Loading...
AG 20-016 - NRC ENVIRONMENTAL SERVICES, INC. RETURN TO: PW ADMIN EXT: 2700 ID#:" CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM 1. ORIGINATING DEPT/DIV: PUBLIC WORKS 2-9-5-L 7 /� 2. ORIGINATING STAFF PERSON: Lza_� + 1 /�1 v Y _(, EXT: G�Z 3. DATE REQ.BY: AS N P 3. TYPE OF DOCUMENT(CHECK ONE): 'CONTRACTOR SELECTION DOCUMENT(E.G.,RFB,RLP, J;Q) ❑ PUBLIC WORKS CONTRACT SMALL OR LIMITED PUBLIC WORKS CONTRACT ❑ PROFESSIONAL SERVICE AGREEMENT * MAINTENANCE AGREEMENT ❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/CDBG ❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT(E.G.BOND RELATED DOCUMENTS) ❑ ORDINANCE ❑ RESOLUTION ❑ CONTRACT AMENDMENT(AG#): ❑ INTERLOCAL ❑ OTHER 4. PROJECT NAME: 2_0 1 p - Z0 ZZ b Y•7- C,&.L r-V 1 Y "Y1UZAA,� n S� r 5. NAME OF CONTRACTOR. I 5 ADDRESS: 4 V1 • '!� tii 1 D 0. \P_ COCA TELEPIF1ONE: dl-31)00 E-MAIL: j_,-�k N C.JDM FAX: SIGNATURENAME: TITLE: }G1krcaiL���C11>" 6. EXHIBITS AND ATTACHMENTS:A SCOPE,WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS/CERTIFICATE ❑ ALL OTHER REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT/AMENDMENTS CFW LICENSE# BL,EXP.12/31/ UBI#C) � EXP. -_2 1 �7 0q 1 L 7. TERM: CC}MMENCEMFNT DATE' �7 _ l� COMPLETION DATE: / _ 1 ,, 1 S. TOTAL COMPENSATION:$ I b-0 'r , -I1-�r`�'bk�'NCLUDE EXPENSES AND SALES TAX,IF ANY) (IF CALCULATED ON HOURLY LABOR CHARM,-ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES) REIMBURSABLE EXPENSE: AYES NO IF YES,MAXIMUM DOLLAR AMOUNT: $_ IS SALES TAX OWED: ❑YES NO IF YES,$ PAID BY: ❑CONTRACTOR ❑CITY RETAINAGE: RETAINAGE AMOUNT: RETAINAGE AGREEMENT(SEE CONTRACT) OR ❑RETAINAGE BOND PROVIDED PURCHASING: PLEASE CHARGE TO: 30 r 3,D 0 I 1 r EA 14~ 3``L4% IL 9. DOCUMENT/CONTRACT REVIEW INITIAL/DATE REVIEWED INITIAL/DATE APPROVED �PROJF'TN1ANAGER 1-2,11 14/41 tofjcfI I% Di\I;1 IN VIA'\AGER '"- • ' t .i I� i DI is ,_1-)-1)1 R F[ I-OR I ❑ RisK MANAGEMENT (IFAPPLIC:ABLE) ,X LAW DEPT tK I$ Dc, 201 1G M.c20i` 10. COUNCIL APPROVAL(IF APPLICABLE) SCHEDULED COMMITTEE DATE: COMMITTEE APPROVAL DATE: m-�— QXGe� }� - �N f SCHEDULED COUNCIL DATE: COUNCIL APPROVAL DATE: 11. CONTRACT SIGNATURE ROUTING / ❑ SENT TO VENDOR/CONTRACTOR DATE SENT. I 1 Ce/t°s Gm� DATE REC'D: a) 2-L ❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE,LICENSES,EXHIBITS ❑ CREATE ELECTRONIC REMINDERINOTIFICATION FOR 1 MONTH PRIOR TO EXPIRATION DATE (INCLUDE DEPT.SUPPORT STAFF IF NECESSARY AND FEEL FREE TO SET NOTIFICATION MORE THAN A MONTH IN ADVANCE IF COUNCIL APPROVAL IS NEEDED.) INITIAL/DATE SIGNED ❑ FINANCE DEPARTMENT ❑ LAW DEPT I lI Zl�t7ZG_ ❑ SIGNATORY(MAYOR OR DIRECTOR) } ❑ CITY CLERK ❑ ASSIGNED AG# la. Ido ❑ SIGNED COPY RETURNED `p� DATE SENT: ❑RETURN ONE ORIGINAf , �J COMMENTS: pry &.U" � �} fJ EXECUTE ORiGINALS� 1� �� V 1 L. V C� S CCt=�'�� S. vJ i S c_ D Ail �•s 1 A16Aq = All s in Fyyw, reAAeAw. LIMITED PUBLIC WORKS CONTRACT FOR 2019-2022 ON-CALL ENVIRONMENTAL RESPONSE & DISPOSAL SERVICES This limited public works contract ("Contract") is dated effective this 3 �_ day of t1a� 2019 and is made by and between the City of Federal Way, a Washington municipal corporation ("City" or "Owner"), and NRC Environmental Services Inc., a Washington Corporation ("Contractor"). A. The City desires to retain an independent contractor to furnish all labor and materials necessary to perform work related to environmental response and disposal services, as needed, in Federal Way, Washington ("Property"); and B. The Contractor has the requisite skill and necessary experience to perform such work. NOW, THEREFORE, the Parties ("Parties") agree to the following terms and conditions: 1. SERVICES BY CONTRACTOR 1.1 Description of Work. Contractor shall perform all work and furnish all tools, materials, supplies, equipment, labor and other items incidental thereto necessary for the construction and completion of the work, more particularly described as on-call environmental response and disposal services, in Exhibit "A" attached hereto and incorporated by this reference, ("Work"), and in accordance with and as described in the Contract Documents, which include without limitation, this Contract, Unit Price List attached as Exhibit `B," Contract Change Order Agreement attached as Exhibit "C," Notice to Labor Unions attached as Exhibit "D," Certificate(s) of Insurance Form attached hereto as Exhibit "E," Prevailing Wage Rates attached as Exhibit "F," Title VI Assurances attached hereto as Exhibit "G," and all other Appendices attached hereto and incorporated by this reference, (collectively the "Contract Documents"), which Work shall be completed to the City's satisfaction, within the time period prescribed by the City and pursuant to the direction of the Mayor or his or her designee. 1.2 Completion Date. The Work shall be commenced within five (5) days of receipt by the Contractor of the City's Notice to Proceed. The Work shall be completed on an on-call basis for environmental response and disposal services. The Contract term may not exceed three (3) years, with the City having the option of extending or renewing the Contract for one (1) additional year. 1.3 Performance Standard. Contractor shall perform the Work in a manner consistent with accepted practices for other properly licensed contractors, performed to the City's satisfaction, within the time period prescribed by the City. 1.4 Compliance with Laws. Contractor shall perform the Work in accordance with all applicable federal, state and City laws, including, but not limited to all City ordinances, resolutions, standards or policies, as now existing or hereafter adopted or amended, and obtain all necessary permits and pay all permits, inspection or other fees, at its sole cost and expense. 1 12/2019 1.5 Change Orders. The City may, at any time, without notice to sureties, order changes within the scope of the Work. Contractor agrees to fully perform any such alterations or additions to the Work. All such change orders shall be in the form of the Contract Change Order Agreement attached hereto as Exhibit "C," which shall be signed by both the Contractor and the City, shall specifically state the change of the Work,the completion date for such changed Work, and any increase or decrease in the compensation to be paid to Contractor as a result of such change in the Work. Oral change orders shall not be binding upon the City unless confirmed in writing by the City. If any change hereunder causes an increase or decrease in the Contractor's cost of, or time required for, the performance or any part of the Work under this Contract, an equitable adjustment will be made and the Contract modified in writing accordingly. If the Contractor intends to assert a claim for an equitable adjustment hereunder, it shall, within five (5) days after receipt of a written change order from the City or after giving the City the written notice required above, as the case may be, submit to the City a written statement setting forth the general nature and monetary extent of such claim; provided the City, in its sole discretion, may extend such five (5) day submittal period upon request by the Contractor. The Contractor shall supply such supporting documents and analysis for the claims as the City may require determining if the claims and costs have merit. No claim will be allowed for any costs incurred more than five (5) days before the Contractor gives written notice as required. No claim by the Contractor for an equitable adjustment hereunder will be allowed if asserted after final payment under this Contract. 1.6 Utility Location. Contractor is responsible for locating any underground utilities affected by the Work and is deemed to be an excavator for purposes of Chapter 19.122 RCW, as amended. Contractor shall be responsible for compliance with Chapter 19.122 RCW, including utilization of the "one call" locator system before commencing any excavation activities. 1.7 Air Environment. Contractor shall fully cover any and all loads of loose construction materials including without limitation, sand, dirt, gravel, asphalt, excavated materials, construction debris, etc., to protect said materials from air exposure and to minimize emission of airborne particles to the ambient air environment within the City of Federal Way. 2. TERM This Contract shall commence on the effective date of this Contract and shall be executed for an initial term not to exceed three (3) years, with the City having the option of extending or renewing the Contract for one (1) additional year per RCW 35.23.352(13)(c). The Contract is subject to renewal at the end of each calendar year through 2022 by agreement of both parties, and the expiration of all warranties contained in the Contract Documents ("Term"). The City must notify the Contractor no later than September 15th of each calendar year of their intent to continue with these services for the following year. The Contractor must notify the City within ten (10) calendar days of this notification whether or not they agree to continue providing services for the following calendar year. 2 12/2019 3. WARRANTY 3.1 Requisite Skill. The Contractor warrants that it has the requisite skill to complete the Work, and is appropriately accredited and licensed by all applicable agencies and governmental entities, including, but not limited to being registered to do business in the City of Federal Way by obtaining a City of Federal Way business registration. Contractor represents that it has visited the site and is familiar with all of the plans and specifications in connection with the completion of the Work. 4. COMPENSATION 4.1 Total Compensation. In consideration of the Contractor performing the Work, the City agrees to pay the Contractor an amount not to exceed twelve thousand and 00/100 Dollars ($12,000.00) per year. 4.2 Price List. The City shall compensate the Contractor for the Work performed in accordance with the Unit Price List attached as Exhibit "B". The rates set forth in Exhibit B shall be firm from the date of execution until Contractor provides written notice of a rate change. Contractor's rates are usually updated on an annual basis on or around February 18th. The rate change will take effect thirty (30) calendar days after Contractor provides written notice of the rate change to the City. 4.3 Contractor Responsible for Taxes. The Contractor shall be solely responsible for the payment of any taxes imposed by any lawful jurisdiction as a result of the performance and payment of this Contract. 4.4 Nonpayment. The City shall have the right to withhold payment to the Contractor for any of the Work not completed in a satisfactory manner, in the City's sole discretion, which shall be withheld until such time as Contractor modifies or repairs the Work so that the Work is acceptable to the City. 4.5 Method of Payment. Payment by the City for the Work will only be made after the Work has been completed, a voucher or invoice is submitted in the form specified by the City, documentation associated with disposal of materials is provided, if applicable, and such invoice is approved by the appropriate City representative. Payment shall be made within thirty (30) days of receipt of such invoice or voucher unless otherwise set forth in the Bid Form. The Contractor's acceptance of such payment for the Work shall constitute full compensation for the performance of the Work. Invoices shall be submitted, in duplicate, to: City of Federal Way ATTN: Accounts Payable 33325 8th Avenue South Federal Way, WA 98003-6325 3 12/2019 5. E[LIAI ()PPORTUNITY EMPLOYER In all Contractor services, programs or activities, and all Contractor hiring and employment made possible by or resulting from this Contract, there shall be no discrimination by Contractor or by Contractor's employees, agents, subcontractors or representatives against any person because of sex, age (except minimum age and retirement provisions), race, color, creed, national origin, marital status or the presence of any disability, including sensory, mental or physical handicaps, unless based upon a bona fide occupational qualification in relationship to hiring and employment. This requirement shall apply, but not be limited to the following: employment, advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor shall comply with and shall not violate any of the terms of Chapter 49.60 RCW, Title VI of the Civil Rights Act of 1964, the Americans With Disabilities Act, Section 504 of the Rehabilitation Act of 1973, 49 CFR Part 21, 21.5 and 26, or any other applicable federal, state, or local law or regulation regarding non- discrimination. Contractor shall post a notice to Labor Unions or other employment organizations, attached hereto as Exhibit "D," as required by Section 202 of Executive Order 11246. Any material violation of this provision shall be grounds for termination of this Contract by the City and, in the case of the Contractor's breach, may result in ineligibility for further City agreements. If this project involves federal funds including USDOT funds administered by WSDOT, the contractor agrees to the clauses contained in Exhibit G. 6. INDEPENDENT CONTRACTOR/CONFLICT OF INTEREST It is the intention and understanding of the Parties that the Contractor shall be an independent contractor and that the City shall be neither liable nor obligated to pay Contractor sick leave, vacation pay or any other benefit of employment, nor to pay any social security or other tax which may arise as an incident of employment. The Contractor shall pay all income and other taxes as due. Industrial or any other insurance purchased for the benefit of the City, regardless of whether such may provide a secondary or incidental benefit to the Contractor, shall not be deemed to convert this Contract to an employment contract. It is recognized that Contractor may or will be performing work during the Term for other parties; provided, however, that such performance of other work shall not conflict with or interfere with the Contractor's ability to perform the Work. Contractor agrees to resolve any such conflicts of interest in favor of the City. 7. TERMINATION Prior to the expiration of the Term, this Contract may be terminated immediately, with or without cause by the City. 8. INDEMNIFICATION 8.1 Contractor Indemnification. The Contractor agrees to indemnify, defend and hold the City, its elected officials, officers, employees, agents, and volunteers harmless from any and all claims, demands, losses, actions and liabilities (including costs and all attorney fees) to or by any and all persons or entities, including, without limitation, their respective agents, licensees, or 4 12/2019 representatives, arising from, resulting from, or connected with this Contract to the extent caused by the negligent acts, errors or omissions of the Contractor, its partners, shareholders, agents, employees, or by the Contractor's breach of this Contract. Contractor waives any immunity that may be granted to it under the Washington State Industrial Insurance Act, Title 51 RCW. Contractor's indemnification shall not be limited in any way by any limitation on the amount of damages, compensation or benefits payable to or by any third party under workers' compensation acts, disability benefit acts or any other benefits acts or programs. 8.2 City Indemnification. The City agrees to indemnify, defend and hold the Contractor, its officers, directors, shareholders, partners, employees, and agents harmless from any and all claims, demands, losses, actions and liabilities (including costs and attorney fees) to or by any and all persons or entities, including without limitation, their respective agents, licensees, or representatives, arising from, resulting from or connected with this Contract to the extent solely caused by the negligent acts, errors, or omissions of the City, its employees or agents. 8.3 Survival. The provisions of this Section shall survive the expiration or termination of this Contract with respect to any event occurring prior to such expiration or termination. 9. INSURANCE 9.1 Minimum Limits. The Contractor agrees to carry as a minimum, the following insurance, in such forms and with such carriers who have a rating, which is satisfactory to the City: (1) Workers' compensation and employer's liability insurance in amounts sufficient pursuant to the laws of the State of Washington; (2) Commercial general liability insurance with combined single limits of liability not less than $2,000,000 for bodily injury, including personal injury or death, products liability and property damage. (3) Automobile liability insurance with combined single limits of liability not less than $1,000,000 for bodily injury, including personal injury or death and property damage. (4) If any structures are involved in the Contract, the Contractor shall maintain an "All Risk Builder's Risk 2 form at all times in an amount no less than the value of the structure until final acceptance of the project by the City. 9.2 Endorsements. Each insurance policy shall contain, or be endorsed to contain, the following provisions: (1) The City, its officers, officials, employees, volunteers and agents shall each be named as additional insured. 