Loading...
13-104614 a. - Building - Single Family ICity°fFederal Way Permit #:13-104614-00-SF - Commmity Development Dept 33325 8th Ave S ' e • s Federal W ,WA 98003 Permit Request Line: (253)835-3050 • I Ph:(253)835-2607 Fax(253) 35-2608 Project Name: STEFOGLO Project Address: 144 S 293RD ST Parcel Number:720250 0070 Project Description: NEW-Construction of a 2744 square foot one story single family residence with a daylight basement and 462 square foot attached garage. Includes plumbing and mechanical. **$450,000 estimated selling price;3 bedrooms.** Owner Applicant Contractor Lender VIKTOR STEFOGLO VIKTOR STEFOGLO OWNER IS CONTRACTOR OWNER IS LENDER 32330 4TH PL S APT P6 32330 4TH PL S APT P6 FEDERAL WAY WA 98003-5820 FEDERAL WAY WA 98003-5820 Census Category: 101-New Single Family House Includes: I #1 #2 #3 #4 Occupancy Class: 0 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 2,774.00 0.00 Additional Permit information New/Additional Sq.Feet-1st Floor 1088 New/Additional Sq.Feet-2nd Floor 0 New/Additional Sq.Feet-3rd Floor 0 Occupancy#1-Area(Sq.Feet) 2774 New/Additional Sq.Feet-Basement 1686 Basic Plan9 No Occupancy#1-Construction Type Type V-B New/Additional Sq.Feet-Deck 0 New/Additional Sq.Feet-Garage 462 Mechanical to be Included? Yes Plumbing Work Valuation 7900 Mechanical Work Valuation? 7900 Number of Stories 1 New/Additional Sq.Feet-Other 0 Plumbing to be Included9 Yes New/Additional Sq.Feet-Total 3236 Will Certificate of Occupancy be Issued? Yes Occupancy#1-Use Residence(1 or 2 family) Comprehensive Plan Designation SF-High-Density Zoning Designation RS 9.6 Residential Total Valuation:333,110.16 Ducting 1 Fans 4 Furnaces 1 Gas Piping 1 Gas Pipe Outlets 2 Hot Water Tanks 1 Bathtubs 2 Dishwashers 1 Laundry Washer Outlets 1 Lavatories 2 Sinks 1 Water Closets 2 Hose Bibbs . ud c S 62 CONDITIONS: y3/{q 1)Prior to installation,a cut sheet for the Detention Tank and a detail showing orifice location,volumes, inlet,riser,etc.must be submitted for review and approval. Final design must be stamped by a licensed civil engineer. 2)Earthwork for this project must be completed during the "dry" season-May 1 -October 1. This site must be fully stabilized prior to October 1. any earthwork occurring outside these dates must be . specifically approved by the Public Works Department prior to start. - - 3)Public works inspection required during/after tank installation,topsoil placement,dispersion trench • installation,erosion control. Contact Ann Dower @ 253-835-2732. PERMIT EXPIRES Tuesday,9 April,2019 Permit Issued on Thursday,July 13,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. igrt Owner ora. nt: '1 / Date: 101111)g g City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance,this structure was in compliance with the various ordinances of the City regulating building construction or use.This certificate is valid ONLY when endorsed by City staff. Tenant Name: STEFOGLO Permit# 13-104614-00-SF Address: 144 S 293RD ST Includes: #1 #2 #3 #4 Occupancy Class: 0 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 2,774.00 0.00 Owner Name: VIKTOR STEFOGLO Owner Address: 32330 4TH PL S APT P6 / FEDERAL WAY WA 98003-5820 /Al3A0Ae.) :uilding Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible(within budgetary time and personnel limitations),the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and/or occupant of the premises. • T a. «- • • Building - dingle Fam11 y City of Federal Way Permit #:13-104614-00-SF Community Development Dept_ s , 33325 8th Ave S ' Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: C N I INVESTMENT-REDONDO BAY TRANQUILITY Project Address: 144 S 293RD ST Parcel Number:720250 0070 Project Description: NEW-Construction of a 2,744 square foot one story single family residence with a daylight basement and 462 square foot attached garage. Includes plumbing& mechanical. **$450,000 estimated selling price;3 bedrooms.