18-104171 , - . Demolition City of Federal Way Permit #:18-104171-00-DE Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: CAMELOT SQUARE MFH SPACE 361 Project Address: 3001 S 288TH ST Parcel Number:042104 9155 Project Description: Demolition of existing manufactured home damaged by fire. Owner Applicant Contractor CAMELOT SQUARE INC JOSE MONTE OPICO OWNER IS CONTRACTOR 3001 S 288TH ST 3001 S 288TH ST UNIT 361 FEDERAL WAY WA 98003-8019 FEDERAL WAY WA 98003 , , ci . Additional Permit Informati Vdoer. PERMIT EXPIRES Wednesda i Mail2019 r Permit Issued on Fridays• ember8 .. I hereby certify that the above information is • - • at the c ction on the above described property and the occupancy and the use will be in a • - with the I , rules and regulations of the State of I Washin r e Ci of I Way. •iti Owner or agent: �• Date: 0 9- 0v - /� J. V. 41k1 Altb i s4pilh ('I 0' THIS CARD IS TO REMAIN ON-SITE Federal Way Construction Inspection Record CITV Of 111/1 r• y INSPECTION REQUESTS:(253)835-3050 PERMIT#: 18 104171 00 Address: 3001 S 288TH ST Space 361 Project: CAMELOT SQUARE INC FEDERAL WAY WA 98003-8019 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 SWM Precon Site Mtg(4400) Q Initial Erosion Control(4365) j 0 Interim Erosion Control(4370) Approved To be done PRIOR to breaking ground Approved By Date By Date L By Date ® Final Erosion Control(4375) 3❑ Final-Building(4050) Approved Approved By Date By Date ❑ Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date ....„4...... RECEIVED PERMIT APPLICATION CITY OF SEP 7 + t' h Fl Way, 8003-6325 Federal Way0 r 2018 PERMIT 253 88C35-2607ENTER + FAX33325 253-835-2609S8AvenueSout+per+mitcenterlederacityoflederWA9alway.com CrrY OF FEDERAL WAY COM^'MUN D PERMIT NUMBER I 8 _. 1 C� - 5 ` TARGET DATE SITE ADDRESS SUITE/UNIT# �I d P, 4F4- 1 ce ecczc 1Jl CSA ?b I PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL# $� COO M3 0 Lt 2 I 0 if _ 9 1 S 5 TYPE OF PERMIT ❑BUILDING 0 PLUMBING 0 MECHANICAL XDEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT CO�,y y 00`QL m ‘AP PROJECT DESCRIPTIONl tmob, o Detailed description of work to ��ecn ak z n-6 c) u oo C�e o ci o b, (t1. be included on this permit only NAME __ _ % PRIMARY PHONE 6 WI M fi53 (pt 52, 1291 PROPERTY OWNER MAILING ADDRESS E-MAIL 300 l< S. _.‘,15r /14 S : c-j al60 (50e1 • s-•2$rt / 361 F,TY r Q Tv)) W . y Bu iA ZIP i ions .�.�-.L ��y OVA_ N EO W Y l r PHONE'7C5'3 MAILING ADDRESS � / E-MAH CONTRACTOR 3 6, 5 • 2— 'j Si # 6/ ' CITY STATE . ZIP FAX A STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# / / NAME _ - PRIMARY PHONE-_ ._ UwVIe r APPLICANT MAILING ADDRESS E-MAIL CITY STATE ZIP FAX PROJECT CONTACT NAME me a s a�a�ei PRIMARY C q y 7 (The individual to receive and MAILING ADDRESS E-MAIL respond to all correspondence concerning this application) CITY STATE ZIP FAX PROJECT FINANCING NAME /` 0 OWNER-FINANCED When value is$5,000 or more MAILING ADDRESS,C AT ,ZIp/-� PHONE (RCW 19.27.095) NYY I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person,including the undersigned,and filed against the city, but only where such cl•im arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to c'4 as a part of this application. (------) SIGNATURE: Adi DATE 69- ii) 5( ...- r PRINT NAME: III a ,) — - Bulletin#100—January 29,2016 Page 1 of 2 k:\Handouts\Permit Application 9/7/2018 Approved Transaction pscleanalr.org Puget Sound Clean Air Agency Single-Family Notification Case #: 201804173 This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspect project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $65.00 Credit Card Transaction # AQOFF9D199F9 Transaction Date 09/07/18 Owner's Name Jose Opico Montes Phone (253) 929-4247 Project Street Address 3001 S 288th Street#361 City Federal Way Zip 98003 Contact Person Jose Montes Phone (253) 929-4247 Mailing Address This project includes a demolition. Demolition Start Date 09/17/18 Completion Date 09/17/18 Demolition will be completed by the home owner I certify that: (1) This is a single-family residence project. The structure is used by one family who owns the property as their domicile. (2)The information I have provided is to the best of my knowledge accurate and complete. (3) I understand the fee for this Notification is nonrefundable. Create Another Notification If you have questions, contact us at asbestos@pscleanair.org or 206.689.4058. COMMUNITY DEVELOPMENT DEPARTMENT 33325 Bch Avenue South Federal Way,WA 98003 CITY OF �� 253-835-2607;Fax 253-835-2609 federal Way www.cityoffederalway.com DEMOLITION PERMIT REQUIREMENTS A demolition permit is required to remove any structure on a subject property. Demolition of separate structures may require separate permits. C�Address of Demolition: 2i / - S ` -7' fq.