5 12/2019 (2) Coverage may not be terminated or reduced in limits except after thirty (30) days prior written notice to the City, except for non-payment of the premium for which ten (10) days prior written notice will be provided. (3) Coverage shall be primary insurance as respects the City, its officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officials, employees or volunteers shall be in excess of Contractor's insurance. (4) Coverage shall.apply to each insured separately against whom claim is made or suit is brought. (5) Coverage shall be written on an "occurrence" form as opposed to a"claims made" or"claims paid" form. 9.3 Verification. Contractor shall furnish the City with certificates of insurance evidencing the coverage required by this Section, attached hereto as Exhibit "D" and incorporated by this reference. The City reserves the right to require complete certified copies of all required insurance policies, at any time. 9.4 Subcontractors. Contractors shall include all subcontractors as additional insured under its policies or shall furnish separate certificates for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein. 9.5 Deductibles and Self Insured Retentions. Any deductibles or self-insured retentions must be disclosed by Contractor and approved in writing by the City. At the option of the City, Contractor shall either reduce or eliminate such deductibles or self-insured retentions or procure a bond guaranteeing payment for any amounts not covered by the insurance by reason of such deductibles or self-insured retentions. 9.6 Asbestos Abatement or Hazardous Materials. If asbestos abatement or hazardous materials work is performed, Contractor shall review coverage with the City's Risk Manager and provide scope and limits of coverage that are appropriate for the scope of Work and are satisfactory to the City. Contractor shall not commence any Work until its coverage has been approved by the Risk Manager. 9.7 Termination. The Contractor's failure to provide the insurance coverage required by this Section shall be deemed to constitute non-acceptance of this Contract by the Contractor and the City may then award this Contract to the next lower bidder. The provisions of this Section shall survive the expiration or termination of this Contract with respect to any event occurring prior to such expiration or termination. 10. SAFETY Contractor shall take all necessary precautions for the safety of employees on the work site and shall comply with all applicable provisions of federal, state and municipal safety and 6 12/2019 health laws and codes, including without limitation, all OSHA/WISHA requirements, Safety and Health Standards for Construction Work (Chapter 296-155 WAC), General Safety and Health Standards (Chapter 296-24 WAC), and General Occupational Health Standards (Chapter 296-62 WAC). Contractor shall erect and properly maintain, at all times, all necessary guards, barricades, signals and other safeguards at all unsafe places at or near the Work for the protection of its employees and the public, safe passageways at all road crossings, crosswalks, street intersections, post danger signs warning against known or unusual hazards and do all other things necessary to prevent accident or loss of any kind. Contractor shall protect from damage all water, sewer, gas, steam or other pipes or conduits, and all hydrants and all other property that is likely to become displaced or damaged by the execution of the Work. The Contractor shall, at its own expense, secure and maintain a safe storage place for its materials and equipment and is solely responsible for the same. 11. PREVAILING WAGES 11.1 Wages of Employees. This Contract is subject to the minimum wage requirements of Chapter 39.12 of the Revised Code of Washington, as now existing or hereafter amended or supplemented. In the payment of hourly wages and fringe benefits to be paid to any of Contractor's laborers, work-persons and/or mechanics, Contractor shall not pay less than the "prevailing rate of wage" for an hour's work in the same trade or occupation in the locality within the State of Washington where such labor is performed, as determined by the Industrial Statistician of the Department of Labor and Industries of the State of Washington, which "prevailing rates of wage" are attached hereto as Exhibit "F" and incorporated herein by this reference. Prevailing wages paid pursuant to this Agreement shall be the prevailing wage rates, which are in effect on the date when the bids, proposals, or quotes were required to be submitted to the City. 11.2 Exemptions to Prevailing Wage. The prevailing wage requirements of Chapter 39.12 RCW, and as required in this Contract do not apply to: (1) Sole owners and their spouses; (2) Any partner who owns at least 30% of a partnership; and (3) The President, Vice President and Treasurer of a corporation if each one owns at least 30% of the corporation. 11.3 P e1L0 arti i7 ti h'cqu i rements. Contractor shall comply with all reporting requirements of the Department of Labor and Industries of the State of Washington. Upon the execution of this Contract, Contractor shall complete and file a Statement of Intent to Pay Prevailing Wages with the Department of Labor and Industries. Upon completion of the Work, Contractor shall complete and file an Affidavit of Wages Paid with the Department of Labor and Industries. Contractor shall deliver copies of both the Statement of Intent to Pay Prevailing Wages and the Affidavit of Wages Paid, certified by the Department of Labor and Industries, to the City. 7 12/2019 11.4 Disputes. In the event any dispute arises as to what are the prevailing rates of wages for work of a similar nature and such dispute cannot be resolved by the City and the Contractor, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries of the State of Washington and the decision therein shall be final and conclusive and binding on all parties involved in the dispute. 12. FAILURE TO PAY SUBCONTRACTORS In the event the Contractor shall fail to pay any subcontractors or laborers, or fail to pay for any materials or any insurance premiums, the City may terminate this Contract and/or the City may withhold from the money which may be due the Contractor an amount necessary for the payment of such subcontractors, laborers, materials or insurance premiums. 13. OWNERSHIP OF DOCUMENTS All originals and copies of work product, including plans, sketches, layouts, designs, design specifications, records, files computer disks, magnetic media, all finished or unfinished documents or material which may be produced or modified by Contractor while performing the Work shall become the property of the City and shall be delivered to the City at its request. 14. CONFIDENTIALITY Any records, reports, information, data or other documents or materials given to or prepared or assembled by the Contractor under this Contract will be kept as confidential and shall not be made available to any individual or organization by the Contractor without prior written approval of the City. 15. BOOKS AND RECORDS The Contractor agrees to maintain books, records, and documents which sufficiently and properly reflect all direct and indirect costs related to the performance of this Contract and such accounting procedures and practices as may be deemed necessary by the City to assure proper accounting of all funds paid pursuant to this Contract. These records shall be subject at all reasonable times to inspection, review or audit by the City, its authorized representative, the State Auditor, or other governmental officials authorized by law to monitor this Contract. 16. CLEAN UP At any time ordered by the City and immediately after completion of the Work, the Contractor, shall, at its own expense, clean up and remove all refuse and unused materials of any kind resulting from the Work. In the event the Contractor fails to perform the necessary clean up, the City may, but in no event is it obligated to, perform the necessary clean up and the costs thereof shall be immediately paid by the Contractor to the City and/or the City may deduct its costs from any remaining payments due to the Contractor. 8 12/2019 17. CONTRACTOR AND SUBCON 1`1t;kCTOR RESPONSIBILITY: 17.1 Contractor Verification. The Contractor verifies that it has a certificate of registration with the State of Washington; has a current state unified business identifier number; is not disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3); has industrial insurance as required by Title 51 RCW, if applicable; has an employment security department number as required in Title 50 RCW, if applicable; has a state excise tax registration number as required in Title 82 RCW, if applicable; possesses a valid electrical contractor license as required by chapter 19.28 RCW, if applicable; and possesses an elevator contractor license as required by chapter 70.87 RCW, if applicable. 17.2 Subcontractor Contracts. The Contractor shall include the language of this section in each of its first-tier subcontracts, and shall require each of its subcontractors to include the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. Upon request of the Owner, the Contractor shall promptly provide documentation to the Owner demonstrating that the subcontractor meets the subcontractor responsibility criteria below. The requirements of this section apply to all subcontractors regardless of tier. 17.3 Subcontractor Verification. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility criteria: Have a current certificate of registration in compliance with chapter 18.27 RCW, which must have been in effect at the time of subcontract bid submittal; Have a current Washington Unified Business Identifier (UBI) number; Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3); Have Industrial Insurance (workers' compensation) coverage for the subcontractor's employees working in Washington, as required in Title 51 RCW, if applicable; A Washington Employment Security Department number, as required in Title 50 RCW, if applicable; A Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW, if applicable; An electrical contractor license, if required by Chapter 19.28 RCW, if applicable; An elevator contractor license, if required by Chapter 70.87 RCW. 18. GENERAL PROVISIONS 18.1 Entire Contract. The Contract Documents contain all of the agreements of the Parties with respect to any matter covered or mentioned in this Contract and no prior agreements or understandings pertaining to any such matters shall be effective for any purpose. 18.2 Modification. No provisions of this Contract, including this provision, may be amended or added to except by agreement in writing signed by the Parties or their respective successors in interest. 18.3 Full Force aml Effect. Any provision of this Contract, which is declared invalid, void or illegal, shall in no way affect, impair, or invalidate any other provision hereof and such other provisions shall remain in full force and effect. 9 12/2019 18.4 Assignment. The Contractor shall not transfer or assign, in whole or in part, any or all of its obligations and rights hereunder without the prior written consent of the City. In the event the City consents to any such assignment or transfer, such consent shall in no way release the Contractor from any of its obligations or liabilities under this Contract. 18.5 Successors in Interest. Subject to the preceding Subsection, this Contract shall be binding upon and inure to the benefit of the Parties' successors in interest, heirs and assigns. 18.6 Attorney Fees. In the event the City or the Contractor defaults on the performance of any terms in this Contract, and the Contractor or City places the enforcement of the Contract or any part thereof, or the collection of any monies due, or to become due hereunder, or recovery of possession of any belongings, in the hands of an attorney, or file suit upon the same, each Party shall pay all its own attorneys' fees, costs and expenses. The venue for any dispute related to this Contract shall be King County, Washington. 18.7 No Waiver. Failure of the City to declare any breach or default immediately upon occurrence thereof, or delay in taking any action in connection with, shall not waive such breach or default. Failure of the City to declare one breach or default does not act as a waiver of the City's right to declare another breach or default. 18.8 Governing. This Contract shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington. 18.9 Authority. Each individual executing this Contract on behalf of the City and Contractor represents and warrants that such individuals are duly authorized to execute and deliver this Contract on behalf of the Contractor or City. 18.10 Notices. Any notices required to be given by the City to Contractor or by the Contractor to the City shall be delivered to the Parties at the addresses set forth below. Any notices may be delivered personally to the addressee of the notice or may be deposited in the United States mail, postage prepaid, to the address set forth herein. Any notice so posted in the United States mail shall be deemed received three (3) days after the date of mailing. 18.11 Captions. The respective captions of the Sections of this Contract are inserted for convenience of reference only and shall not be deemed to modify or otherwise affect in any respect any of the provisions of this Contract. 18.12 Performance. Time is of the essence of this Contract and each and all of its provisions in which performance is a factor. Adherence to completion dates is essential to the Contractor's performance of this Contract. 18.13 Compliance with Ethics Code. If a violation of the City's Ethics Resolution No. 91-54, as amended, occurs as a result of the formation and/or performance of this Contract, this Contract may be rendered null and void, at the City's option. 10 12/2019 18.14 Cotltlicting Provisions. In the event of a conflict between the terms and provisions of any of the Contract Documents, the Mayor or his or her designee shall issue an interpretation of the controlling document, which interpretation shall be final and binding. DATED the day and year set forth above. [Signature Block to Follow] 11 12/2019 CITY OF FEDERAL WAY: J' errell, Mayor 325 8th Avenue South Federal Way, WA 98003-6325 APPROVED AS TO FORM: ATTEST: E3�� a,,� •r I ( �LV1UVFVV%_1 &4iK J. Ryan Call, City Attorney S h nie Courtney, C C, ity Clerk NRC ENVIR S INC.: By: Its: ? ' .STV (Address) t -, (Phone) STATE OF WASHINGTON ) ss. COUNTY OF 4' 11 On this day personally appeared before me QdXrtJ06n1f_, to me known to be the i of 1+_C -L .that executed the oregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he/she was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation. GIVEN my hand and official seal this j( day of TG LnLACUVw , 20.k •�a e. = (typed/printed name of notary) �•NOTARY PUSL1C - Notary Public in and for the tat of Washington. COMM.E]LPlRES • _ 0 My commission expires • AUG.03,202 • • • i F \\ 12 R�o F�,�AH`��t�*y` 12/2019 EXHIBIT A SCOPE OF WORK The Contractor shall provide necessary on-call environmental response and disposal services in the event that polluting material (hazardous or non-hazardous) impacts (or has the potential to impact) the City's municipal separate storm sewer system, local surface waters or groundwater to the extent that a contracted on-call emergency response is required. The Contractor shall provide environmental response within one hour of notification by the Surface Water Manager or representative during normal City Hall business hours of 8:00 a.m. to 5:00 p.m. and within two hours of notification outside of normal business hours. Services are unique to each event; however, activities for environmental response may include: A. The use of absorbent or other diking materials to contain a spill on the ground and prevent it from spreading and/or reaching the nearest storm drain. B. Vactoring of catch basins, retention/detention tanks. C. Set-up and take down of minor traffic control and/or barricades to divert unauthorized people from entering contaminated areas. Major traffic control beyond cones, signs and an arrow board shall be supplied by City personnel at the request of the service provider. D. Pick-up, profile screening/testing, storage, and disposal of unidentified material contained within sealed or unsealed buckets or drums. Containers are anticipated to be five (5) gallon buckets up to fifty-five (55) gallon drums. E. Proper disposal of any and all waste associated with cleanup services. F. Disposal shall be in accordance with all local, State, and Federal law. G. All required regulatory reporting associated with hazardous waste disposal. 