** Owner Applicant Contractor Lender C N I INVESTMENT C N I INVESTMENT GARY'S FIX-IT PLUMBING& OWNER IS LENDER 24913 104TH AVE SE 24913 104TH AVE SE HEATING KENT WA 98030 KENT WA 98030 24913 104TH AVE SE KENT WA 98030 Census Category: 101 -New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: 0 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 2,774.00 0.00 Additional Permit Information New/Additional Sq.Feet-1st Floor 1088 New/Additional Sq.Feet-2nd Floor 0 New/Additional Sq.Feet-3rd Floor 0 Occupancy#1-Area(Sq.Feet) 2774 New/Additional Sq.Feet-Basement 1686 Basic Plan? No Occupancy#1-Construction Type Type V-B New/Additional Sq.Feet-Deck 0 New/Additional Sq.Feet-Garage 462 Mechanical to be Included? Yes Plumbing Work Valuation 7900 Mechanical Work Valuation 7900 Number of Stories 1 New/Additional Sq.Feet-Other 0 Plumbing to be Included? Yes New/Additional Sq.Feet-Total 3236 Will Certificate of Occupancy be Issued? Yes Occupancy#1-Use Residence(1 or 2 family) Comprehensive Plan Designation SF-High-Density Zoning Designation RS 9.6 Residential Total Valuation:333,110.16 �'�r✓ uf � _ �, a �E� a � e ��3 a� �s u�° u� � as E ����ay s nz �3�'��r Ducting 1 Fans '4 Furnaces 1 a.- d; ....�h2 Hot Water ater Tanks 11 GPipeOutlets u+5- � a aa,,GasNping a „ ir,5- u , � .m, Bathtubs 2 Dishwashers 1 Laundry Washer Outlets 1 Lavatories 2 Sinks 1 Water Closets 2 Hose Bibbs 2 CONDITIONS: ` 1)Prior to installation,a cut sheet for the Detention Tank and a detail showing orifice location,volumes, inlet,riser,etc. must be submitted for review and approval. Final design must be stamped by a licensed civil engineer. 2)Earthwork for this project must be completed..during the "dry" season-May 1 October 1. This site .:. must be fully stabilized prior to October 1. any earthwork occurring outside these dates must be • iste i ` 4 .. rc. '-'� .. sir r specifically approved by the Public Works Department prior to start. 3)Public works inspection required during/after tank installation,topsoil placement,dispersion trench ' installation,erosion control Contact Ann Dower @ 253-835-2732. PERMIT EXPIRES Tuesday,9 January,2018 Permit Issued on Thursday,July 13,2017 I hereby certify that the afrile" is correct and that the construction on the above described property and the occupancy anbe in accordance with the laws, rules and regulations of the State of hington and the City of Federal Way.Owner or agent: , Date: 13 ` City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance,this structure was in compliance with the various ordinances of the City regulating building construction or use.This certificate is valid ONLY when endorsed by City staff. Tenant Name: C N I INVESTMENT-REDONDO BAY TRANQI: Permit# 13-104614-00-SF Address: 144 S 293RD ST Includes: #1 #2 #3 #4 Occupancy Class: 0 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 2,774.00 0.00 Owner Name: C N I INVESTMENT Owner Address: 24913 104TH AVE SE KENT WA 98030 Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible(within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any,other person that this.Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State o;Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and/or occupant of the premises. �i�Y THIS CARD IS TO REMAIN ON-SITE c�� Construction Inspection Record FedeWay INSPECTION REQUESTS:(253)835-3050 PERMIT#: 13 104614 00 Address: 144 S 293RD ST Project: C N I INVESTMENT FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El SWM Precon Site Mtg(4400) 2❑ Initial Erosion Control(4365) Q Footings/Setback(4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Ad Date q I ) ® Foundation Wall(4115) El Drainage/Downspout(4040) ® Plumbing Groundwork(4190) Approved to place concrete Approved to backfill Approved to cover By P Date A 24 t'1 By4U5 Date tj By 4 rI Date s t Slab/Concrete Floor(4255) © Underfloor Framing(4285) 0 Floor Sheathing(4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date 4 By Date By .r.1 Date /0vii- O Shear Walls(4245) 0 Roof Sheathing(4220) Ei Rough Plumbing(4230) Approved to install siding Approved to install roofmg Approved By Date By Date io/Z c By btitki Date i( 7 /V In Mechanical Rough-in(4165) El Gas Piping(4125) Fire/Draft Stops(4095) Approved Approved to release test ' Approved By 6 Date g, By , 2 , Date ,,_ . By i Date _. , . © Interim Erosion Control(4370) Prior to scheduling a Framing inspection; ®7 Framing(4120) Approved Electrical.Plumbing&Mechanical Rough-ie Approved to insulate .