- ttl E^( , 1436 I TX147- a,1 WA rrO(5,3 '❑ Prior to submitting a demolition permit, the following items must be signed by the respective agency or their approvals attached. Items not applicable to your project should be marked N/A. CI i completed Construction Permit Application form is also required. 1.ASBESTOS ABATEMENT (Provide copy of Notice of Intent from Puget Sound Clean Air Agency 5. ELECTRICITY and co of i spection report by AHERA-certified inspector) CJ eb( Scouvie Jed 6PS_. ity of Federa ay Building Official) (Puget Sound Energy/T c ma Power) 2. FUEL STORAGE TANKS 6. NATURAL GAS ❑ Under grade tank(s)is/are present Y v A o Above grade tank(s)are present ❑Tank(s)has been pumped or removed under South King Fire& (Puget Sound Energy) Rescue permit prior to any dismantling or excavation outh King Fire and Rescue) 7.WATER- Public Source NIA - MH PA-Wg... -S5gssisb 13 3 Li (2 l eopronso.k-ct nIEz6-0-s (Lakehaven Utility District) 3. SEPTIC SYSTEM DECOMISSIONING9kth 5? Ail / 1 8.WATER- Private Well (king County Environmental Services) /VIA A Ning County Environmental Services) 4.SANITARY SEWER Nfk- Nttk PLwn3 ti- c& brr.Prtrz Ta 13E cljt<er•WA)Er—Tal, 'R-gc.opsJ EC,16D (*nog- 'T3uu-D t06. I Pc.r. [3 p 1L.t ' 1`it) (Lakehaven Utility District) r4th ❑ Please Note: Erosion control measures must be in place during the demolition and through completion of the site clean-up. (Applicant) Bulletin#122—March 16,2017 Page 1 of 1 k:\Handouts\Demolition Permit Requirements ASBESTOS NORTHWEST LLC SURVEY REPORT C d"' t 30620IORTHWESTF Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 941 4343 Fax:253 941 4175 Asbestos Northwest, LLC - Survey Report 30620 Pacific Hwy S, #103253.941, Federal Way, WA 98003 .4343 %\• .*,'c. 4 :meq ekr. a trii. 41 M� g �;'.,�, - .`• `-:?cam s, ��. Survey Location: 3001 S 288th St Space #36q Federal Wat WA Prepared for: Jose Montes Date: September 6th, 2018 Asbestos Northwest Batch Number: 201812379 Inspector: Sean Butler (#168124) E-mail: seanb@asbestosnw.com 1 ASBESTOS NORTHWEST LLC SURVEY REPORT ,,„„ ASBESTOS NORTHWEST 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 9414343 Fax:253 9414175 Contents 1. Background Information and Scope of Work 3 2. Building Description 4 Structural System 4 Finishing Materials 4 Mechanical system 4 Electrical system 4 Insulation 4 Roofing 4 Outbuildings 4 3. Material Sampling Information 5 Definitions 5 Survey Methodology 5 4. Asbestos Containing Material 7 5. Conclusions 8 Appendix A—Certifications 9 Appendix B — Building Layout 11 Shed Area North Side 12 Looking to Front 12 Appendix C— Laboratory Report 13 2 ASBESTOS NORTHWEST LLC SURVEY REPORT ASBESTOS edam 'T NORTHWEST 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 9414343 Fax:253 9414175 1 . Background Information and Scope of Work On September 6th, 2018 Asbestos Northwest, LLC conducted a survey of the mobile home located at space #36, in the mobile home park at 3001 S 288th St in Federal Way WA. AHERA-certified building inspectors Sean Butler (#168124) and Dan Lafley (#163509) conducted the survey to determine the presence of Asbestos Containing Materials (ACM's) prior to the demolition of the building to make way for redevelopment. The single wide mobile home appeared to have dated to the 1960's or 1970's and had been extensively fire damaged. The fire marshal had posted signage indicating that the building is unsafe to enter, samples were only taken from the perimeter of the structure. The majority of the building had been entirely consumed by fire, with only the rear portion remaining