13 12/2019 EXHIBIT B UNIT PRICE LIST (SEE ATTACHED) 14 12/2019 Exhibit B City of Federal Way PENCE LIST Effective February 18, 2019 Personnel........................................... ...... .....................................................•----------•--------- ....................2 . Personnel...............................................................,............___................................................2 PersonnelTerms.............................- .......................................... ..................................... ........2 Equipment..................................... .............. ..................•-••..................-•-..........-•-•--.3-g Boom.................................................................................. .........................................................3 RecoveryVessels....................---.........---....................................................................,...............3 PortableRecovery...........................................................................................:.:..::.....................3 SupportVessels.............................................................................................. ..... TemporaryStorage........................-............................................................................................ Excavation...................................................................................................................................4 Trailers.................................................... ................................................. ..........................4 Trucks..........................................................................................................................................5 VacuumTrucks/Trailers...............................................................................• ............•..............5 Vehicles.......................................................................................................................................5 Blowers/Compressors................... ............................................................................ .......5 PressureWashers.......................................................................................................................6 Pumps......................................................................................................... .....6 Hoses/Pipes/Fittings....................................................................................•--••••••......................6 Support........................................................................................................................................7 Communications.........................................................................................................................8 Safety.......................................................................... ................... .........•-•.....•••.......................8 Dispersants/Aircraft...........____.................____,......................... .........................................9 EquipmentTerms..........................................................._..._.-----------•. •••..................9 Materials&Supplies.......................................... .........................,....................................1(}-12 Bags/Sheeting...........................................................................................................................10 Cleaners....................................................................................................................................1 Q Containers.................................................................................................................................1 Q Safety.......................................................................................................................................10 Sorbents........................................................,........._.............................._...._........................_....11 Miscellaneous ...................................................................................................................... _.11 Materialand Supplies Terms....................................................................................................12 OSRO Client Training and Drill Rates.......................................................................................12 General Price List Terms: Customers request for NRC to perform services constitutes an agreement to pay for those services under the Personnel,Equipment and Material Terms of this Price List,regardless of any estimates provided by NRC.Charges will be based on the most current published Price List.An Energy,Security,Insurance and Compliance fee of 9.5%will be applied to total invoice excluding taxes,state and local fees.Client is responsible to pay all tax(es),(e.g.sales,use,customs duties,or similar tax,import fees) which NRC(or its subcontractors)are obligated to pay as a result of the services provided or which NRC is required to collect,in association with any and all incidents.Rates are based upon net 10 payment terms unless otherwise agreed by prior written contract with NRC.Balances outstanding more than ten(10)days after the invoice date shall be deemed delinquent and shall earn interest at the rate of 1.5%per month.Customers without a pre-existing NRC contract are subject to a minimum charge of$5,000.00 to be paid at time of call out for emergency response services and any charges for services estimated to exceed the minimum are also payable in advance.All prices are in U.S.dollars.Payments made using credit cards(VISA,MASTERCARD,AMEX)shall incur an additional processing fee of 3%. Prices and equipment are subject to regional availability,when equipment is not available,then equipment rental cost+20%shall apply.Additional Price List terms for OSRO Services: NRC resources responding on behalf of a party which is not a"NRC Client in good standing",will be charged a premium of two hundred fifty percent(250°/x)over and above published rates.NRC resources deployed to areas outside of the contractual Area of Service will be subject to a thirty percent(30%)surcharge. Equipment on standby will be charged at seventy five percent(75%)of Price List rates(excludes Oil Spill Response Vessels&Barges). 24-Hour Emergency Response: 1 -800-899-4672 PERSONNEL 17"?N1# DESCRIPTION HOURLY RA TE IC Incident Commander 210 RM Emergency Response Manager 184 SP Senior Project Manager 152 CH Certified Industrial Hygienist 223 PM Project Manager 130 TR Trainer 140 SU Superintendent 107 AM Assistant Project Manager(Operations, Planning, Logistics, Finance) 104 IS Information Systems Technician 104 HS Health&Safety 130 SA Senior Accountant 96 SM Support Manager(Purchasing, Communications,Transportation, Decon) 90 PS Project Scientist/Field Chemist 98 PR Purchaser/Subcontracts Administrator 74 AS Administrative Support/Accountant 57 FS Field Supervisor 95 MC Mechanic/Welder 79 LO Licensed Vessel Operator 112 VO Vessel Operator 85 DH Deckhand 67 BT Bio-Hazard Field Technician 95 MT Marine Technician 74 EO Equipment Operator 80 CD Certified Driver 98 DR Driver(Commercial) 76 SF Site Foreman 78 RT Confined Space/Rescue Technician 75 TE Technician—HAZWOPER 65 RC Resource Coordinator(Dispatch,Warehouse, Logistics) 65 BA ER Spill Bill/Analyst 70 Personnel Terms: 1. Minimum call out is 4 hours per person,except for projects over 50 miles from office location which requires 8-hour daily minimum. 2. All Personnel rates are subject to the following: a)Weekdays: 0700 to 1500 hours charged at Straight Time(ST=Hourly Rate);1500 to 1900 hours charged at Overtime(OT=1'/3 times the Hourly Rate);1900 to 0700 hours charged at Double Time(DT=2 times the Hourly Rate). Changes to start times for Weekday ST,OT and DT may be requested by Client and may be approved by NRC on a case-by-case basis for longer projects. b)Saturday: First 8 hours charged at OT;hours over first 8 hours charged at DT. c)Sundays and Holidays: All time charged at DT. The following are included holidays(on day as observed): New Years Day,Presidents Day, Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Day after Thanksgiving and Christmas Day. Other holidays may apply when employing certain union personnel,including but not limited to: Martin Luther King,Jr.Day,Cesar Chavez's Birthday,Veterans Day,day before Christmas and day after Christmas. d)ST,OT and DT rates are applied per a)—c)above regardless of the number of hours worked for any Client on any particular day. Rates for hours subsequent to a break of less than 8 hours are charged at the appropriate OT or DT rate continuous to hours prior to the break. e)All time for international projects charged at 150%times rates per a)-d)above. f)All time for providing expert testimony in any court,deposition or hearing,etc.including preparation and travel time,charged at DT. 3. All project specific personnel,including accounting,administrative,personnel support,logistics and management,whether on site,at NRC offices,or at support locations,are chargeable. All personnel are charged according to the above rates,regardless of full-time,part-time or third party labor source status,unless provided as part of a specified subcontracted service. Surcharges apply for remote sites and prevailing-wage projects. Personnel charged per their standard category rates for participation in any activity provided on behalf of the Customer including depositions,interviews,document preparation,etc. 4. Time charges begin with equipment and personnel mobilization activities and terminate at the conclusion of the services,including transportation of equipment and personnel back to operations centers and any necessary demobilization activities.Personnel time is charged in half-hour increments for all personnel. All hourly rates will be charged Portal-to-Portal from the location of personnel when dispatched,including but not limited to NRC office,personnel home,hotel or other jobsite as applicable. Personnel on standby for Customer will be charged at 8 hours per 24- hour period. 5. Transportation and any incidental costs for all emergency response personnel,both on site,at support locations and traveling to and from the site or support locations,are charged at cost plus 20%. Per Diem charges for food in metropolitan areas are$75.00 per person per day. Non- premium area per diem rates for lodging are$150.00 per person per day,unless actual costs incurred are greater,in which case charges will be billed at cost plus 20%. In lieu of per diem,marine personnel assigned to vessels will be billed a daily"rack&meal"charge of$25.00 per rack and $25.00 per meal,per day. The above"rack&meal"charge will also apply to non-NRC personnel assigned to a vessel. Rates for premium areas and remote sites to be determined by NRC at time of service. NRC Price List February 18,2019 Page 2 of 12 EQUIPMENT G4 RY ITEM# DESCRIPTIO% UNIT RATE BOOM AND 1001 Anchor Gear Each/Day 34 ACCESSORIES 1002 Boom Mooring Light Each/Day 15 1012 Boom Vane Each/Day 255 1003 Contractor Boom, up to 21" Ft/Day 2 1004 Petro Barrier, up to 24" Ft/Day 3 1005 Ocean Boom, up to 42" Ft/Day 7 1007 Hydro-Boom System (boom, pumps, power pack, reel) Day 3,091 1008 American Fire Boom (500'/system minimum) Day 3,091 1009 Oil Boom Inflator/Blowers Day 155 1010 Hull Magnets Each/Day 32 1011 Dual-Roller Boom Handler Day 335 RECOVERY 2025 NRC OSRV up to 126'(includes Master and installed skimmers) Day 12,469 VESSELS 2026 NRC Recovery,46'Catamaran w/Disk Skimmer Day 5,151 2003 Belt Skimmer Vessel, JBF DIP 3001 Hour 379 2004 Belt Skimmer Vessel, Marco I C Hour 406 PORTABLE 2002 Belt Skimmer, Marco Class XI-C Day 4,330 RECOVERY 2005 Brush Skimmer, Lamor Day 3,897 2006 Brush Skimmer,Aquaguard RBS-40 Day 2,706 2007 Brush Skimmer, Aquaguard RBS-25, 35G or 10 Twin Day 2,165 2008 Brush/Drum/Disc Skimmer,Aquaguard RBS-05 Day 920 2027 Disc Skimmer, Crucial Magna ORD Day 901 2028 Disc Skimmer, Crucial ORD-XP Day 840 2029 Disc Skimmer, Hoyle T Day 1,236 2009 Disc Skimmer, MI-30, Komara 12K, NRC Disc Day 1,948 2010 Disc Skimmer, Vikoma Sea Skimmer Day 2,165 2124 Disc Skimmer,X-150, Elastec Day 4,871 2030 Disc Skimmer, Crucial, Coated Disc 13/30 Day 1,801 2031 VOSS Package(disc skimmer, power pack, hose, knuckle crane, boom vane) Day 4,121 2011 Drum Skimmer, Roto 70 Day 3,789 2032 Drum Skimmer, Elastec 118G Day 2,184 2012 Drum Skimmer,Action Petroleum Model 60, 48 Day 1,515 2013 Drum Skimmer,Action Petroleum Model 36 Day 1,299 2014 Drum Skimmer, Action Petroleum Model 18, 24 Day 866 2033 Drum Skimmer,Action Petroleum Model 12 Day 618 2034 Drum Skimmer, Crucial Double DB-18H-36 Day 850 2035 Drum Skimmer, Crucial 1 D-1 8H-36 Day 639 2036 Rope Mop Skimmer, 8 Band Day 1,906 2037 Rope Mop Skimmer, 4 Band Day 1,283 2015 Rope Mop Skimmer, II-9 Day 866 2016 Rope Mop Skimmer, 1-4, 11-4, II-6 Day 649 2017 Rope Mop Skimmer. extra rope, 100' Day 119 2038 Vacuum System, Elastec Mini-Vac Day 948 2039 Vacuum System, Elastec PACS 1000 Day 1,071 2040 Vacuum System,Transvac 500D Day 1,030 2018 Vacuum System, Vacuum Transfer Unit(VTU) Day 1,071 2019 Weir Skimmer, Desmi 250 Day 3,789 2041 Weir Skimmer, Elastec Sea Skater Day 1,700 2044 Weir Skimmer, Elastec Ocean Skater Day 2,524 2020 Weir Skimmer, Foilex, vacuum Day 1,624 2021 Weir Skimmer, Foilex, hydraulic Day 2,706 2022 Weir Skimmer, Cascade LP 3000 or Vikoma Fastflow Day 1,732 2023 Weir Skimmer, Skimpak or Oleo, 2"or 3" Day 361 2042 Weir Skimmer, Floating (Desmi Mini-Max, Duckbill, Day 361 2043 Weathered Oil, NRC SWORD(dewatering bays$85/ea add'I) Day 1,910 NRC Price List '�_,oruary 18,2015 Page 3 of 12 CATEGORY 17-EM# DESCRIPTION UM RATE SUPPORT 4001 Deck Barge, up to 110' Day 541 VESSELS 4012 NRC OSV up to 150'-180' (includes Master) Day 17,874 4002 Response Vessel, 65' Hour 406 4003 Response Vessel, 35'-55' Hour 244 4004 Response Vessel, 30'-34' Hour 173 4005 Response Vessel, 25'-29' Hour 135 4006 Response Vessel, 16'-24' Hour 108 4007 Skiffs w/outboard, 15' or less Hour 56 4008 Skiffs w/o outboard Hour 28 TEMPORARY 3001 Bladder Tank, 24 barrel Day 271 STORAGE 3002 Bladder Tank, 25- 100 barrel Day 541 3003 Bladder Tank, 101 -240 barrel Day 1,082 3004 Container, Intermodal or Connex Storage, 20' Day 26 3005 Container, Intermodal or Connex Storage,40' Day 48 3006 Roll-off Bins, up to 20 cu. yd. Day 26 3007 Roll-off Bins, over 20 to 40 cu. yd. Day 48 3008 Storage Tank, 500 to 2,499 gallon Day 24 3009 Storage Tank, 2,500 to 4,499 gallon Day 28 3010 Storage Tank, 4,500 to 6,000 gallon Day 39 3015 Storage Tank, 20,000 gal Day 125 3014 Tank Barge(NRC OSRB only) Day 12,469 3011 Tank Barge or Barge Set, up to 238 bbls(NRC only) Day 1,597 3012 Tote Tank, DOT approved, 275 to 300 gal Day 87 3013 Vacuum Box, up to 25 cu. yd. Day 95 EXCAVATION 5001 Backhoe, 710 or equivalent Day 406 5002 Backhoe, 580 or equivalent Day 352 5003 Backhoe Attachment, Breaker Day 238 5004 Backhoe Attachment, Compactor Day 135 5022 Compaction, Sheepsfoot or Roller Day 500 5024 DOT Transport Chain Day 27 5025 DOT Chain Binder, Ratcheting or Lever Day 11 5006 Dump Bed, Morooka 5-10 cu. yd. Day 379 5021 Dump Truck, 5 cu.yd.,w/Plow&Sander Hour 189 5007 Excavator, Mini Day 510 5008 Excavator, up to 37,000 Ib. Day 920 5009 Excavator, 38,000 to 53,000 Ib. Day 1,137 5010 Excavator, over 53,000 Ib. Day 1,624 5017 Excavator, over 100,000 Ib. Hour 271 5011 Excavator Attachment, Thumb or Wheel Day 379 5012 Excavator Attachment, Hammer Day 595 5013 Loader, Bobcat, Skidsteer or equivalent Day 525 5014 Hydraulic Attachment: Breaker, Compactor or Grapple Day 189 5026 Skidsteer Attachment Day 103 5015 Loader, up to 3.5 CY Day 704 5023 Snowcat Day 1,018 TRAILERS 6001 Trailer, Confined Space Entry/Rescue Day 2,165 6002 Trailer, Decon, up to 24' Day 550 6003 Trailer, Dump, 7,000—12,000 Ib. Day 271 6004 Trailer, Dump, Side/End, 18 yd. Hour 39 6023 Trailer, Emergency Response, petroleum Day 395 6005 Trailer, Emergency Response, up to 24' Day 525 6006 Trailer, Emergency Response, 40'-48' Day 650 6007 Trailer, Equipment, Utility, 1-2 ton Day 108 6008 Trailer, Equipment, Utility, 3-10 ton or Fast Response Day 271 NRC Price List February 18,2019 Page 4 of 12 CA 1-f:GCJR Y ITEM# DESCRIPTION UNIT RATE TRAILERS(Cont.) 6009 Trailer, Flatbed, up to 48' Day 271 6010 Trailer, Incident Command Center, 24' Day 704 6011 Trailer, Incident Command Center, 48' Day 1,624 6012 Trailer, Low Boy Day 325 6013 Trailer, MTR(boom, boat, skimmer