washington, only licensed electrical contractors may perform electrical work. Property owners may apply for an exemption from these requirements by completing this application and signing the affidavit below before beginning electrical work. _ 4 .Af'fdavit r _;�I I eF Z tisri As authorized under RCW 19.28.261, I, Govr�t, Uv\..a hereby apply (Printed name of property owner,renter,or lessee) for an exemption from the electrical licensing and certification requirements of RCW 19.28 by t submission of this affidavit. Which'statement describes you? (Mark only One If none apply,you may not take out this permit) A. I own this property. 1 t Your name or your company's name must be shown on the deed to the property. Real estate agents'property i management companies, relatives, etc. cannot purchase permits for the property owner. - 4 ❑ I rent or lease this property. _ 1 We need a copy of your rental agreement showing you have permission to perform electrical work O I am an officer for a 501(c)(3) nonprofit corporation,or a nonprofit religious organization. The total market value of electrical work must be$30,000 or less and all electrical work must be done by a i non-compensated appropriately certified electrician. 1 1 Select yourproperty type;(Mark only onife none apply you may nal takeothis perm ut it) I ❑ New single family residence that is not intended for rent, sale, or lease, where I will be living for at least 24 months after completing the electrical work. I will be personally doing the electrical work. ❑ New 2,3,or 4 unit residential building,owned by me,that is intended for rent, sale, or lease. I will be living in one of the units for at least 24 months after completing electrical work. I, I personally, and/or a regularly employed employee(s),will be doing the electricalwork. ElNew place of business,farm,or other property: Any new structure that is not intended for rent, sale, or lease. I>personally,and/or a regularly employed employee(s),will be doing the electrical work. 1 i Jai, Existing residential property, place of business,or farm. I,personally,and/or a regularly 1 employed employee(s),will be doing the electrical work. g DEPARTMENT OF COMMUNITY DEVELOPMENT/33325 8T8 AVENUE SOUTH/FEDERAL WAY,WA 98003-6325 253-835-2607 Is.www.cityofiederalway.com zs permitcentert cityoffederalway.com Bulletin#080—June 6,2018 Page 1 of 2 k:\Handouts\Property Owner Electrical Work Application . • ❑ 501(c)(3) or nonprofit religious organization owned property:The total market value of the electrical work must be$30,000 or less,and all electrical work will be performed by appropriately =! certified electricians,or certified and properly supervised trainees,who are volunteering and not being compensated for the electrical work per RCW 19.28.091(7). Your signature is required below: I believe I should be exempt from the requirements to obtain an electrical license,or use a certified electrician,as provided under RCW 19.28.261. By signing below,I certify the information I am providing on this affidavit is true and accurate. I understand that if I make false statements or misrepresentations,I may be assessedespenalties. "> l�v vJ �/ vt U V/t-c— Printed ISame of Property Owner,Renter,or Lessee ignature � •l5= (.7 Date operty-*Ii t nd I speetron*Si tiformation Utn o vvc) � Property Owner's Name(Last,First)or Company Name 30 6 G 2 j Ave C. C.-) ' tA/ �O S Mailing Address Unit/Apt.# City Sta e Zip 9.0G -7 3 - ' 620 0 �(.) CtIA Cor., Daytime Phone Email Address 30626 2 Aoe S.G.). gee)** �( Lj W4 Inspection Site Address(if different) Unit/Apt.# City State Zip County Electrical Power Company/Serving Utility Deseription'of work being done{Example:adding outlets in the kitchen second floor break area,etc:) d cv , D .i.r- 1-(G#k v P Gi dlJ 'u4"-(e 4-S DEPARTMENT OF COMMUNITY DEVELOPMENT/33325 8TH AVENUE SOUTH/FEDERAL WAY,WA 98003-6325 253-835-2607 www.cityoffederalway.com permitcentercityoffederalway.com Bulletin#080-June 6,2018 Page 2 of 2 k:\Handouts\Property Owner Electrical Work Application