somewhat intact. There was evidence that the mobile home had undergone some remodel work, such as a press board shed on the side along with a covered parking area, but for the purposes of the survey the home was considered one homogenous area. Due to extensive fire damage few suspect materials were accessible to the inspectors. Photos of the site can be found later in the report. Potential asbestos-containing materials were located and sampled from the perimeter of the building site. See Appendix B for a detailed floor plan with sample locations. Materials were located and sampled following AHERA protocol in 40 CFR 763.86, then analyzed in-house at Asbestos Northwest per 40 CFR 763.86. See section 3 for detailed sampling information. 3 ASBESTOS NORTHWEST LLC SURVEY REPORT ter!' .. , NORTHWEST 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 9414343 Fax:253 9414175 2. Building Description The building was a single wide mobile home dating to the 1960's or 1970's. It had been extensively fire damaged and its original configuration and condition were difficult to determine. In compliance with signage posted by the fire marshal the building was not accessed directly, and samples were taken from the perimeter. Structural System The building was of wood-framed construction and was on a metal chassis. The overall structure of the building appeared to be unaltered although a simple shed and carport roof had been added to one side of the building. Finishing Materials The surviving interior walls of the building appeared to be drywall. No joint compound was visible, seams between panels had trim strips in place instead. Fibrous painted paneling material was also found, likely from the ceilings. Mechanical system A forced air furnace was located somewhere in the home, with galvanized under floor ducting. No suspect wrap or tape materials were visible during the inspection process. Some fiberglass insulation was noted. Electrical system The electrical system was disabled at the time of the inspection. The electrical panel was inaccessible, and visible wiring remnants had rubber insulation. Insulation Visible insulation in the walls and ceilings of the building was all fiberglass. No vermiculite or other suspect insulation products were seen. Roofing The residence had a peaked roof with asphaltic shingle over tar paper. The covered parking area had a roof of rolled asphaltic shingles. Outbuildings There were no outbuildings on site, although there was a covered parking area on the side of the home and a wooden shed to the rear. 4 ASBESTOS NORTHWEST LLC SURVEY REPORT ASBESTOS i NORTHWEST • 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 9414343 Fax:253 9414175 3. Material Sampling Information Asbestos survey work performed by Asbestos Northwest meets inspection regulatory requirements enforced by federal, state, and local agencies, including Asbestos Hazard Emergency Response Act (AHERA), WAC 296-62-077 (WISHA) and 40 CFR Part 61 (NESHAP) and 29 CFR Part 1926.1101 (OSHA) Definitions Homogenous— Materials with the same appearance, texture, color, and which were applied during the same general construction period. Surfacing Material — Material that has been sprayed-on, troweled-on or otherwise applied to surfaces, such as acoustical plaster, texture and joint compound, and fireproofing materials on structural members. Thermal System Insulation — Material applied to pipes, fittings, boilers, breaching, ducts, and other interior structural components to prevent heat loss or gain. Miscellaneous Material — Building materials such as structural components, structural members or fixtures not included in surfacing and thermal insulation. Survey Methodology Before sampling began, inspectors documented the total surveyed area. A sketch of each space was created, and total square footage was roughly measured. The inspectors then determined the extent of each visible homogenous material throughout the survey area. Materials were classified as surfacing, thermal insulation, or miscellaneous material, and friability was assessed according to AHERA specifications. Materials were sampled according to 40 CFR 