add'I if deployed) Day 379 6014 Trailer, Office Day 216 6015 Trailer, Rocket(Roll Off Bin) Launcher Hour 44 6016 Trailer, Side Dump, 3 axle Day 649 6017 Trailer,Tilt Top, 26 ton Day 271 6018 Trailer,Van, up to 48' Day 379 6019 Trailer, Water Buffalo(up to 500 gallons,with pump) Day 216 6020 Trailer, Wildlife Response and Rehab (supplies add'I) Day 2,706 6021 Trailer,Wildlife Search &Collection Day 1,082 6022 Trailer,Wildlife Support Day 379 TRUCKS 7001 Tractor, Diesel Hour 49 7002 Truck, Camera Hour 135 7003 Truck, Crane, 1 ton-6 ton Hour 71 7007 Truck, Dump, up to 10 yard Hour 66 7008 Truck, Dump, over 10 yard Hour 71 7009 Truck, Dump, over 10 yard with pup Hour 76 7016 Truck, Flatbed or Van, 2-Axle, up to 24' Hour 49 7010 Truck, Gear, less than 1 ton Hour 25 7012 Truck, Gear, 1 ton Hour 42 7014 Truck, Gear,2 ton-5 ton Hour 60 7017 Truck, Hazmat Response, up to 24' Hour 81 7018 Truck, Marine Response Hour 56 7022 Truck, Mobile Communications&Command Unit, 34' Day 979 7019 Truck, Roll Off Bin, Bobtail Hour 76 7020 Truck, Roll Off Bin, Bobtail with trailer Hour 87 7021 Truck, Water, up to 3000 gallons Hour 119 VACUUM TRUCKS/ 8001 Guzzler/Air Mover(filters add'I) Hour 162 TRAILERS 8017 Hi-Rail Air Mover w/Air-spade Hour 225 8008 Sweeper-Vacuum & Brush Hour 138 8002 Vactor/Jetter-Combo Unit(attachments add'l) Hour 200 8003 Vacuum Trailer, 120-130 bbl., black iron Hour 34 8004 Vacuum Trailer, 120-130 bbl., stainless Hour 49 8005 Vacuum Truck, less than 35 bbl. Hour 56 8006 Vacuum Truck, 35-80 bbl. Hour 66 8007 Vacuum Trailer, less than 50 bbl. Hour 28 VEHICLES 9001 All-Terrain Vehicle Day 260 9002 All-Terrain Vehicle, Cargo Carrying Day 406 9003 Auto, Personnel or Support Day 108 9008 Pickup Truck/Utility Vehicle(4wd, 2wd) Day 189 9004 Van, MTR(boom,boat,skimmer add'I if deployed) Day 433 9005 Van, Maintenance, Personnel or Support Day 180 9006 Wildlife Transport-Care Vehicle Day 649 BLOWERS/ 1101 Air Compressor, up to 100 CFM Day 162 COMPRESSORS 1102 Air Compressor, 100 to 185 CFM Day 244 1103 Air Compressor,210 to 375 CFM Day 352 1104 Blower, Coppus, Electric/Pneumatic Day 108 1105 Blower, Negative Air Exhaust, 6" (consumables add'I) Day 81 1106 Blower, Negative Air Exhaust, 12" (consumables add'I) Day 119 1107 Blower, Venturi, Horn Day 34 1108 Exhaust Duct, 25'x 6", 10" or 12" Day 28 NRC Price List February 18,2019 Page 5 of 12 CATEGORY 'TL1,1ft IIESCRIPTION G,'N/7RATE PRESSURE 1214 Dump-Style Gun, Foot Operated, up to 20k psi Day 91 WASHERS 1215 Dump-Style Gun, Single, Safety Surround, up to 40k Day 134 1216 Dump-Style Gun, Dual, Safety Surround, up to 20k psi Day 134 1217 Dump-Style Gun, Multi Gun Valve Control System Day 113 1219 Flange Mount Anti-Withdrawal Device Day 18 1206 Flexible Lance, 50', Rigid Tip, Foot Pedal, up to 5k psi Day 81 1212 Flexible Lance, 50', Rigid/Spinner Tip, Foot Pedal, 5k Day 129 1211 Flexible Lance, 50', Foot Pedal, up to 20k psi Day 135 1202 Hydroblaster, 6,000 psi Hour 56 1203 Hydroblaster, 10,000 psi Hour 76 1204 Hydroblaster,20,000 psi Hour 195 1209 Jetter Trailer Hour 103 1218 Pipe Centralizer, 8"—36" Diameter Day 34 1207 Pressure Washer, up to 3,000 psi, single Day 271 1210 Pressure Washer, up to 3,000 psi, dual w/tank Day 649 1208 Pressure Washer, 3,000 to 5,000 psi Day 379 1205 Remote Tank Cleaning(Gamajet) Head Day 325 1201 Specialty Nozzles up to 5k psi (Roto,fogging, etc.) Day 49 1213 Specialty Nozzles over 5k psi (Rotating multi-tip) Day 86 PUMPS 1311 Drum Vacuum (consumables add'I) Day 162 1301 Pump, up to 1", Petroleum Day 66 1302 Pump, up to 1", Chemical Day 103 1303 Pump, 2", Petroleum Day 92 1304 Pump, 2", Chemical Day 211 1305 Pump, 2", Chemical Peristaltic Day 379 1306 Pump, 3", Petroleum Day 108 1307 Pump, 3", Chemical Day 319 1312 Pump, 3", Hydraulic(Archimedes/MT30)w/power pack Day 1,624 1308 Pump, 4", Petroleum Day 189 1309 Pump, 4", Petro-Submersible Day 352 1324 Pump, Fire, 1800gpm 150psi Day 1,854 1325 Pump, Sludge Day 824 1310 Pump, 5"-6", Petroleum Day 433 1316 Pump, Double Diaphragm, Stainless Steel, 1" Day 216 1317 Pump, Double Diaphragm, Stainless Steel, 2" Day 325 HOSES I PIPES I 1405 Guzzler/Air Mover Vacuum Breaker Day 34 FITTINGS 1406 Guzzler/Air Mover/Jetter Fittings(elbows, tees, etc.) Day/Each 10 1415 Hose, Discharge(lay flat), 2" 50 Ft/Day 12 1416 Hose, Discharge (lay flat), 3" 50 Ft/Day 15 1417 Hose, Discharge (lay flat), 4" 50 Ft/Day 18 1418 Hose, Discharge (lay flat), 6" 50 Ft/Day 28 1401 Hose, Fire, 1.5" 50 Ft/Day 18 1402 Hose, Fire, 2.5" 50 Ft/Day 22 1403 Hose, Guzzler/Air Mover, Flex or Pipe, 4" Ft/Day 6 1404 Hose, Guzzler/Air Mover, Flex or Pipe, 6" Ft/Day 7 1420 Hose, Hydraulic 50 Ft/Day 28 1428 Hose, Hydroblaster, up to 20,000 psi 50 Ft/Day 130 1407 Hose, Pneumatic 50 Ft/Day 12 1429 Hose, Pressure Washer, up to 6,000 psi 50 Ft/Day 24 1408 Hose, Suction &Discharge, 2", Petro 25 Ft/Day 18 1409 Hose, Suction &Discharge, 2", Chemical 25 Ft/Day 34 1410 Hose, Suction &Discharge, 3", Petro 25 Ft/Day 28 1411 Hose, Suction &Discharge, 3", Chemical 25 Ft/Day 44 1412 Hose, Suction &Discharge,4", Petro 25 Ft/Day 39 1413 Hose, Suction& Discharge,4", Chemical 25 Ft/Day 66 NRC Price List February 18,2019 Page 6 of 12 CATEGORY ITEM# DESCRIPTION UNIT RATE HOSES/PIPES 1 1414 Hose, Suction &Discharge, 6", Petro 25 Ft/Day 49 FITTINGS(Cont.) 1424 Hose, Teflon, 1"Rubber Jacketed or 2" Stainless Braid Ft/Day 39 1419 Hose, Wash, up to 1" 50 Ft/Day 12 SUPPORT 1501 Air Knife Day 162 1555 Bag Filter System, Single(bag filters add'I) Day 66 1502 Bag Filter System, Dual Pod (bag filters add'I) Day 81 1567 Banding Equipment, 2-inch Hour 34 1568 Banding Equipment, 2-inch Day 260 1583 Butane Flare Kit(includes hoses and nitrogen) Day 102 1503 Carbon Filtration System Each/Day Quote 1504 Chipping Gun, Pneumatic Day 55 1505 Compactor, Hand Operated Day 162 1506 Decon Cleaning Pool, Portable 10'x 15' Day 135 1507 Decon Cleaning Pool, Portable 10'x 30' Day 216 1508 Decon Cleaning Pool, Portable 20' x 100' Day 595 1509 Decon Cleaning Pool, Portable 25' x 50' Day 298 1510 Decon Station, Personnel 2 Stage (supplies add'I) Day 56 1553 Decon Station, Personnel 3 Stage(supplies add'I) Day 81 1580 Drum Dolly Day 42 1511 Electrical Accessories(cords, GFCI, adaptors) Day 17 1573 Floor Buffer(pads add'I) Day 80 1512 Forklift, 5K to 1 OK Ib. Day 298 1513 Forklift, Attachment Day 108 1514 Generator, less than 4 kW Day 75 1515 Generator, 4 kW to less than 7.5 kW Day 124 1516 Generator, 7.5 kW to 12.5 kW Day 179 1574 Generator, 67 kW Day 348 1587 Geoprobe 6620DT Day 900 1588 Handheld Extrusion Welder Day 250 1517 Handheld Pipeline Locator System Day 162 1569 Hydrogen Peroxide System (consumables add'I) Day 260 1518 Jackhammer Day 162 1519 Ladder, Extension, Folding or Jacobs Day 44 1557 Laser Level Kit, 1/16"x 100' Day 61 1558 Laser Level Kit, 1/4"x 100' Day 18 1520 Light Tower,Trailer Mounted Day 189 1521 Light, Explosion-Proof or Wet-Location Day 48 1570 Light, Explosion-Proof, LED String (10 lights/each) Day 476 1522 Light, Stand, Regular, 50OW Day 20 1523 Light, Stand, Regular, 1000W Day 66 1524 Office Space(for command post at NRC as available) Day 1,624 1525 Pipe Plug 4"to 18" (includes 20' air line hose) Day 103 1526 Pipe Plug 18"to 24" (includes 20' air line hose) Day 168 1527 Pipe Plug 24"to 36" (includes 20' airline hose) Day 189 1528 Pipe Plug 36"to 48" (includes 20' air line hose) Day 233 1529 Pipe Plug 48"to 60" (includes 20' air line hose) Day 379 1572 Portable Toilet, (includes service, wash basin) Day 108 1563 Portable Breathing Air Compressor Day 406 1530 Power Pack, Hydraulic, 1 hp(<0.75 kW) Day 56 1531 Power Pack, Hydraulic, 16 hp (0.75 kW< 12 kW) Day 149 1532 Power Pack, Hydraulic, 40 hp (12 kW<30 kW) Day 298 1533 Power Pack, Hydraulic, 60 hp (30 kW<45 kW) Day 541 1534 Road Closure Signs, reflective Day/Each 56 1535 Road Closure, Barricades, Cones, Delineators Day/Each 7 1536 Sand &Floor Dry Spreader Attachment Day 103 1537 Saw, Chain Day 66 NRC Price List February 18,2019 Page 7 of 12 CATEGORY ITEM# DESCRIPTION UNIT RA7E_ SUPPORT(Cont.) 1538 Saw, Cutoff Day 135 1575 Scissor Lift, 24' Day 129 1539 Soil Sampler, Hollow Stem Day 56 1584 Specialty Rope Bag (w1 shackles,D-rings,carabiners,pulleys) Day 255 1581 Steel Plate, 4'x 8' Day 129 1582 Steel Plate, 5'x 10' Day 155 1540 Tools, Hand(brooms, shovels, etc.) Each/Day 15 1541 Tools, Mechanical Set Each/Day 56 1542 Tools, Non-Sparking Each/Day 18 1543 Tools, Power, Small (drills, Sawzall, etc.) Each/Day 39 1544 Truck Ramps Day 162 1545 Vacuum, HEPA(filters add'I) Day 271 1546 Vacuum, Shop (filters add'I) Day 56 1547 Vactor/Jetter Attachment(hydro-exca,Drum-It head,nozzles) Each/Day 103 1566 Vapor Extraction System, Portable Day 379 1548 Welding Unit/Torch Set, Portable Day 92 1549 Wildlife Rehabilitation Pool Day 216 1550 Wildlife Shelter, 19' x 35' Day 2,165 1551 Wildlife Shelter, 20'x 20' Day 812 1552 Yokohama Fenders, 8' diameter Day 189 COMMUNICATIONS 1601 Base Station Day 81 1602 Cellular Phone (airtime over$10 per day add'I) Day 39 1603 Computer and/or Printer Day 103 1604 GPS Unit Day 56 1605 High Power Repeater System w/Generator Day 325 1606 Radio, UHF or VHF, Portable Day 28 1607 Satellite Phone(includes 20 minutes airtime per day) Day 81 1608 Satellite Dish for HS Internet Day 135 1609 Respirator Comms System Day 127 SAFETY 1701 Air Sampling Kit(tubes add'l) Day 44 1702 Chest or Hip Waders, Insulated Cooling Vests Each/Day 28 1726 Cylinder Containment Device Day 2,165 1704 Eyewash Station Day 39 1705 Drager CMS Meter Day 216 1706 Floatation Work Suit Each/Day 56 1707 Floatation Work Vest, PFD Each/Day 12 1710 Harness(including Lanyard or SRL) Day 28 1735 Head Lamps Each/Day 6 1730 Hazcat Kit Day 162 1734 Kendrick Extrication Device(KED) Use 212 1733 Manometer Day 80 1711 Meter, 4EC Radiation Day 379 1712 Meter, LEL/02/H2S/CO Day 162 1725 Meter, LEL/02/H2S/C0/PID Day 276 1713 Meter, Jerome Mercury Day 649 1723 Meter, Lumex Mercury Day 920 1714 Meter, Personal/Gillian, Single/4-gas Each/Day 44 1715 Meter, Personal/Particulate Monitoring Each/Day 162 1716 Meter, PID Day 216 1717 Mercury Vacuum (consumables add'I) Day 812 1724 Remote Drum Drilling Unit Day 649 1736 Rescue Gear, SKED Day 27 1737 Rescue Gear, Stokes Basket Day 17 1708 Respirator, Full Face(cartridges add'I) Each/Day 40 1709 Respirator, Half Face (cartridges add'I) Each/Day 24 NRC Price List February 18,2019 Page 8 of 12 CATEGORY ITEM# D SCHiP7 )N UNIT RATE SAFETY(Cont.) 1719 SCBA or Egress Bottles w/lines Each/Day 225 1729 SCBA or Egress Bottles w/lines, Refill Each/Day 28 1731 Shin and Metatarsal Guards,Aluminum Day 29 1720 Six Pack/Regulated Air Supply (includes up to 300'airline) Day 325 1738 Support Station,Table and Chairs Day 129 1739 Support Station, Canopy Day 27 1740 Swift Water PPE Equipment(River Vest,Helmet,Throw Bag Day 61 1721 Tripod and Winch Day 271 1732 Turtle Armor Suit(Torso,Chaps,Gaiters,Gauntlets) Day 91 DISPERSANTS/ 1901 Pilot Hour 275 AIRCRAFT 1902 Co-Pilot Hour 225 1903 Trained Aerial Observer/Spotter Hour 210 1904 Air Boss Hour 190 1905 System Operator Hour 190 1906 Airplane Mechanic Hour 175 1909 Douglas DC-4/Convair 340 Spray Aircraft(Inc.first Air Crew) Hour 8,585 1910 Douglas DC-6 Spray Aircraft(includes first Air Crew) Hour 9,595 1911 Spotter Aircraft(includes first Air Crew) Cost+20% 1912 Dispersant Loading pumps Day 520 1913 Dispersant(Applied/Standby) Cost+20%/$10 per gallon 1914 Portable Dispersant Spray System Day 2,601 Equipment Terms: 1. NRC does not rent equipment in a bare condition. All equipment shall be operated and controlled by NRC only.NRC maintains exclusive rights to assign specific equipment operators and/or vessel crews for response operations. All equipment sent to site by NRC shall be in a basic operating condition. Additional components charged to Customer include,but are not limited to,multiple hose lengths,blast shields,specialty tips or fittings,specialty connections,noise abatement,catalytic converters,etc. Equipment prices do not include fuel,operator or mobilization unless otherwise stated. Fuel consumed in non-mileage related operation of equipment,including vehicle and non-vehicle equipment and vessels,will be charged per Material rates. Vacuum truck washouts will be charged at cost plus 20%. Regulatory permits and environmental fees(HP Fees,BTU Fees,etc.)shall be assessed at cost plus 20%based upon the equipment and duration of such unit. Additional equipment safety requirements beyond the published OSHA and DOT regulatory standards charged at cost plus 20%for the additional items plus the cost of installation. Equipment that requires electrical connection to owner/facility provided power shall only be connected by licensed electricians experienced in the type of connection required and voltage rating.Equipment that requires air power to operate may be attached to owner/facility provided that the pressure and connections are compatible with NRC equipment and that shut off valves are in compliance with regulations. 2. Time charges are calculated portal to portal,including any demurrage beginning with equipment mobilization activities from the NRC office or operations center unless otherwise specified,including all time at the site. Time charges terminate at the conclusion of the operation,which includes transportation of equipment back to NRC office or operations center and completion of any necessary demobilization activities,including disposal,cleaning,repair, replacement and/or delivery to NRC of restored equipment. 3. Day rates are based on 8 hours of operation. Minimum charge for Day rate equipment is daily charge per day with additional hours over 8 charged in half-day increments for up to a total of 3 days'charge during a 24-hour period.Minimum call out for hourly equipment is 4 hours per day for local projects and 8 hours per day for projects over 50 miles from mobilization site,except for a 5-hour minimum per day for ALL aircraft. Customers will be charged for unused requested equipment until released and returned to service per Note 2. 4. Equipment not on Price List or unavailable from NRC at time of request will be charged at cost plus 20%for all costs,including rental,insurance,freight, fuel,etc. 5. In addition to payment of rental charges,Customer agrees to pay NRC,in accordance with rates contained in this Price List,for any cleaning or repairs necessary to return all equipment to the same condition as at the commencement of services(with the exception of normal wear and tear). Customer is also responsible for the payment of all transportation and disposal charges for any waste generated during cleaning. Only NRC or its subcontractors shall perform any cleaning and decontamination operations on all equipment owned,rented or subcontracted by NRC. If NRC determines that equipment cannot be returned to the condition it was in at the commencement of the services,Customer shall pay for all costs at cost plus 20%,including freight and other expenses incurred by NRC to replace this equipment. All boom,whether new or used,that is damaged beyond repair shall be replaced by NRC with new boom at Customer's expense at cost plus 20%,including freight and other expenses.Customer shall pay for all costs of verification sampling,including wipe testing,fluid analysis,filter change outs,etc.,per regulations of any equipment that requires such prior to returning to unlimited operations,whether at NRC facilities or rental yards. 6. Mobile Communications&Command Unit rate includes the following subsystems:UHF-FM,VHF-FM,VHF Marine,fax machine,copier and satellite system capability(with VOIP/Internet).Service use/satellite airtime charges charged separately at cost plus 20%. 7. Any and all surcharges,including but not limited to general,marine,equipment&Jones Act insurances charged by NRC subcontractors that are directly connected with resources provided to Customer are charged to Customer at cost plus 20%. 8. Base OSRV crew consists of licensed Mate,2 Deckhands,2 Tankermen and 4 Responders to handle equipment.Additional responders and support personnel(e.g.cook,QMED)may be deemed necessary based on magnitude of event,weather conditions and event duration. All required OSRV personnel are charged at cost plus 20%. 