763.86. Depending on homogeneity, square footage, and material type, the proper number of samples needed to accurately assess the location and extent of asbestos was determined and collected. At the point of collection, samples were placed in an appropriate container and labeled. Location was noted on the building floor plan, and a description of the material was recorded with the label number. Sampling tools were then wiped clean to prevent contamination between samples. Any suspect debris was sealed. The samples were then counted, and their label numbers were recorded on a chain of custody form. The inspector then signed and released the form to the laboratory with the samples. Samples were analyzed in-house at Asbestos Northwest. Below is a list of all materials sampled. Appendix C contains the laboratory report and analytical results for each sample. 5 ASBESTOS ; � ASBESTOS NORTHWEST LLC SURVEY REPORT 44V- NORTHWEST 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 941 4343 Fax:253 9414175 Description Material Type Sample Numbers and Locations Fibrous Paneling Friable Miscellaneous 1- Debris South Side Material Texture on Drywall Friable Surfacing Material 2- Debris South Side Asphaltic Shingle and Non-Friable Tar Paper Miscellaneous Material 3- Debris North Side Rolled Asphaltic Non-Friable Roofing Miscellaneous Material 4- Debris North Side 6 ASBESTOS NORTHWEST LLC SURVEY REPORT ..ASBESTOS NORTHWEST 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 9414343 Fax:253 9414175 4. Asbestos Containing Material A homogenous material is considered ACM (Asbestos Containing Material) if one or more samples of the material are found to have greater than 1% asbestos. Analysis can result in both positive and negative conclusions in materials containing less than 10% asbestos, or materials that have very fine asbestos fibers, have been hand mixed, or have asbestos fibers tightly bound in the matrix; therefore, EPA recommends a minimum of three samples be analyzed by PLM for these types of materials. All materials that were sampled during the inspection were analyzed under PLM, EPA Method 6001R-931116. Laboratory results show that none of the samples taken contained asbestos. ASBESTOS NORTHWEST LLC SURVEY REPORT ASBESTOS ,_ ithivii 1 . NORTHWEST 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 9414343 Fax:253 9414175 5. Conclusions None of the materials sampled contained asbestos. Given the extensive fire damage to the structure large areas were inaccessible and samples could only be taken from the perimeter of the site. Other materials may be uncovered during the demolition process that would require abatement, these should be tested as encountered. The material that contains asbestos must be abated before remodeling may begin. A Certified Asbestos Abatement Contractor must carry out abatement. Different materials require different abatement processes depending on the friability, type of asbestos, and amount of asbestos present. It is important that materials are treated by a Certified Asbestos Abatement Contractor. 8 FA u .:�- O E Co V m Lp N co To LL- 'cr) m v v m In 0 '• Y in .+. ,gyp S31�, N N weJ6wd uolle a y aioge'j f e nioft ieuogeN eq�logiti N . sego enµpall3 1$43 I N �q s+ [£-£C)-6 IOZ 10711011-11 10-170-8102 MINN. 1 'P-WIN(124 A -Thlri, ! wq Zo "(60oz tienuep pewenbrunwwoo Alt-01111-0S!lurol of iejei)walsAs luewa6euew o flyenb�Goleioge'e jo uoperado eg1 pue adoos pauyep e_sof eouejedwoo reorutoal sejegsuowep uopemaiooe srgl rn "90OZ-3ZOL d 031/0SI p.iepuelS reuopewalut peziu5ooai eq Om aauepioxe u!paJ!paJooe si ko;eroger situ srs,AjeuV aagi3 so;sagsy :Joj `uogemalaoy jo adooS a41 uo pajsij 'seoi ues oyroeds 101 wei6ord uopeppaaoy kojeloge7 ke;union reuogeN WI Aq peyperooe sr VISA`Ai;M I -' Pa1 o, DZZ 'psantq;oN so;sagsy 0-£6600Z :3(103*WI dV1AM cnC O ca 5002:9ZOL 4 331/0S1 01 uogempeJooV lo eleo ipa3 f a) A\vi,_ Ua , cc LU V CaLU Q Ce x ® / VI o c i 6oJoug3ej pue spiepue3s jo a}n;�4sui ieuogeN W Q a3Jawwoa Jo ;uewpedea se;els pawn • CL c Q 0 z Ln 0 1— v) W co L/1 a ASBESTOS NORTHWEST LLC SURVEY REPORT ASBESTOS [NORTHWEST • 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 941 4343 Fax:253 9414175 1900 W Nidwrsert,Ste 315 ®® Seattle,WA 98119 1 t C, (268)2854373 Assisemievi This certifies that A^P,_p" Sean T.Butler has satisfactorily completed 4 hours of refresher training as an AHERA Building Inspector to comply with the training requirements of TSCA Title ll,40 CFR 763(AHERA) EPA Provider#1085 Inatruntar Date.Jun 20,2018 Epees in 1 year. Cert.Nun 168124 1900 W.Nickerson,Seattle,WA99119 Ste 315 i i 4 (206)2854373 rr w ar>rrerra1111r This certifies that Awn#i,.<: ,. i Daniel J. Lafley has satisfactorily completed 4 hours of refresher training as an AHERA Building Inspector to comply with the training requirements of TSCA Title ll,40 CFR 763(AHERA) trtetor tate.004,2017 Expires all year. Cert,Num 163509 10 ASBESTOS NORTHWEST LLC SURVEY REPORT E TOSV"'"\ NORTHWEST• ' 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 941 4343 Fax:253 9414175 Appendix B — Building Layout Soot 9 ,)-ge- Settae ,O Petit, WGy ci. es -eras • S4 eek 11 ASBESTOS NORTHWEST LLC SURVEY REPORT ASBESTOS/ NORTHWEST • 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 941 4343 Fax:253 9414175 j ; 1 a • g a its t . fin ill .4...• ' . ... i III 1 44.'i't*:•..4 t -..~ - _ ' ' roi. Ss say 4 :P .:' i s.. #."'4- '''',,e'.'-'i4lf.,-' 't. --, ,.." : ' ' -VC N ° r a ti ! L� Shed Area North Side 1.ti ,,, _ �' S q „ E ' �._ ,olIlliIlle...*'' ..,. V.I.A'` 114,444, 7,----„,.... Looking to Front 12 ASBESTOS NORTHWEST LLC SURVEY REPORT ASBESTOS " NORTHWEST 30620 Pacific Hwy S Suite 103 Federal Way,WA 98003 Tel:253 9414343 Fax:253 9414175 Appendix C — Laboratory Report IIORTHWtEStT + ii Asbestos NW Batch# 201812379 30620 Pacific Hwy S.6103,Federal Way,WA 98003 (253)941-4343 NYLAP Lab Code:200993-0 Bulk Samples Chain of Custody (EPA 60018-93/116) NamelCompa� Jose MontesDate: 9/6/2018,.,.. �_. .__ . . .............................._ Address: Phone: 206 929 4247 Email: Project Manager: Same Project# Project l Location: 3001 S 288th St#360 Federal Way WA Number of Samples 4 Turn around time: 24 # Sample ID Description Location/Comments 1 1 Fibrous Paneling with Paint Debris South Side 2 2 Drywall Paneling Debris South Side 3 3 Asphaltic Shingle and Tar Paper Debris North Side 4 4 Rolled Asphalt Roofing Debris North Side 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Print Sign Company Date Time Sampled by Sean Butler " - Asbestos Northwest 9/6/2018 1:00PM Relinquished by: Delivered by: Sean Butler Asbestos Northwest 9/6/2018 2:00PM Accepted by: Dan Lafley Asbestos Northwest 9/6/2018 2:00PM Analyzed by: Cathy Butler 0141.1 rtt `- Asbestos Northwest 9/6/2018 2:45PM 13 ASBESTOS NORTHWEST LLC SURVEY REPORT ASBESTOS - \ d Way,WA 98003 30620NPacificORHTwyHs WESTeE10S3 TFe Federal Tel:253 941 4343 Fax:253 941 4175 „ASSESTOSiddliiiii !NORTHWEST Ct\\-FWJAP Asbestos Northwest,FIX: TESTiNG NVI AP IASI COM 2.001'13.0 30620 Pacific Hwy S.#103,Federal Way,WA 98003 Ph:(253)941-4343 Fax:(253)941-4175 Batch Number: 201812379 PLM Analysis by EPA Method 600/M4-82-020 and 600/R-93/116 This report must not be used by the client to claim product certification,approval,or endorsement by NVLAP,NIST,or any agency of the U.S.Government, Attn: Date Received: 9/6/2018 Jose Monies Date Analyzed: 9/6/2018 Samples Received: 4 Samples Analyzed: 4 Location: 3001 S 288th St#360 Federal Way WA Client Sample Lab Sample %Non-Asbestos %Asbestos Fibers Layer Description Matrix ID ID Fibers and Type Brown fibrous material 1 Filler,Paint 90%Cellulose None Detected with paint Charred white powdery Binder/filler, 2 1 2%Cellulose None Detected material with paint Paint White powdery material 2 Filler/binder 10%Cellulose None Detected with paper White chalky material Fit lerlbinder, 3 15%Cellulose None Detected with paper Gypsum/binder Black asphaltic material Asphalt/binder, 20%Cellulose, 3 1 None Detected with sand Sand Glass fibers. Black asphaltic fibrous 10%Cellulose, 2 Asphalt/hinder one Detected materialPolyethylene Black asphaltic fibrous 10%Cellulose, 4 Asphalt/binder None Detected material Polyethylene 5%Cellulose, 2 Black asphaltic material Asphalt/binder None Detected Glass fibers ( API Analyzed by:Cathy Butler, Report Page 1 14