9.All vessels and waterborne equipment rates will be increased by fifty percent(50%)when operating in ice conditions. NRC Price List February 18,2019 Page 9 of 12 MATERIALS AND SUPPLIES C,-i ^0} y 'TF"ff r)FFra!0_r'1 1 UNIT RATE BAGS/SHEETING M100 Bulk Bag, 1 yard Each 34 M113 Dunnage Bags Each 44 M101 Plastic Bag, 36"x 60", 6 mil, 50/roll or box Roll/Box 134 M102 Plastic Bag, 36"x 60"(drum liner) Each 4 M103 Roll Off Bin Liner Each 39 M104 Sheeting, 20'to 32' x 100', 10 mil Roll 168 M105 Sheeting, 20'to 32' x 100', 6 mil Roll 124 M110 Sheeting, 8'to 20'x 100',4 mil Roll 74 M111 Sheeting, 20' x 100', Flame Retardant, 6 mil Roll 85 M112 Sheeting, 12' x 100', Flame Retardant, 6 mil Roll 55 CLEANERS M205 Cleaner, Hand, 14 oz. tub Each 7 M200 Cleaner, Hand, 1 gallon Each 34 M201 Cleaner, Marine/Industrial (Simple Green or equivalent) Gallon 28 M202 Bleach Gallon 6 M204 Decon Solvent(HD Citrus Degreaser,Penetone,PES-51) Gallon 87 M211 Disinfectant(IPA,Misty Biodet,Sporicidin,Zep DZ-7 ) Gallon 54 M209 Encapsulant Solution Gallon 49 M208 Hydrogen Peroxide Fogging Aerosol Gallon 66 M210 Mastic Remover Gallon 17 M207 Mercury Cleaning Solution Gallon 71 M206 Mercury Vapor Suppressant Pound 39 M212 VOC Suppressant(Biosolve,Gold Crew) Gallon 94 CONTAINERS M318 1 Gallon, Poly Pail Each 12 M301 5 Gallon, Bucket w/Lid Each 22 M313 5 Gallon, Plastic Carboy Each 24 M302 10-15 Gallon, Steel Each 103 M319 15 Gallon,-Poly Each 86 M303 20 Gallon, Open Top, Steel Each 80 M304 30 Gallon, Open or Close Top, Refurbished Each 87 M320 30 Gallon, Open or Close Top, Steel, New Each 97 M305 55 Gallon, Close Top, Steel, Refurbished Each 66 M314 55 Gallon, Close Top, Steel, New Each 97 M306 55 Gallon, Open Top, Steel, Refurbished Each 70 M315 55 Gallon, Open Top, Steel, New Each 97 M316 55 Gallon, Open or Close Top, Poly, Refurbished Each 77 M307 55 Gallon, Open or Close Top, Poly, New Each 97 M308 85 Gallon, Overpack, Unlined, Black Each 244 M309 85 Gallon, Overpack, Lined,Yellow Each 276 M310 95 Gallon, Overpack, Poly Each 287 M317 275-300 Gallon, Liquid Tote, DOT, Recon Each 249 M311 275-300 Gallon, Liquid Tote, DOT, New Each 487 M321 Fluorescent Tube Disposal Container,4' Each 42 M322 Fluorescent Tube Disposal Container, 8' Each 74 M312 Triwall Box, Cubic Yard, DOT Approved Each 135 SAFETY M400 Acid Suit, 1 Piece Each 97 M401 Boot, Steel Toed, PVC/Nitrile Pair 31 M442 Face Shield Each 12 M402 Glove,Work Glove Pair 4 M403 Glove, Inner, Cotton, Latex or Nitrile Pair 1 M404 Glove, Inner, Cotton, Latex or Nitrile 50/Box 34 M405 Glove, Silver Shield Pair 6 M406 Glove, Medium Duty, PVC Pair 5 NRC Price List -ebruary 18,2019 Page 10 of 12 CATEGORY ITEM# DESCRIPTION UPVI T` RA7_f. SAFETY(Cont.) M407 Glove, Heavy Duty, PVC Pair 10 M620 Negative Air Exhaust Consumables Change Out Each 184 M513 Orange Construction Fence, 4'x100' Roll 70 M641 Pallet Each 17 M607 Petro Flag Test Kit Per Test 39 M408 Glove, Heavy Duty, Butyl Rubber Pair 34 M409 Hard Hat Each 31 M410 Overboot, Disposable Pair 9 M446 PBI /FR Cotton/Nomex Coveralls(replacement) Each 371 M426 Protective Gear Level B Each 487 M427 Protective Gear Level B, Change Each 325 M428 Protective Gear Level C Each 92 M429 Protective Gear Level C, Change Each 61 M430 Protective Gear Level D Each 39 M431 Protective Gear Level D, Change Each 24 M432 Rain Gear, 2 Piece Set 24 M445 Rescue Rope, Lifeline or Tagline, 10' Each 15 M433 Respirator, Cartridge, Single, OV,Acid Gas, P100 Pair 31 M443 Respirator Cartridges, Combo Pair 43 M434 Respirator, Cartridge, Mercury/chlorine Pair 59 M436 Safety Eyewear Each 9 M438 Safety Vest Each 36 M444 Thermo Pro Each 487 M439 Tyvek Suit, Saran-Coated, Disposable Each 34 M440 Tyvek Suit, Uncoated, Disposable Each 15 M441 Tyvek Suit, Poly-Coated, Disposable Each 17 SORBENTS M500 Absorbent, Chemical Stabilizer, 35 Ib. Bag 141 M501 Absorbent, Absorb X Bag 36 M502 Floor Dry 25 Ib. Bag 13 M503 Neutralizer(citric acid) Bag 170 M520 Neutralizer(ash or bicarbonate) Bag 38 M519 Neutralizer, Liquid Gallon 44 M504 Oil Snare on Rope, 50 ft./Bag Bag 146 M505 Oil Snare, 30/Carton Carton 119 M506 Sorbent Boom 5" x 10',4/Bale Bale 108 M507 Sorbent Boom 8"x 10',4/Bale Bale 200 M508 Sorbent Roll, SXT 638, 38"x 144' x 3/8° Roll 200 M509 Sorbent Sheet 17"x 19"x 3/8", 100/Bale Bale 81 M510 Sorbent Sweep 17"x 100'x 3/8" Each 141 M514 Straw Wattles, 25 ft./Roll Roll 56 M512 Universal Pads, 11"x13"or equivalent, 50/Bale Bale 97 M511 Vermiculite, 4 cu. ft./Bag Bag 34 MISCELLANEOUS M627 Abatement Supplies(scrapers, mop-heads, etc.) Each 12 M621 Air Mover Dry Filter Sock Each 22 M600 Banner Tape, 3" Roll 24 M638 Brake Cleaner Can 11 M619 Catch Basin Filter Each 59 M626 Chemtape Roll 44 M601 Cotton Rags, 25 Ib. Box/Bale Each 56 M602 Decon Pool, Small Personnel Each 34 M617 Flex Hose, Consumable, 4" Foot 4 M618 Flex Hose, Consumable, 6" Foot 5 M628 Floor Buffer Pads Each 54 M604 Duct Tape, 2" Roll 10 M639 Glue(3M Aerosol) Can 16 M622 HEPA Vacuum Consumables, Standard Each 56 NRC Price List February 18,2019 Page 11 of 12 CATEGORY ITEM# DESCRIPTION UNIT RATE. MISCELLANEOUS M625 HEPA vacuum Consumables, Tornado Filter Each 271 (Cont.) M623 HEPA Vacuum Consumables, Complete Each 487 M631 Lead Paint Field Screening Test Kit-5 Tests Each 48 M640 Ice, 7 Ib. Bag Each 6 M642 Jute Netting (includes staples) Roll 126 M629 Masking Tape, 3" Roll 11 M606 Mercury Vacuum Consumables Change Out Each 81 M632 pH Strips Package 33 M612 Photo Documentation, Disposable or Digital Each 39 M613 Poly Rope, 600', up to 1/2" Roll 97 M630 Scrubbing Pads Each 5 M603 Sampling Tubes and Supplies Each 23 M614 Sand Bags, Filled Each 11 M633 Silt Fence, 100' Roll 119 M616 Sprayer, Hand Held (Hudson), 3 gallon Each 61 M801 Water, Drinking, 24/case Case 17 M850 Mileage for Car(M850+Eq Item#) Mile 0.77 M851 Mileage for Trucks/Vans(M851+Eq Item#) Mile 0.88 M852 Mileage for Commercial Trucks(M852+Eq Item#) Mile 1.11 M860 Equipment Fuel (Gasoline/Diesel)(M860+Eq Item#) Gallon 3.90 M883 Fuel -Extra Heavy Equipment(NO1e 7) Hour 23.40 M884 Fuel -Heavy Equipment(Note 7) Hour 11.70 M885 Fuel -Light Equipment(Note 7) Hour 3.90 M872 Equipment Grease, up to 14 oz. cartridge Each 10 M880 Bridge Toll, Vehicle, 2 axle Each 13 M881 Bridge Toll, Vehicle w/Trailer, 3 axle Each 24 M881 Bridge Toll, Vehicle w/Semi-Tractor, 4 axle Each 34 M882 Bridge Toll, Semi w/Trailer, 5 axle Each 44 M901 Transportation to TSDF,Triwalls,Totes Each 175 M902 Transportation to TSDF, Drums Each 49 Materials and Supplies Terms: 1. All materials and supplies utilized,whether listed in daily reports or not,are chargeable in full quantity amounts as indicated by the identified unit,i.e., gallon,roll,each. Any materials or supplies not listed on Price List,including Wildlife Trailer supplies and expendables and third-party invoices for services,charged at cost plus 20%. 2. Quotes for waste disposal are based on meeting approved profiles. Analytical Data Packages beyond the industry standard QA/QC reports shall be charged at Cost+20%. NRC will assist Customer in identifying disposal facility options and provide price quotes. However,this does not constitute a referral and it is the sole responsibility of the Customer to designate the disposal facility. NRC will not take title to any wastes:dangerous,hazardous or non-hazardous. 3. The number of change-outs of Personal Protective Equipment(PPE)are based on conditions occurring in the work area. PPE shall be changed at a frequency that conforms to safety practices to prevent exposure to employees during the work activity. PPE categories: Level D: Coveralls/Uniform,Steel Toe Boots,Safety Glasses,Work Gloves,Hard Hat and Safety Vest as applicable; Level C: Level D plus,Disposable Tyvek,Full Face or Half Face Respirator(excluding cartridges); Level B: Level C plus SBCA or supplied air(includes mask,100'air supply hose,supplied air,bottle manifold and egress bottle). 4. All necessary support services(e.g.outside accounting,scientific support,communications technical support,non-NRC marine equipment)will be charged to Customer at cost plus 20%. 5. NRC reserves the right to substitute products of equal quality and construction without affecting the performance. NRC applies the Brand Name of a product as a reference only and reserves the right to substitute as it deems necessary. 6.NRC use of facility-directed or Customer-directed decontamination products,including but not limited to degreasing agents,cleaners,strippers, conditioners,cutter stock,etc.,shall be done at the facility's or Customer's risk. 7. Fuel usage(non-driving)charged for hours operated by type as follows:Extra Heavy Equipment(Guzzler,Jetter,Large Yellow Iron>89 HP,and similar)=6 gals/hr; Heavy Equipment(Tractors,Vacuum Trucks,>50 HP Compressors,Water Blasters,Large Generators,Small Yellow Iron<89 HP, PTO-driven,and similar)=3 gals/hr;Light Equipment(Pressure Washers,Compressors<50 HP,Light Towers,Small Generators,and similar)=1 gal/hr. Actual rate subject to change based on increases in fuel cost. 8. NRC OSRO Response Services provided by ICNs will be marked up 10%.NRC ICN T&M rates can be accessed at www.nrcc.com. OSRO Client Training and Drill Rates: Onsite Training-$950/person(includes up to 8-hour day,additional hours$175/hr.): OSRO Client onsite training in ICS,Tabletops,Hazwoper. Travel time and expenses not included. Simple Drill-No Charge(maximum 2 hours of NRC staff time): Covers phone verification of client,a check of telephone numbers,completion of a spill notification sheet,and assignment of a NRC case number,telephone calls and faxing/emailing of information. Client may request a site specific report of NRC's available resources. Intermediate Drill-$500/each(maximum 8 hours of NRC staff time): Includes all the services of a Simple Drill but requires other services,which necessitate the activation of additional support personnel to meet the special needs or requests from the client. These personnel will be dedicated to assisting the client during the drill and providing the necessary paperwork and information for documentation. Advanced Drill—Quote: Drills requiring services in excess of an Intermediate Drill,including additional staff time,actual deployment of equipment or a call out of personnel,will be provided on a time and material basis per Price List rates. It is recommended that if a drill of this magnitude is planned and that the client contact NRC in advance to obtain an estimate. NRC Price List February 18,2019 Page 12 of 12 Exhibit B City of Federal Way PRICE LIST Special Operations Supplement Effective February 18, 2019 PERSONNEL ITEM# DESCRIPTION S T SOXM Project Manager XT(Reactive/Explosive/Cylinder/Compressed Gas) 240 360 480 SOXT Technician XT(Reactive/Explosive/Cylinder/Compressed Gas) 185 278 370 SOFM Project Manager Fire 225 338 450 SOFF Fire Fighter 160 240 320 SOSM Senior Project Manager 145 218 290 SOPM Project Manager 120 180 240 SOSS Supervisor, Special Operations 100 150 200 SOIL Team Leader, Special Operations 85 128 170 SOTS Technician/Equipment Operator 70 105 140 SOMD Paramedic 80 120 160 SOAL Ops Admin/Logistics 60 90 120 SOWD Welder(Hazardous Duty Welding) 125 188 250 EQUIPMENT CATEGORY ITEM# DESCRIPTION UNIT RESPONSE UNITS 6024 Trailer, Reactive/Explosive/Special Operations Day 750 6025 Trailer, Emergency Breathing Air Day 5,000 6027 Trailer, Emergency Response Enclosed 20' Day 500 6028 Trailer,Transfer compressed gas, static liquid 40-48' Day 1,000 6029 Trailer, RV w/Living Quarters( M &I Not Included) Day 500 6030 Trailer, Utility Day 200 6031 Truck, Emergency Response Day 350 6032 Truck, 1 1/2 Ton Crew Cab Day 300 6033 Truck, 2 1/2 Ton Crew Cab Day 400 6034 Truck, Mobile Command Day 500 6035 Truck, 1-Ton Crew Cab Day 200 6036 Truck, Light/Sedan Day 175 6037 Truck, Semi-Over the road Day 650 6038 ATV, 6 Wheel Day 350 POWER PACKS& 1109 Corken Compressor(291 T/Corrosive Compatible) Day 788 COMPRESSORS 1110 Corken Compressor(490T/Corrosive Compatible) Day 1,051 1564 Hydraulic Power Pack, 75 hp with 100 ft. of Hydraulic Day 750 1576 PTO Hydraulic Power Unit,with 100 ft. of Hydraulic Day 550 PUMPS 1314 Blackmer Stainless Steel Sliding Vane Day 700 1315 Corken, Coro Vane or Equivalent(3") Day 700 1319 Drum Pump, Stainless Steel (3") Positive Displacement Day 525 1320 Double Diaphragm,Aluminum (2") Day 225 1321 Double Diaphragm, Poly-Pro (2") Day 300 1322 Double Diaphragm, Poly-KynarfTeflon (11") Day 200 1318 Fire/Dispersant Day 265 1313 Jet Pump(gas eductor) 1"or 2" Day 275 1323 Roper Vane Pump, Carbon Steel (3") Day 525 1426 Stinger, 2", CPVC/SS/Carbon Day 150 HOSES 1423 Chlorine Transfer, certified Ft/Day 60 1432 Crosslinked Polyethylene Hose(2") Ft/Day 15 1433 Crosslinked Polyethylene Hose 0") Ft/Day 5 24-Hour Emergency Response: 1-800-899-4672 NRC Price List-Special Operations Supplement February 18,2019 Page 1 of 2 CATEGORY ITEM# DESCRIPTION UNIT RATE HOSES(Cont.) 1421 LPG/NH3, 1"Vapor Ft/Day 12 1422 LPG/NH3, 2" Liquid Transfer Ft/Day 25 1430 Teflon, Rubber Jacketed (11 Ft/Day 35 1431 Teflon, Stainless Steel Braid (21 Ft/Day 35 1427 Transfer Fittings(gauges, nipples, risers, etc.,) Transfer 300 1425 Stainless Steel Hose (2") Ft/Day 35 1434 Ultra-High Molecular Weight Polyethylene Hose 2" Ft/Day 15 FIRE FIGHTING 1823 Complete Turnout/Bunker Gear Day 285 1821 Eductor(1", 1 '/")60 to 95 qpm Day 75 1822 Eductor(2'/")250 qpm Day 100 1806 Fire Hose(1"to 3") Double Jacketed Ft/Day 2 1807 Fire Hose(4"to 6") LDH Ft/Day 3 1808 Fire Hose Tester Day 250 1825 Fire Fighting Fittings Charge Day 500 1805 Fire Fighting Quick-out Kits(flight ready)+ mob Day 1,000 1826 Flash Suit Day 300 1824 Frameless Bladder(10,000 gallon) Day 550 1813 Job Box(Tools,Adapters, Fittings) Day 1,500 1803 Mounted Monitor—(300-1250gpm)+consumables Day 1,250 1814. Monitor&Nozzle, 2'/" Inlet(500 GPM Ground set) Day 450 1815 Monitor&Nozzle, 2 '/" Inlets (1250 GPM Ground Set) Day 750 1816 Nozzle(1", 1 '/") Day 195 1817 Nozzle(2 '/2") Day 225 1818 Nozzle, High-X(1 '/Z") Day 350 1819 Nozzle, Piercing (1 '/") Day 225 1820 Nozzle, Foam Pro Day 250 1809 Pito Flow Meter Day 125 1804 Portable Fire Pump(650gpm NFPA Rated)+ Day 2,200 1812 Pressure Pump, Fire, 250 psi, 200 qpm Day 250 1810 Suction Hose(4") Section 125 1811 Suction Hose(6") Section 150 1800 Trailer, Portable Fire w/Pump Day 400 1801 Trailer, Fire Fighting Foam, Type I, 550 gal + Day 3,500 1802 Trailer, Fire Fighting Foam,Type Il,275 gal + Day 1,500 MISCELLANEOUS 1703 Chlorine A/B/C Response Kits (gaskets add'I) Day 525 1577 Fabrication, Specialty Tool Charge Day 300 1559 Flare, Ground Set, 2" Day 250 1560 Flare, Ground Set, 3" Day 350 1561 Flare, Stack, 2" Day 125 1562 Flow Meter, 2", Stainless Steel Day 175 1578 Mag-Drill Day 225 1571 Manway Adapter, 14"-22", Stainless Steel Day 350 1728 Midland Capping Kit Day 1,250 1718 Salvage Cylinder/Coffin Day 1,600 1579 SRV Puller/Excess Flow Valve Defeater Day 500 1580 Thermal Imager Day 750 1565 Trident Magnetic Patch Day 1,000 1722 Truck Rollover/Cylinder Drill Kit/Betts Valve Day 450 MATERIALS AND SUPPLIES CATEGORY ITEM# DESCRIPTION UNIT M635 AR-AFFF Foam Gallon 55 M636 Hiqh-X Foam Gallon 55 M634 Manway Gaskets Each 210 M425 Responder(encapsulated, Level A) Each 1,300 M447 Responder(encapsulated, Level A with flash cover) Each 3,000 M853 Mileage, Special Ops Trailer Mile 1.50 M854 Mileage, Special Ops Truck Mile 1.50 M855 Mileage, Special Ops Truck (1 1/2 ton,2 1/2 ton, Mile 2.50 M856 Mileage, Special Ops Semi/over the road truck Mile 3.00 NRC Price List Special Operations Supplement subject to all NRC Price List terms and conditions. NRC Price List—Special Operations Supplement February 18,2019 Page 2 of 2 EXHIBIT C CONTRACT CHANGE ORDER AGREEMENT PROJECT NUMBER CHANGE ORDER NUMBER EFFECTIVE DATE PROJECT TITLE CONTRACTOR SUMMARY OF PROPOSED CHANGES: The time provided for completion in the Contract is ❑ Unchanged ❑ Increased ❑ Decreased by Calendar Days. This Document shall become an Amendment to the Contract and all provisions of the Contract not amended herein will apply to this Change Order. Will this change affect expiration or extent of Insurance coverage? ❑ Yes ❑No If"Yes"Will the Policies Be Extended? ❑ Yes ❑No PRICE CHANGE LUMP SUM: INCREASE$ DECREASE$ UNIT PRICE: THE ITEMS ARE APPROXIMATE OR ESTIMATED QUANTITIES INVOLVED IN THIS CHANGE ITEM NO. ITEM QTY. UNIT PRICE ADD OR DELETE TOTAL NET CONTRACT: INCREASE$ DECREASE$ STATEMENT: Payment for the above work will be in accordance with applicable portions of the standard specifications, and with the understanding that all materials, workmanship and measurements shall be in accordance with the provisions of the standard specifications, the contract plans, and the special provisions governing the types of construction. DEPARTMENT RECAP TO DATE: ORIGINAL CONTRACT AMOUNT $ PREVIOUS CHANGE ORDERS $ THIS CHANGE ORDER $ *ADJUSTMENTS $ NEW CONTRACT AMOUNT $ CONTRACTOR'S SIGNATURE DATE DIRECTOR'S SIGNATURE DATE 15 12/2019 ADJUSTMENTS CHANGE ORDER ESTIMATE IS HEREBY ❑INCREASED $ ❑DECREASED $ PAY THIS ADJUSTED AMOUNT: $. DIRECTOR'S SIGNATURE DATE 16 12/2019 EXHIBIT D NOTICE TO LABOR UNIONS OR OTHER EMPLOYMENT ORGANIZATIONS NONDISCRIMINATION IN EMPLOYMENT TO: (Name of Union or Organization) The undersigned currently holds contract(s) with involving funds or credit of the City of Federal Way, Washington, or (a) subcontract(s) with a prime contractor holding such contract(s). You are advised that, under the provisions of the above contract(s) or subcontract(s) and in accordance with Section 202 of Executive Order 11246 dated September 24, 1965, the undersigned is obliged not to discriminate against any employee or applicant of employment because of race, color, creed or national origin. This obligation not to discriminate in employment includes, but is not limited to, the following: EMPLOYMENT, UPGRADING, TRANSFER OR DEMOTION RECRUITMENT AND ADVERTISING RATES OF PAY OR OTHER FORMS OF COMPENSATION SELECTION FOR TRAINING INCLUDING APPRENTICESHIP, LAYOFF OR TERMINATION This notice is furnished to you pursuant to the provisions of the above contract(s) or subcontractor(s) and Executive Order 11246. Copies of this Notice will be posted by the undersigned in conspicuous places available to employees or applicants for employment. (Contractor or subcontractor) Date 17 12/2019 EXHIBIT E CERTIFICATE OF INSURANCE (SEE ATTACHED) 18 12/2019 Page 1 of 2 DATE(M M/DDIYYYY) CERTIFICATE OF LIABILITY INSURANCE 03/14/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CD!dTACT ItiAM=_. Willis of New York, Inc. - oHONN,Extt- 1-877-945-7378 P.O. Box 305191 ADDRESS: [a`� 1-888-967-2378 c/o 26 Century Blvd - L-Ivcertificates KE Nashville, TN 372305191 USA INSURER(S)AFFORDING COVERAGE NAIC# INSURER A: Zurich American Insurance Company 16535 INSURED INSURER B: NRC ENVIRONMENTAL SERVICES INC. --____-- 9520 10th Ave. s., suite 150 INSURER C Seattle, WA 98108 USA INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:W10452706 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR A[:Dl_SUER, POLICY EFF POLICY EXP TYPE OF INSURANCE LTR I SD''WVD POLICY NUMBER iMMIDDIYYYYJ (MMIDD/YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 GE.T RENTED 1,000,000 CLAIMS-MADE X OCCUR PREMISES(Eadccurnance)_.._ S A MED EXP(Any one person) S 25,000 GPLO122451-02 03/16/2019 03/16/2020 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE S 2,000,000 POLICY X ,Pj�j 0 LOC2,000,000 PRODUCTS-COMP/OP AGG S L}ili .R $ AUTOMOBILE LIABILITY COMBINED IN L LIMIT $ 1,000,000 Ea accident )( ANY AUTO BODILY INJURY(Per person) $ A OWNED SCHEDULED BAP0122462-02 03/16/2019 03/16/2020 BODILY INJURY(Per accident) S AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE. S AUTOS ONLY AUTOS ONLY Par aceidsnt 5 A UMBRELLA LAB X OCCUR EACH OCCURRENCE S 10,000,000 X EXCESS LAB CLAIMS-MADE SXS0122454-02 03/16/2019 03/16/2020 AGGREGATE $ 10,000,000 DED I I RETENTIONS $ WORKERS COMPENSATION X PER AND EMPLOYERS'LIABILITY STATUTE YIN 1,000,000 A OFFICEANYPROPRIETORIPARTNER/EXECUTIVE No NIA WC0122459-02 03/16/2019 03/16/2020 E.L.EACH ACCIDENT S OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E..L.DISEASE-EA EMPLOYEE S 1,000,000 If yes,describe under 1,000,000 DES RIPTION OF OPERATIONS below E,L.DISEASE-POLICY LIMIT $ A Contractors Equipment CPP0645396-01 03/16/2019 03/16/2020 Scheduled Equipment $16,023,279 Deductible $10,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) SEE ATTACHED CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE NRC Environmental Services Inc. 9520 10th Ave. S, Suite 150 �Q Seattle, WA 98108 4 ©1988-2016 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD SR ID: 17650179 BATCH: 1109969 AGENCY CUSTOMER ID: LOC#: At--"�RADDITIONAL REMARKS SCHEDULE Page 2 of 2 AGENCY NAMED INSURED Inc. NRC ENVIRONMENTAL SERVICES INC. Willis of New York, Inc _ 9520 10th Ave. S., Suite 150 POLICY NUMBER Seattle, WA 98108 USA See Page 1 CARRIER NAIC CODE See Page 1 See Page 1 EFFECTIVE DATE: See Page 1 ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance UNSCHEDULED LEASED, RENTED, OR BORROWED $ 350,000 PER ANY ONE ITEM EQUIPMENT $ 500,000 PER OCCURRENCE DEDUCTIBLE 5% SUBJECT TO A MINIMUM OF $25,000 PER OCCURRENCE Re: Evidence of Insurance. The Excess Policy is following form and in excess of all the above liability coverage. INSURER AFFORDING COVERAGE: Zurich American Insurance Company NAIC#: 16535 POLICY NUMBER: GPLO122451-02 EFF DATE: 03/16/2019 EXP DATE: 03/16/2020 TYPE OF INSURANCE: LIMIT DESCRIPTION: LIMIT AMOUNT: Professional Liability Each Claim: $1,000,000 Aggregate: $2,000,000 INSURER AFFORDING COVERAGE: Zurich American Insurance Company NAIC#: 16535 POLICY NUMBER: GPLO122451-02 EFF DATE: 03/16/2019 EXP DATE: 03/16/2020 TYPE OF INSURANCE: LIMIT DESCRIPTION: LIMIT AMOUNT: Contractors Pollution Liability Each Occurrence: $1,000,000 Aggregate: $2,000,000 ACORD 101 (2008/01) ©2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD SR ID: 17650179 BATCH: 1109969 CERT: W10452706 EXHIBIT F PREVAILING WAGE RATES (SEE ATTACHED) 19 12/2019 Exhibit F:Prevailing Wage Rates(as of December 11,2019) County Trade Job Classification Wage Holiday Overtime Notes King Asbestos Abatement Workers Journey Level S50.86 SD 1H King Boilermakers Journey Level 569.04 5N 1C King Brick Mason Jou rne Level 558 82 5A 1M King_ Brick Mason Pointer-Caulker-Cleaner ;5882 SA 11M Kin Building Service Employees Janitor 525.58 SS 2F King Building Service Employees Traveling Waxer/Shampooer $26.03 5S 2F King Building Service Employees Window Cleaner(Non-Scaffold) 29.33 55 2F King Building Service Employees Window Cleaner(Scaffold) S30.33 55 2F King Cabinet Makers(In Shop) Journey Level $22.74 1 King Carpenters Acoustical Worker 562.44 7A 4C Kin Carpenters Carpenter S62.44 17A 4C King Carpenters Carpenters on Stationary Tools $62.57 7A 4C King Carpenters Creosoted Material 562.54 7A 4C .King Carpenters Floor Finisher $62.44 7A 4C King Carpenters Floor Layer S62.44 7A 4C King Carpenters Scaffold Erector $62.44 7A 4C King Cement Masons Application of all Composition Mastic $62.97 7A 4U King I Cement Masons Application of all Epoxy Material $62.47 7A 4U King Cement Masons Application of all Plastic Material $62.97 7A 4U King Cement Masons Application of Sealing Compound S62.47 7A 4U King Cement Masons Application ofUnderla meat 'x62.97 7A 4U King Cement Masons Building General 562.47 7A 4U King Cement Masons Composition or Kalman Floors S62.97 7A 4U King Cement Masons Concrete Paving 'x62.47 17A 4U King Cement Masons Curb&Gutter Machine 562.97 17A 4U King Cement Masons Curb&Gutter.Sidewalks $62.47 7A 4U King Cement Masons Curing Concrete 562.47 7A 4U King Cement Masons Finish Colored Concrete $62.97 7A 4U King Cement Masons Floor Grinding $62.97 7A 4U King Cement Masons Floor Grinding/Polisher $62.47 7A 4U King Cement Masons Green Concrete Saw,self-powered $6297 7A 4U King Cement Masons Grouting of all Plates $62.47 7A 4U Kin Cement Masons Grouting of all Tilt-up Panels $62.47 17A 4U Kin Cement Masons Gunite Nozzleman $62.97 17A 4U Kin Cement Masons Hand Powered Grinder 562.97 7A 4U Kin Cement Masons Journey Level 562.47 7A 4U Kin Cement Masons Patching Concrete $62.47 7A 4u King Cement Masons Pneumatic Power Tools S62.97 7A 4U King Cement Masons Power Chipping&Brushing S62 97 7A 4U King Cement Masons Sand Blasting Architectural Finish $62.97 7A 4U King Cement Masons Screed&Rodding Machine 562.97 7A 4U King Cement Masons Spackling or Skim Coat Concrete $62.47 7A 4U KinE Cement Masons Troweling Machine Operator $62.97 7A 4U King Cement Masons Troweling Machine Operator on Colored Slabs $6297 7A 4U King Cement Masons Tunnel Workers S62.97 7A 4U King Divers&Tenders Bell/Vehicle or Submersible Operator(Not Under Pressure) $116.20 7A 14C King Divers&Tenders Dive Supervisor/Master 579.23 7A 4C King Divers&Tenders Diver 5116.20 7A 4C 8V King Divers&Tenders Diver On Standby 574.23 7A 4C King Divers&Tenders Diver Tender S67.31 7A 4C King Divers&Tenders Manifold Operator $67.31 7A 4C King Divers&Tenders Manifold Operator Mixed Gas 572.31 7A 4C Kine Divers&Tenders Remote Operated Vehicle Operator/Technician $67.31 7A 4C King Divers&Tenders Remote 0 erated Vehicle Tender S62.69 7A 4C King Dredge Workers Assistant Engineer S56.44 SD 3F King Dredge Workers Assistant Mate(Deckhand) $56.00 SD 3F King Dredge Workers Boatmen S56.44 SD 3F King Dredge Workers Engineer Welder $57.51 SD 3F King Dredge Workers Leverman,Hydraulic $58.67 51) 3F King Dredge Workers Mates S56.44 SD 3F Kin& Dredge Workers Oiler $56.00 SD 3F King Drywall Applicator Journey Level 562.44 15D 1H King Drywall Tapers Journey Level $62.94 SP lE King Electrical Fixture Maintenance Workers lourney Level $30.59 15L lE King Electricians-Inside Cable Splicer 583.17 17C 4E King Electricians-Inside Cable Splicer(tunnel) 89.34 7C 4E King Electricians-Inside Certified Welder $80.36 7C 4E King Electricians-Inside Certified Welder(tunnel) $86.25 7C 4E King Electricians-Inside Construction Stock Person $41.48 7C 4E King Electricians-Inside Journey Level $77.55 7C 4E Kine Electricians-Inside Journey Level(tunnel) 583.17 7C 4E King jElectricians-Motor Shop Journey Level $45.08 5A 1B Kin Electricians-Powerline Construction Cable Splicer $79.60 5A 4D King Electricians-Powerline Construction Certified Line Welder $7298 ISA 4D King Electricians-Powerline Construction Groundperson 547.94 SA 4D King Electricians-Powerline Construction Heavy Line Equipment Operator $72.98 5A 4D King Electricians-Powerline Construction Journey Level Lineperson $72.98 SA 4D King Electricians-Powerline Construction Line Equipment Operator 562.06 5A 4D King Electricians-Powerline Construction Meter Installer $47.94 5A 4D 8W King Electricians-Powerline Construction Pole Sprayer 572.98 SA 4D King Electricians-Powerline Construction Powderperson $54.55 ISA 4D King jElectronic Technicians Journey Level 551.07 7E lE King Elevator Constructors Mechanic $94.22 7D 4A King Elevator Constructors Mechanic In Charge $101.73 7D 4A King Fabricated Precast Concrete Products All Classifications-In-Factory Work Only 518.25 5B 1R Kin& Fence Erectors Fence Erector $43.11 7A 4V 8Y King Fence Erectors Fence Laborer $43.11 7A 4V SY King Flaggers Journey Level $43.11 7A 4V BY King lGlaziers Journey_Level $66.51 71. lY King Heat&Frost Insulators And Asbestos Workers Journeyman $76.61 SJ 4H King Heating Equipment Mechanics Journey Level $85.88 7F lE King Hod Carriers&Mason Tenders Journey Level 552.44 7A 4V 8Y King Industrial Power Vacuum Cleaner Journey Level $12.00 1 King Inland Boatmen Boat Operator $61.41 58 1K King Inland Boatmen Cook 556.48 15B 1K King Inland Boatmen Deckhand $57.48 SB 1K King Inland Boatmen Deckhand Engineer 558.81 5B 1K King Inland Boatmen Launch Operator $58.89 SB 1K King Inland Boatmen Mate $57.31 5B 1K King Inspection/Cleaning/Sealing Of Sewer&Water Cleaner Operator,Foamer Operator $31.49 1 Systems By Remut2 Control King Inspection/Cleaning/Sealing Of Sewer&Water Grout Truck Operator $12.00 1 Systems By Remote Control King Inspection/Cleaning/Sealing Of Sewer&Water Head Operator $24.91 1 Systems By Remote Control King Inspection/Cleaning/Sealing Of Sewer&Water Technician $19.33 1 Systems By Remote Control King Inspection/Cleaning/Sealing Of Sewer&Water Tv Truck Operator $20.45 1 5 stems By Remote Control King Insulation Applicators Journey Level $62.44 7A 4C King Ironworkers Journeyman $72.18 7N 10 King Laborers Air,Gas Or Electric Vibrating Screed $50.86 7A 4V SY King Laborers Airtrac Drill Operator $52.44 7A 4V 8Y King Laborers Ballast Regular Machine $50.86 7A 4V BY King Laborers Batch Wei hman 543.11 7A 4V 8Y King Laborers Brick Pavers $50.86 7A 4V 8Y Kin Laborers Brush Cutter $50.86 7A 4V 8y Kin Laborers Brush Hog Feeder 550.86 7A 4V By King Laborers Burner 550.86 7A 4V 8y King Laborers Caisson Worker $52.44 7A 4V 8Y King Laborers Carpenter Tender SS0.86 7A 4V 8Y Xing Laborers Cement Dumper-paving $51.80 7A 4V 8Y Kin Laborers Cement Finisher Tender S5086 7A 4V BY King Laborers Change House Or Dry Shack $50.86 7A 4V BY Kin Laborers Chipping Gun(30 Lbs.And Over) 551.80 17A 4V BY Kin Laborers Chipping Gun(Under 30 Lbs.) $50.86 7A 4V 8y King Laborers Choker Setter $50.86 7A 4V SY King Laborers Chuck Tender 550.86 7A 4V SY King Laborers Clary Power Spreader $51.80 7A 4V 8Y King Laborers Clean-up Laborer $50.86 7A 4V 8Y King Laborers Concrete Dumper/Chute Operator 551.80 7A 4V 8Y King Laborers Concrete Form Stripper $50.86 7A 4V 8y King Laborers Concrete Placement Crew 551.80 7A 4V BY King Laborers Concrete Saw Operator/Core Driller $51.80 7A 4V 8Y Kin Laborers Crusher Feeder 1 $43.11 17A 14V 8Y King Laborers Curing Laborer 550.86 17A 4V SY King Laborers Demolition:Wrecking&Moving(Incl.Charred Material) $50.86 7A 4V 8Y King Laborers Ditch Digger 550.86 7A 4V BY Kin Laborers Diver $52.44 7A 4V SY King Laborers Drill Operator(Hydraulic,Diamond) $51.80 7A 4V BY King Laborers Dry Stack Walls SSO.R6 7A 4V BY King IlLaborers Dump Person 550.86 7A 4V SY E�n Laborers Epoxy Technician $50.86 7A 4V 8Y Laborers Erosion Control Worker 550.86 7A 4V 8Y Laborers Faller&Bucker Chain Saw 551.80 7A 4V 8Y Laborers Fine Graders $50.86 7A 4V 8Y Laborers Firewatch 543.11 7A 4V 8Y Laborers Form Setter $50.86 7A 4V 8Y Kin Laborers Gabian Basket Builders 550.86 7A 4V 8Y Kin Laborers General Laborer SSO.86 7A 4V SY Kin Laborers Grade Checker&Transit Person 552.44 7A 4V BY Kin Laborers Grinders 550.86 7A 4V 8Y Kin Laborers Grout Machine Tender $50.86 7A 4V 8Y Kin Laborers Groutmen(Pressure)Including Post Tension Beams 551.80 7A 4V 8Y Kin Laborers Guardrail Erector SS0.86 7A 4V 8Y King Laborers Hazardous Waste Worker(Level A) $52.44 7A 4V 8Y King Laborers Hazardous Waste Worker(Level B) S5180 7A 4V BY king Laborers Hazardous Waste Worker(Level Q 550.86 17A 4V 8Y King Laborers High Scaler 552.44 17A 4V BY King Laborers Jackhammer $51.80 17A 4V BY Kin& Laborers Laserbeam Operator 551.80 17A 4V BY King Laborers Maintenance Person S5086 17A 14V 8Y King IlLaborers Manhole Builder-Mudman $51.80 7A 4V 8Y rKing Laborers Material Yard Person 550.86 7A 4V 8Y Laborers Motorman-Dinky Locomotive $51.80 7A 4V 8Y Laborers Nozzleman(Concrete Pump,Green Cutter When Using $51.80 7A 4V 8Y Combination Of High Pressure Air&Water On Concrete& Rock,Sandblast,Gunite,Shotcrete,Water Blaster,Vacuum Blaster)nLaborers Pavement Breaker $51.80 17A 4V 18Y King Laborers Pilot Car $43.11 J7A 4V 8Y Kin Laborers Pipe Layer Lead $52.44 7A 4V 8Y Kin Laborers Pipe Layer/Tailor $51.80 7A 4V 8Y Kin Laborers Pipe Pot Tender $51.80 7A 4V 8Y Kin Laborers Pipe Reliner $51.80 7A 4V 8Y Kin Laborers Pipe Wrapper 551.80 7A 4V SY King Laborers Pot Tender $50.86 7A 4V BY Kin Laborers Powderman $52.44 7A 4V 18Y King Laborers Powderman's Helper 550.86 17A 4V ISY King Laborers Power Jacks $51.80 17A 4V IBY King Laborers Railroad Spike Puller-Power 551.80 17A 4V 8Y King Laborers Raker-Asphalt $52.44 7A 4V 8Y King lLaborers Re-timberman $52.44 7A 4V 8Y King IlLaborers Remote Eauipment Operator 551.80 7A 4V 8Y Kin Laborers Rigger/Signal Person $51.80 7A 4V 8Y Kin-g IlLaborers RiD Rap Person $50.86 7A 4V 8Y Kin Laborers I Rivet Buster $51.80 7A 4V SY Kin Laborers IRodder $51.80 7A 4V 8Y Kin Laborers Scaffold Erector SSO.86 7A 4V 8Y Kin Laborers Scale Person $50.86 7A 4V 8Y Kin Laborers Sloper(Over 20)" $51.80 7A 4V 8Y King Laborers Sloper Sprayer $50.86 7A 4V 8Y King Laborers Spreader(Concrete) 551.80 7A 4V 18Y King IlLaborers Stake Hooper $50.86 17A 4V SY King Laborers Stock Piler SSO.86 7A 4V IBY King Laborers Swinging Sta a/Boatswain Chair 543.11 7A 4V 8Y King Laborers Tamper&Similar Electric,Air&Gas Operated Tools $51.80 7A 4V SY King Laborers Tamper(Multiple&Self-propelled) 551.80 7A 4V SY king Laborers Timber Person-Sewer(Lagger,Shorer&Cribber) 551.80 7A 4V 8Y Kina Laborers Toolroom Person(at Jobsite) $50.86 7A 4V 8Y Kin Laborers Topper $50.86 7A 4V 8Y King laborers Track Laborer 550.86 7A 4V 8Y King Laborers Track Liner(Power) $51.80 7A 4V 8Y King Laborers Traffic Control Laborer $46.10 7A 4V 9C Kin Laborers Traffic Control Supervisor 546.10 7A 4V 9C Kin Laborers Truck Spotter $50.86 7A 4V 8Y King Laborers Tugger Operator 551.80 7A 14V 8Y Kin Laborers Tunnel Work-Compressed Air Worker 0-30 psi $120.61 7A 4V 9B Kin Laborers Tunnel Work-Compressed Air Worker 30.01-44.00 psi 5125.64 7A 4V 9B Kin Laborers Tunnel Work-Compressed Air Worker 44.01-54.00 psi 5129.32 7A 4V 9B Kin Laborers Tunnel Work-Compressed Air Worker 54.01-60-00 psi 5135.02 7A 4V 96 Kin Laborers Tunnel Work-Compressed Air Worker 60.01-64.00 psi $137.14 7A 4V 9B Kin Laborers Tunnel Work-Compressed Air Worker 64.01-68.00 psi 5142.24 7A 4V 9B Kin Laborers Tunnel Work-Compressed Air Worker 68.01-70.00 psi $144.14 7A 4V 9B King Laborers Tunnel Work-Compressed Air Worker 70.01-72.00 psi $146.14 7A 4V 9B Kin Laborers Tunnel Work-Compressed Air Worker 72.01-74.00 psi 5148.14 7A 4V 9B Kin Laborers Tunnel Work-Guage and Lock Tender 552.54 7A 4V 8y Kin Laborers Tunnel Work-Miner $52 54 7A 4V 8Y Kin Laborers Vibrator $51.80 7A 4V 8Y Kin Laborers Vinyl Seamer 550.86 17A 14V 8Y Kin Laborers Watchman $39.18 7A 4V 8Y King Laborers Welder $51.80 7A 4V 8Y Kin Laborers Well Point Laborer $51-80 7A 4V SY King Laborers Window Washer/Cleaner 539.18 7A 4V BY King Laborers-Underground Sewer&Water General Laborer&To man $50.86 7A 4V BY King Laborers-Underground Sewer&Water Pipe Layer $51.80 7A 4V 8Y King Landscape Construction Landscape Construction/Landscaping Or Planting Laborers $39.18 7A 4V 8Y King Landscape Construction Landscape Operator 568.02 7A 3K HX King Landscape Maintenance Groundskeeper $17.87 1 King Lathers Journey Level 562.44 SD 1H Kin Marble Setters Journey Level $58.82 5A 1M King Metal Fabrication(In Shop) Fitter $15.86 1 Kin IM 1,1 l Fabrication{'n Slrapl Laborer $12.00 1 Kin `_fetal 1--i kir raii;n;:in Shop) Machine Operator $13.04 1 King Metal Fabrication(In Shop_) Painter $12.00 1 Kin Metal Faur�[at4on iln'nF-::,,1 Welder 515.48 1 King Millwright Journey Level 563.94 7A 4C King Modulai Cabinet Assembly $12.00 1 King Modular Buildings Electrician 512.00 1 King Modular Buildings Equipment Maintenance $12.00 1 King Modular Buildings Plumber $12.00 1 King Modular Buildings Production Worker $12.00 1 King Modular Buildings lTool Maintenance $12.00 1 King Modular Buildings Utilitv Person $12.00 1 Kin Modular Buildings Welder $12.00 1 King Painters Journey Level 543.40 6Z 213 Kin Pile Driver Crew Tender $67.31 7A 4C Kin Pile Driver Crew Tender/Technician 567.31 7A 4C King Pile Driver Hyperbaric Worker-Compressed Air Worker 0-30.00 PSI $77.93 7A 4C King Pile Driver Hyperbaric Worker Compressed Air Worker 30.01-44.00 $82.93 7A 4C PSI King Pile Driver Hyperbaric Worker-Compressed Air Worker 44.01-54.00 $86.93 7A 4C PSI King Pile Driver Hyperbaric Worker-Compressed Air Worker 54.01-60.00 $91.93 7A 4C PSI King Pile Driver Hyperbaric Worker-Compressed Air Worker 60.01-64.00 $94.43 7A 4C PSI King Pile Driver Hyperbaric Worker-Compressed Air Worker 64.01-68.00 $99.43 7A 4C PSI King Pile Driver Hyperbaric Worker-Compressed Air Worker 68.01-70.00 $101.43 7A 4C PSI King Pile Driver Hyperbaric Worker-Compressed Air Worker 70.01-72.00 $103.43 7A 4C PSI King Pile Driver Hyperbaric Worker-Compressed Air Worker 72.01-74.00 $105.43 7A 4C PSI King Pile Driver Journey Level $62.69 17A 4C King Plasterers Journey Level $59-42 17CL 1R King Playground&Park Equipment Installers Journey Level 512.00 1 Kin Plumbers&Pipefitters Journey Level $87.69 6Z 1G King P;rae:rr Ec.u,pment Asphalt Plant Operators $69.16 7A 3K 8X King Power Equipment Operators Assistant Engineer 565.05 7A 3K 8X King Power Equipment Operators Barrier Machine(zipper) $68.55 7A 3K 8X King Power Equipment Operators Batch Plant Operator:concrete $68.55 7A 3K 8X King Power Equipment Operators Bobcat 565.05 7A 3K 8X King Power Equipment Operators Brokk-Remote Demolition Equipment $65.05 7A 3K 8X King Power Equipment Operators Brooms 565.05 7A 3K SX King Power Equipment Operators Bump Cutter 568.55 7A 3K 8X Kine Power Equipment Operators Cableways 569.16 7A 3K 8X King Power Equipment Operators Chipper 568.55 7A 3K 8X King Power Equipment Operators Compressor $65.05 7A 3K 8X Kine Power Equipment Operators Concrete Finish Machine-Laser Screed 565.05 7A 3K SX King Power Equipment Operators Concrete Pump-Mounted Or Trailer High Pressure Line $68.02 7A 3K 8X Pump,Pump High Pressure King Power Equipment Operators Concrete Pump:Truck Mount With Boom Attachment Over $69.16 7A 3K SX 42 M King Power Equipment Operators Concrete Pump:Truck Mount With Boom Attachment Up $68.55 7A 3K 8X To 42m Kin Power Equipment 0 erators Conveyors $68.02 7A 3K BX Kin Power Equipment Operators Cranes friction:200 tons and over 571.26 7A 3K 8X King Power Equipment Operators Cranes:100 tons through 199 tons,or 1506CTM of boom $69.85 7A 43K 8X includin 'ib with attachments) Kin Power Equipment Operators Cranes:20 Tons Through 44 Tons With Attachments $68.5S 7A 3K SX King Power Equipment Operators Cranes:200 tons-299 tons,or 2506€'"of boom including $70.57 7A 3K SX 'ib with attachments King Power Equipment Operators Cranes:300 tons and over or 3006€'"of boom including jib $71.26 7A 3K 8X with attachments King Power Equipment Operators Cranes:45 Tons Through 99 Tons,Under 150'Of Boom $69.16 7A 3K 8X (includink Jib With Attachments) King Power Equipment Operators Cranes:A-frame-10 Tons And Under 565.05 7A 3K 8X King Power Equipment Operators Cranes:Friction cranes through 199 tons $70.57 7A 3K 8X King Power Equipment Operators Cranes:through 19 tons with attachments,A-frame over $68.02 7A 3K 8X 10 tons King Power Equipment Operators Crusher $68.55 7A 3K 8X Kin& Power Equipment Operators Deck Engineer/Deck Winches(power) $68.55 7A 3K 8X King Power Equipment Operators Derricks,On Building Work $69.16 7A 3K 8X King Power Equipment Operators Dozers D-9&Under $68.02 7A 3K SX King Power Equipment Operators Drill Oilers:Auger Type,Truck Or Crane Mount $68.02 7A 3K 8X King Power Equipment Operators Drilling Machine $69.85 7A 3K SX King Power Equipment Operators Elevator And Man-lift:Permanent And Shaft Type $65.05 7A 3K SX King Power Equipment Operators Finishing Machine,Bidwell And Gamaco&Similar $68.55 7A 3K 8X Equipment King Power Equipment Operators Forklift:3000 Lbs And Over With Attachments 68.02 7A 3K 8X King Power Equipment Operators Forklifts:Under 3000 Lbs.With Attachments $65.05 7A 3K BX King Power Equipment Operators Grade Engineer:Using Blue Prints,Cut Sheets,Etc $68.55 7A 3K SX King Power Equipment Operators Gradechecker/Stakeman $65.05 7A 3K SX King Power Equipment Operators Guardrail Punch $68.55 7A 3K BY King Power Equipment Operators Hard Tail End Dump Articulating Off-Road Equipment 45 $69.16 7A 3K 8X Yards.&Over King Power Equipment Operators Hard Tail End Dump Articulating Off-road Equipment Under $68.55 7A 3K 8X 45 Yards Kin Power Equipment Operators Horizontal/Directional Drill Locator 568.02 7A 3K 8X Kin Power Equipment Operators Horizontal/Directional Drill Operator $68.55 7A 3K 8X Kin Power E ul ment Operators Hydralifts/Boom Trucks Over 10 Tons $68.02 7A 3K 8X Kin Power Equipment Operators Hydralifts/Boom Trucks,10 Tons And Under 565.05 7A 3K 8X King Power Equipment 0 erators Loader,Overhead 8 Yards.&Over $69.85 7A 3K 8X King Power Equipment Operators Loader,Overhead,6 Yards.But Not Including 8 Yards 569.16 7A 3K 8X King Power Equipment Operators Loaders.Overhead Under 6 Yards $68.55 17A 3K SX King Power Equipment Operators Loaders,Plant Feed 568.55 7A 3K l8X King Power Equipment Operators Loaders:Elevating Type Belt $68.02 7A 3K 18X King Power Equipment Opo stars Locomotives,All $68.55 7A 3K 8X King Power Equipment Operators Material Transfer Device $68.55 7A 3K SX King Power Equipment Operators Mechanics,All(leadmen-$0.50 Per Hour Over Mechanic) $69.85 7A 3K 8X King Power Equipment Operators Motor Patrol Graders $69 16 7A (3K SX King Power Equipment Operators Mucking Machine,Mole,Tunnel Drill,Boring,Road Header $69.16 7A 3K 8X And/or Shield King Power Equipment Operators Oil Distributors,Blower Distribution&Mulch Seeding $65.05 7A 3K 8X Operator King Power Equipment Operators Outside Hoists(Elevators And Manlifts),Air Tuggers,Strato $68.02 7A 3K 8X King Power Equipment Operators Overhead,Bridge Type Crane:20 Tons Through 44 Tons $68.55 7A 3K 8X Kin Power Equipment Operators Overhead,Bridge Type:100 Tons And Over 1 $69.85 17A 13K 8X Kin Power Equipment Operators Overhead,Bridge Type:45 Tons Through 99 Tons $69.16 17A 13K 8X Kin Power Equipment Operators Pavement Breaker $65.05 7A 13K 8X Kin Power Equipment Operators Pile Driver(other Than Crane Mount) $68.55 17A j3K 8X King Power Eauipment Operators Plant Oiler-Asphalt,Crusher $68.02 7A 3K 8X King Power Equipment Operators Posthole Digger,Mechanical $65.05 7A 3K 8X King Power Eauipment Operators Power Plant $65.05 7A 3K 8X KinE Power Equipment Operators Pumps-Water 565.05 7A 3K SX King Power Equipment Operators Quad 9,Hd 41,D10 And Over $69.16 7A 3K 8X King Power Equipment Operators Quick Tower-No Cab,Under 100 Feet In Height Based To $65.05 7A 3K 8X Boom King Power Equipment Operators Remote Control Operator On Rubber Tired Earth Moving $69.16 7A 3K 8X Equipment King IPower Equipment Operators Rigger and Bellman $65.OS 7A 3K 8X Kin Power Equipment Operators Rigger/Signal Person,Bellman(Certified) $68.02 7A 3K 8X Kin Power Eauipment Operators Rollagon 569.16 7A 3K 8X Kin Power Equipment Operators Roller,Other Than Plant Mix 565.05 7A 3K 8X Kin Power Equipment Operators Roller,Plant Mix Or Multi-lift Materials 568.02 7A 3K 8X Kin Power Equipment Operators Roto-mill,Roto-grinder $68.55 7A 3K 8X Kin Power Equipment Operators Saws-Concrete $68.02 7A 3K 8X King Power Eauipment Operators Scraper.Self Propelled Under 45 Yards 568.55 7A 3K 8X King Power Equipment Operators Scrapers-Concrete&Carry All 568.02 7A 3K 8X King Power Eauipment Operators Scrapers,Self-pro elled:45 Yards And Over $69.16 7A 3K SX King Power Equipment Operators Service Engineers-Equipment $68.02 7A 3K 8X Kin5 Power Equipment Operators Shotcrete/Gunite Equipment 565.05 7A 3K 8X King Power Equipment Operators Shovel,Excavator,Backhoe,Tractors Under 15 Metric $68.02 7A 3K 8X Tons King Power Equipment Operators Shovel,Excavator,Backhoe:Over 30 Metric Tons To 50 $69.16 7A 3K 8X Metric Tons King Power Equipment Operators Shovel,Excavator,Backhoes,Tractors:IS To 30 Metric $68.55 7A 3K 8X Tons King Power Equipment Operators Shovel,Excavator,Backhoes:Over 50 Metric Tons To 90 $69.85 7A 3K 8X Metric Tans Kin Power Equipment Operators Shovel,Excavator,Backhoes:Over 90 Metric Tons $70.57 7A 3K 8X Kin Power Equipment Operators Slipform Pavers $69.16 7A 3K 8X King jPower Equipment Operators Spreader,Topsider&Screedman 569.16 7A 3K 8X King IPower Equipment Operators Subgrader Trimmer $68.55 7A 3K 8X King I Power Equipment Operators Tower Bucket Elevators 568-02 17A 3K 8X King I Power Equipment Operators Tower Crane Up To 175'In Height Base To Boom $69.85 7A 3K 8X King Power Equipment Operators Tower Crane:over 1755€'"through 2505€"in height,base $70.57 7A 3K 8X to boom King Power Equipment Operators Tower Cranes:over 250ACTM in height from base to boom $71.26 7A 3K 8X King Power Equipment Operators Transporters,All Track Or Truck Type $69.16 7A 3K JBX King Power Equipment Operators Trenching Machines $68.02 7A 3K SX King I Power Eoui ment Operators Truck Crane Oiler/driver-100 Tons And Over $68.55 7A 3K By Kine I Power Equipment Operators Truck Crane Oiler/Driver Under 100 Tons $68.02 7A 3K BX Pn Power Equipment Operators Truck Mount Portable Conveyor $68.55 7A 3K RX Power Equipment Operators Welder $69.16 7A 3K 8X Power Equipment Operators Wheel Tractors,Farmall Type $65.05 7A 3K 8X Power Equipment Operators Yo Yo Pay Dozer 568.55 7A 3K 8X Power Equipment Operators-Underground Sewer& Asphalt Plant Operators $69.16 7A 3K 8X Water Power Equipment Operators-Underground Sewer& Assistant Engineer $65.OS 7A 3K BX Water King Power Equipment Operators-Underground Sewer& Barrier Machine(zipper) $68.55 7A 3K 8X 'Water King Power Equipment Operators-Underground Sewer& Batch Plant Operator,Concrete $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Bobcat $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Brokk-Remote Demolition Equipment $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Brooms $65.05 7.A 3K 8X Water King Power Equipment Operators-Underground Sewer& Bump Cutter $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Cableways $69.16 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Chipper $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Compressor $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Concrete Finish Machine-Laser Screed $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Concrete Pump-Mounted Or Trailer High Pressure Line $68.02 7A 3K 8X Water Pump,Pump High Pressure King Power Equipment Operators-Underground Sewer& Concrete Pump:Truck Mount With Boom Attachment Over $69.16 7A 3K 8X Water 42M King Power Equipment Operators-Underground Sewer& Concrete Pump:Truck Mount With Boom Attachment Up $68.55 7A 3K 8X Water To 42m King Power Equipment Operators-Underground Sewer& Conveyors $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Cranes friction:200 tons and over $71.26 7A 3K SX Water King Power Equipment Operators-Underground Sewer& Cranes:100 tons through 199 tons,or 1505€"of boom $69.85 7A 3K 8X Water (including jib with attachments) King Power Equipment Operators-Underground Sewer& Cranes:20 Tons Through 44 Tons With Attachments $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Cranes:200 tons-299 tons,or 2505€"of boom including $70.57 7A 3K 8X Water jib with attachments King Power Equipment Operators-Underground Sewer& Cranes:300 tons and over or 3005€'"of boom including jib $71.26 7A 3K BX Water with attachments King Power Equipment Operators-Underground Sewer& Cranes:45 Tons Through 99 Tons,Under 150'Of Boom $69.16 7A 3K 8X Water (including Jib With Attachments) King Power Equipment Operators-Underground Sewer& Cranes:A-frame-10 Tons And Under $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Cranes:Friction cranes through 199 tons $70.57 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Cranes:through 19 tons with attachments,A-frame over $68.02 7A 3K 8X Water 10 tons King Power Equipment Operators-Underground Sewer& Crusher $68.55 7A 3K 8X W ater King Power Equipment Operators-Underground Sewer& Deck Engineer/Deck Winches(power) $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Derricks,On Building Work $69.16 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Dozers D-9&Under $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Drill Oilers:Auger Type,Truck Or Crane Mount $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Drilling Machine $69.85 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Elevator And Man-lift:Permanent And Shaft Type $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Finishing Machine,Bidwell And Gamaco&Similar $68.55 7A 3K 8X Water Equipment King Power Equipment Operators-Underground Sewer& Forklift:3000 Lbs And Over With Attachments $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Forklifts:Under 3000 Lbs.With Attachments $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Grade Engineer:Using Blue Prints,Cut Sheets,Etc $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Gradechecker/Stakeman $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Guardrail Punch $68.55 7A 3K 8X W ater King Power Equipment Operators-Underground Sewer& Hard Tail End Dump Articulating Off-Road Equipment 45 $69.16 7A 3K 8X Water Yards.&Over King Power Equipment Operators-Underground Sewer& Hard Tail End Dump Articulating Off-road Equipment Under $68.55 7A 3K 8X Water 45 Yards King Power Equipment Operators-Underground Sewer& Horizontal/Directional Drill Locator $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Horizontal/Directional Drill Operator $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Hydralifts/Boom Trucks Over 10 Tons $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Hydralifts/Boom Trucks,10 Tons And Under $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Loader,Overhead 8 Yards.&Over $69.85 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Loader,Overhead,6 Yards.But Not Including 8 Yards $69.16 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Loaders,Overhead Under 6 Yards $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Loaders,Plant Feed $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Loaders:Elevating Type Belt $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Locomotives,All $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Material Transfer Device $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Mechanics,All(leadmen-$0.50 Per Hour Over Mechanic) $69.85 7A 3K 8X water King Power Equipment Operators-Underground Sewer& Motor Patrol Graders $69.16 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Mucking Machine,Mole,Tunnel Drill,Boring,Road Header $69.16 7A 3K 8X Water And/or Shield King Power Equipment Operators-Underground Sewer& Oil Distributors,Blower Distribution&Mulch Seeding $65.05 7A 3K 8X Water Operator King Power Equipment Operators-Underground Sewer& Outside Hoists(Elevators And Manlifts),Air Tuggers,Strato $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Overhead,Bridge Type Crane:20 Tons Through 44 Tons $68.SS 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Overhead,Bridge Type:100 Tons And Over $69.85 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Overhead,Bridge Type:45 Tons Through 99 Tons $69.16 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Pavement Breaker $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Pile Driver(other Than Crane Mount) $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Plant Oiler-Asphalt,Crusher $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Posthole Digger,Mechanical $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Power Plant $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Pumps-Water $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Quad 9,Hd 41,D10 And Over $69.16 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Quick Tower-No Cab,Under 100 Feet In Height Based To $65.05 7A 3K 8X Water Boom King Power Equipment Operators-Underground Sewer& Remote Control Operator On Rubber Tired Earth Moving $69.16 7A 3K 8X Water Equipment King Power Equipment Operators-Underground Sewer& Rigger and Bellman $65.05 7A 3K 8X water King Power Equipment Operators-Underground Sewer& Rigger/Signal Person,Bellman(Certified) $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Rollagon $69.16 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Roller,Other Than Plant Mix $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Roller,Plant Mix Or Multi-lift Materials $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Roto-mill,Roto-grinder $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Saws-Concrete $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Scraper,Self Propelled Under 45 Yards $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Scrapers-Concrete&Carry All $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Scrapers,Self-propelled:45 Yards And Over $69.16 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Service Engineers-Equipment $68.02 7A 3K BX Water King Power Equipment Operators-Underground Sewer& Shotcrete/Gunite Equipment $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Shovel,Excavator,Backhoe,Tractors Under 15 Metric $68.02 7A 3K 8X Water Tons King Power Equipment Operators-Underground Sewer& Shovel,Excavator,Backhoe:Over 30 Metric Tons To SO $69.16 7A 3K SX Water Metric Tons King Power Equipment Operators-Underground Sewer& Shovel,Excavator,Backhoes,Tractors:15 To 30 Metric $68.55 7A 3K 8X Water Tons King Power Equipment Operators-Underground Sewer& Shovel,Excavator,Backhoes:Over 50 Metric Tons To 90 $69.85 7A 3K SX Water Metric Tons King Power Equipment Operators-Underground Sewer& Shovel,Excavator,Backhoes:Over 90 Metric Tons $70.57 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Slipform Pavers $69.16 7A 3K BX Water King Power Equipment Operators-Underground Sewer& Spreader,Topsider&Screedman $69.16 7A 3K BX Water King Power Equipment Operators-Underground Sewer& Subgrader Trimmer $68.55 7A 3K SX Water King Power Equipment Operators-Underground Sewer& Tower Bucket Elevators $68.02 7A 3K BX Water King Power Equipment Operators-Underground Sewer& Tower Crane Up To 175'In Height Base To Boom $69.85 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Tower Crane:over 1756€"through 250SC"in height,base $70.57 7A 3K 8X Water to boom King Power Equipment Operators-Underground Sewer& Tower Cranes:over 2505€'"in height from base to boom $71.26 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Transporters,All Track Or Truck Type $69.16 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Trenching Machines $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Truck Crane Oiler/driver-100 Tons And Over $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Truck Crane Oiler/Driver Under 100 Tons $68.02 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Truck Mount Portable Conveyor $68.55 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Welder $69.16 7A 3K SX Water King Power Equipment Operators-Underground Sewer& Wheel Tractors,Farmall Type $65.05 7A 3K 8X Water King Power Equipment Operators-Underground Sewer& Yo Yo Pay Dozer $68.55 7A 3K 8X Water King Power Line Clearance Tree Trimmers Journey Level In Charge $50.96 SA 4A King 1power Line Clearance Tree Trimmers Spray Person $48.35 SA 4A King Power Line Clearance Tree Trimmers Tree Equipment Operator $50.96 5A 4A King Power Line Clearance Tree Trimmers Tree Trimmer $45.54 5A 4A King Power Line Clearance Tree Trimmers Tree Trimmer Groundperson 534.51 5A 4A King Refrigeration&Air Conditioning Mechanics Journey Level $82.51 6Z 1G King Residential Brick Mason Journey Level $58.82 5A 1M King Residential Carpenters Journey Level 532.06 1 King Residential Cement Masons Journey Level $29.25 1 King lResidential Drywall Applicators Journey Level $46.43 7A 4C King Residential Drywall Tapers Journey Level 547,17 SP lE King Residential Electricians Journey Level 536.01 1 King Residential Glaziers lournev Level S44.15 7L 1H King Residential Insulation Applicators Journey Level $29.87 1 King Residential Laborers Ilournev Level $26.18 1 King Residential Marble Setters lournev Level $2738 1 King lResidential Painters (Journey Level $27.80 1 1 King lResidential Plumbers&Pipefitters Journev Level 539.43 1 King Residential Refrigeration&Air Conditioning Mechanics Journey Level $54.12 5A 1G King Residential Sheet Metal Workers Journey Level(Field or Shop) $51.89 7F 1R King Residential Soft Floor Layers Journey Level $51.07 SA 31 King Residential Sprinkler Fitters(Fire Protection) Journey Level 548.18 SC 12R King Residential Stone Masons Journey Level $58.82 SA 1M King Residential Terrazzo Workers Journey Level 554.06 5A 1M King Residential Terrazzo/Tile Finishers Journey Level $24.39 1 King Residential Tile Setters Journey Level $21.04 1 1 King Roofers Journey Level $53.27 5A 3H King Roofers Using Irritable Bituminous Materials $56.27 5A 3H King Sheet Metal Workers Journey Level(Field or Shop) $85.88 7F lE King Shipbuilding&Ship Repair New Construction Boilermaker $36.36 7V 1 King Rana i New Construction Carpenter $36.36 7V 1 King Shipbuilding&Ship Repair New Construction Crane Operator 536.36 7V 1 KIn S1lIpI7uIJdin-5e 5:11p IS.eI',�+I icW CpnSLruet'.r'EleOhcian $36.36 7V 1. Kin Shipbuilding&Ship Repair New Construction Heat&Frost Insulator $76.61 SJ 4H King Shipbuilding&Ship Repair New Construction Laborer $36.36 7V 1 King Shipbuilding&Ship Repair New Construction Machinist $36.36 7V 1 King Shipbuilding&Ship Repair New Construction Operating Engineer 536.36 7V 1 King Shipbuilding&Ship Repair New Construction Painter $36.36 7V 1 King Shipbuilding&Ship Repair New Construction Pipefitter $36.36 7V 1 King Shipbuilding&Ship Repair New Construction Rigger $36.36 7V 1 King iShipbuilding&Ship Repair New Construction Sheet Metal $36.36 17V 1 King Shipbuilding&Ship Repair New Construction Shipfitter $36.36 7V 1 King Shipbuilding&Ship Repair New Construction Warehouse/Teamster $36.36 7V 1 King Shipbuilding&Ship Repair New Construction Welder/Burner $36.36 7V 1 King Shipbuilding&Ship Repair Ship Repair Boilermaker 546.15 7X 4.1 King Shipbuilding&Ship Repair Ship Repair Carpenter $44.95 7X 41 King Shipbuilding&Ship Repair Ship Repair Crane Operator $45.06 7Y 4K King Shipbuilding&Ship Repair Ship Repair Electrician $46.15 17X 41 King Shipbuilding&Ship Repair IShip Repair Heat&Frost Insulator $76.61 5.1 4H King Shipbuilding&Ship Repair Ship Repair Laborer $46.15 7X 4.1 King Shipbuilding&Ship Repair Ship Repair Machinist $46.15 7X 41 King Shipbuilding&Ship Repair Ship Repair Operating Engineer 545.06 7Y 4K King Shipbuilding&Ship Repair Ship Repair Painter $46.15 7X 4.1 King Shipbuilding&Ship Repair Ship Repair Pi eftter $46.15 7X 4J King Shipbuilding&Ship Repair Ship Repair Rigger $46.15 7X 41 King IShipbuilding&Ship Repair Ship Repair Sheet Metal $46.15 7X 41 King Shipbuilding&Ship Repair Ship Repair Shipright $44.95 7X 4.1 King Shipbuilding&Ship Repair Ship Repair Warehouse/Teamster $45.06 7Y 4K King Sign Makers&Installers(Electrical) Journey Level $50.90 0 1 KinE Sign Makers&Installers(Non-Electrical) Journey Level 531.52 0 1 King Soft Floor Layers Journey Level $51.07 5A 31 King Solar Controls For Windows Journey Level $12.44 1 King 15prinkler Fitters(Fire Protection) Journey Level $81.39 15C 1X King Stage Ri ing Mechanics Non Structural) Journey Level $13.23 1 King Stone Masons Journey Level $58.82 SA Jim King Street And Parking Lot Sweeper Workers Journev Level $19.09 1 King Surveyors Assistant Construction Site Surveyor 568.02 7A 3K 8X King Surveyors Chainman $65.05 7A 3K 8X King Surveyors Construction Site Surveyor 569.16 7A 3K 8X King Telecommunication Technicians Journey Level $51.07 7E 1E King Telephone Line Construction-Outside Cable Splicer $41.81 SA 2B King Telephone Line Construction-Outside Hole Digger/Ground Person 523.53 SA 2B King Telephone Line Construction-Outside Installer(Repairer) $40.09 SA 2B King Telephone Line Construction-Outside Special A aratus Installer 1 541.81 SA 2B King Telephone Line Construction-Outside Special Apparatus Installer 11 540.99 5A 2B King Telephone Line Construction-Outside Telephone Eauioment Operator(Heavy) $41.81 SA 28 King Telephone Line Construction-Outside Telephone Equipment Operator(Light) 538.92 5A 2B King Telephone Line Construction-Outside Telephone Lineperson $38.92 SA 2B King Telephone Line Construction-Outside Television Groundperson 522.32 5A 2B King Telephone Line Construction-Outside Television Lineperson/Installer $29.60 SA 2B King Telephone Line Construction-Outside Television System Technician $35.20 5A 2B King Telephone Line Construction-Outside Television Technician 531.67 5A 2B King Telephone Line Construction-Outside Tree Trimmer $38,92 5A 2B King Terrazzo Workers Journey Level $54.06 5A 1M King Tile Setters Journey Level $54.06 5A 1M King lTile,Marble&Terrazzo Finishers Finisher $4499 SA 1B King Traffic Control Stripers Journey Level $47.68 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards $6159 SD 4Y 8L King Truck Drivers Asphalt Mix To 16 Yards $60.75 SD 14Y 8L King Truck Drivers Dump Truck $60.75 5D 4Y 8L King Truck Drivers Dump Truck&Trailer $61.59 5D 4Y 8L Kin Truck Drivers OtherTrucl;s 561.59 SD 4Y 8L King Truck Drivers-Ready Mix Transit Mix $61.59 SD 4Y 81- King LKin Well Drillers&Irrigation Pump Installers Irrigation Pump Installer $17.71 1 King Well Drillers&Irrigation Pump Installers Oiler $12.97 1 King Well Drillers&Irrigation Pump Installers Well Driller $18.00 1 EXHIBIT G TITLE VI ASSURANCES During the performance of this contract, the contractor/consultant, for itself, its assignees and successors in interest(hereinafter referred to as the "contractor") agrees as follows: 1. Compliance with Regulations The contractor shall comply with the Regulations relative to non-discrimination in federally assisted programs of United States Department of Transportation (USDOT), Title 49, Code of Federal Regulations, part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract. 2. Non-discrimination The contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, sex, or national origin in the selection and retention of sub-contractors, including procurement of materials and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations. 3. Solicitations for Sub-contracts, Including Procurement of Materials and Equipment In all solicitations either by competitive bidding or negotiations made by the contractor for work to be performed under a sub-contract, including procurement of materials or leases of equipment, each potential sub-contractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to non-discrimination on the grounds of race, color, sex, or national origin. 4. Information and Reports The contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the contracting agency or the appropriate federal agency to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to WSDOT or the USDOT as appropriate, and shall set forth what efforts it has made to obtain the information. 20 12/2019 5. Sanctions for Non-compliance In the event of the contractor's non-compliance with the non-discrimination provisions of this contract, the contracting agency shall impose such contract sanctions as it or the USDOT may determine to be appropriate, including, but not limited to: Withholding of payments to the contractor under the contract until the contractor complies, and/or; Cancellation, termination, or suspension of the contract, in whole or in part 6. Incorporation of Provisions The contractor shall include the provisions of paragraphs (1) through (5) in every sub- contract, including procurement of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The contractor shall take such action with respect to any sub-contractor or procurement as the contracting agency or USDOT may direct as a means of enforcing such provisions including sanctions for non-compliance. Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a sub-contractor or supplier as a result of such direction, the contractor may request WSDOT enter into such litigation to protect the interests of the state and, in addition, the contractor may request the USDOT enter into such litigation to protect the interests of the United States. 21 12/2019 BOARD. OF DIRECTORS CORPORATE CONSENT By written consent of the Board of Directors of NRC Environmental Services Inc.,made on October 17,2018,Robert Keesee,Vice President of this organization,is authorized to execute contracts in the name and behalf of said organization,and affix its corporate seal thereto;and such execution of any contract or obligation in this organization's name on its behalf by such Vice President under the seal of the organization shall be valid and binding upon this organization. I hereby certify that I am the Secretary-of NRC Environmental Services Inc.and that Robert Keesee is a Vice President of said organization,and that the above vote has not been amended or rescinded and remains in full force and effect as of this date. Si ature Tongrb an Selden.Secretary&General Co insel Type Name/Title 0� Date ENVIRONMENTALEXCELLENCE IN] • • NRC • 3500 Sunrise Highway • Great River,New York 11739 • +1 631 224 9141 www.nrcc.com Page 1 of 2 DATE(MMIDDIYYYY) CERTIFICATE OF LIABILITY INSURANCE 03/14/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER t:0N;ACF ___�__t_'�!__. Willis of New York, Inc. c/o 26 Century BlvdFA EJM Nn Ex,t:: 1-877-945-7378 A1C No: 1-888-967-2378 ^DDRE certificates@willis.com P.O. Box 305191 ADDRESS: Nashville, TN 372305191 USA INSURER(S)AFFORDING_COVERAGE NAIC# _ INSURER A.: Zurich American Insurance Company 16535 INSURED INSURER B: NRC ENVIRONMENTAL SERVICES INC. 9520 10th Ave. S., Suite 150 INSURER C: Seattle, WA 98108 USA INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:W10452706 REVISION NUMBER; THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDILIWOK TYPE OF INSURANCE POLICY NUMBERDDYIYYYY MMI DEPF Y EXP LTR IYYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE S 1,000,000 CLAIMS-MADE 7 OCCUR P� �A �o�rence S 1,000,000 A MED EXP Any one person) S 25,000 GPLO122451-02 03/16/2019 03/16/2020-PERSONAL BADV INJURY S 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERALAGGREGATE S 2,000,000 JECT ❑ LOC PRODUCTS-COMP/ PAGG SPOLICY X PRO 2,000,000 OTHER: $ AUTOMOBILE LIABILITY I Ea Mae I deDtSINGLE LIMIT S 1,000,000 )( ANY AUTO BODILY INJURY(Per person) S A OWNED SCHEDULED BAP0122462-02 03/16/2019 03/16/2020 BODILY INJURY(Per accident) S AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per aca.ident S A UMBRELLA LIAB X OCCUR EACH OCCURRENCE S 10,000,000 X EXCESS LIAB CLAIMS-MADE SXS0122454-02 03/16/2019 03/16/2020 AGGREGATE $ 10,000,000 DED I I RETENTIONS $ WORKERS COMPENSATION X I STATUTE I I ER AND EMPLOYERS'LIABILITYYIN 1,000,000 A ANYPROPRIETOR/PARTNERIEXECUTIVE E.L.EACH ACCIDENT S OFFICER/MEMBEREXCLUDED7 No NIA WC0122459-02 03/16/2019 03/16/2020 - (MandatorytnNH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,de$albe under DESCRIPITON F OPERATIONS below E-L.DISEASE-POLICY LIMIT S 1,000,000 A Contractors Equipment CPP0645396-01 03/16/2019 03/16/2020 Scheduled Equipment $16,023,279 Deductible $10,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) SEE ATTACHED CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE NRC Environmental Services Inc. 9520 10th Ave. S, Suite 150 Seattle, WA 98108 ) ©1988-2016 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD SR Io: 17650179 BATCH: 1109969 AGENCY CUSTOMER ID: LOC#: a �Rv ADDITIONAL REMARKS SCHEDULE Page 2 of 2 AGENCY NAMED INSURED Willis of New York, Inc. NRC ENVIRONMENTAL SERVICES INC. 9520 10th Ave. S., Suite 150 POLICY NUMBER Seattle, WA 98108 USA See Page 1 CARRIER NAIC CODE See Page 1 See Page 1 11 EFFECTIVE DATE: See Page 1 ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance UNSCHEDULED LEASED, RENTED, OR BORROWED $ 350,000 PER ANY ONE ITEM EQUIPMENT $ 500,000 PER OCCURRENCE DEDUCTIBLE 5% SUBJECT TO A MINIMUM OF $25,000 PER OCCURRENCE Re: Evidence of Insurance. The Excess Policy is following form and in excess of all the above liability coverage. INSURER AFFORDING COVERAGE: Zurich American Insurance Company NAIC#: 16535 POLICY NUMBER: GPLO122451-02 EFF DATE: 03/16/2019 EXP DATE: 03/16/2020 TYPE OF INSURANCE: LIMIT DESCRIPTION: LIMIT AMOUNT: Professional Liability Each Claim: $1,000,000 Aggregate: $2,000,000 INSURER AFFORDING COVERAGE: Zurich American Insurance Company NAIC#: 16535 POLICY NUMBER: GPLO122451-02 EFF DATE: 03/16/2019 EXP DATE: 03/16/2020 TYPE OF INSURANCE: LIMIT DESCRIPTION: LIMIT AMOUNT Contractors Pollution Liability Each Occurrence: $1,000,000 Aggregate: $2,000,000 ACORD 101 (2008/01) ©2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD SR ID: 17650179 BATCH: 1109969 CERT: W10452706