----_________ and Fire/Draft Stop inspections must be signed- By Date 11,a--14.4 signed- off and approved IBC 1093.4 By C Date S—1, 9 1:1 Insulation(4150) ® Gypsum Wallboard Nailing(4130) ' Final Erosion Control(4375) Approved to install wallboard Approved to install mud&tape Approved _By (\ .AJ Date 4 _5`!C �By Date `) _1By Date al Final-Mechanical(4065) 21 Final-Plumbing(4075) 73 Final-Building(4050) Approved Approved Approved .By4�S Date Y Op.k! By Date / ..20 BY Z42$ Date /42.t 040 AO— 41/),Z f t chit CK 104 lit - A4i3. (z) /ok- i✓ill filed 1A 502 ' . nse. i-3444 C exIv ve rl' ,se- V -+rift' '�1 ' PAL. S dam- `�v @- 9w e tlx. ilLiAk. an t -fro - erg._ 441,t, telt. 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved - Approved By Date By Date By Date 1 4- . 0 • t iN g .. S b iS. - v vA 3 • h tip • 7. 9 �-czo. h 4 :L. . ‹, rNN -S W 3 Q 4 Z t 1 � � r 11 11 ! J . . 4&CITVOP THIS CARD IS TO REMAIN ON-SITE Construction 5-050rdfederal Way ERESTInspection835-3 PERMIT#: 13 104614 00 Address: 144 S 293RD ST Project: VIKTOR STEFOGLO FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 SWM Precon Site Mtg(4400) El Initial Erosion Control(4365) " 0 Footings/Setback(4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By Date 't❑ Foundation Wall(4115) El Drainage/Downspout(4040) ® Plumbing Groundwork(4190) Approved to place concrete Approved to backfill Approved to cover By Date By Date By Date 0 Slab/Concrete Floor(4255) El Underfloor Framing(4285) ® Floor Sheathing(4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date MI Shear Walls(4245) a1 Roof Sheathing(4220) f3 Rough Plumbing(4230) Approved to install siding Approved to install roofing Approved By i A Date 1 14 By Date By Date ng Mechanical Rough-in(4165) nri Gas Piping(4125) al Fire/Draft Stops(4095) Approved Approved to release test Approved By Date By Date By Date El Interim Erosion Control(4370) Prior to scheduling a Framing Inspection; al Framing(4120) Approved Electrical,Plumbing&Mechanical Rough-in Approved to insulate and F re/Draft Stop inspections must be dgned- By Date off and approved. IBC 109.3.4 BY Date On Insulation(4150) a] Gypsum Wallboard Nailing(4130) Final Erosion Control(4375) Approved to install wallboard Approved to install mud&tape Approved By Date By Date By Date •31 Final-Mechanical(4065) 11 Final-Plumbing(4075) ® Final-Building(4050) Approved Approved Approved By Date By Date By Date • 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date .By Date rway RECEIVED PERMIT APPLICATION OCT 1i8 2013 PERMIT NUMBER / ✓ CmpFZ V L 1 V/„AY7 Li - S F TARGET DATE ////57/3 SITE ADDRESS SUITE/UNIT i 1(1LI ZCjT 5- No&E 4 .CSI4N& 6 PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL# $ l�9 Opo 7 a 00Z- 5- 0 - 6 Q 7 O TYPE OF PERMIT BUILDING ( LUMBING MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT ( N / /pj yes-FPI/p pt.,�-Sii.L s --,-- PROJECT DESCRIPTION q Detailed description of work to /L/,. 5 F(L 1-Aad 1l 3 jrN4A-1j t , be included on this permit only �!\ PNAME ,- } �R Y PHONE PROPERTY OWNER C-N I I v es+w« s1 !�_^ - 353- MAILING ADDRESS Ay9 ( 3 Ia `I r.vt SE. )��M�AD r' 1044 0 R Le.KOW P q W01 I•CO to. CITY k e k f STATE Z�9 E 0 3 o J TB 6NPHONE iy `s rix � � MAILING ADDRESS E-MAIL�1�,.- E_MA CONTRACTOR '< K 4 _ CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE M EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE S / / NAME / /I bS I PRIMARY PHONE APPLICANT MAILING ADDRESS (/L E-MAIL CITYSTATE ZIP FAX PROJECT CONTACT NAME (// ; CC , e v/akhar, S P RibtZd l77,3,-"i,50 (The individual to receive and MAILING ADDRES /� It-MAIL respond to all correspondence 81 i AJ A '.1'6(11Y Qin((,fie IAV 6,Gie S 1 L its,SIS concerning this application) CITY STATE Zit 0 FAX FAX J J NAME s'll f� PROJECT FINANCING WNER-FINANCED Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit.I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the Ci of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such m),which may be made by any person,including the undersigned,and filed against the city, but only where such claim arise t of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the ci as a part of this application. SIGNATURE: DATE 10-16,-12 PRINT NAME: Wci i_c__, AL Bulletin#100—January 1,2013 Page 1 of 3 k:\Handouts\Permit Application VALUE OF MECHANIC MECHANICAL PERMIT $ 6000 Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. AIR HANDLING UNITS 3 FANS 2., GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(commercial) BOILERS I FURNACES I. HOT WATER TANKS(Gas) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING ( GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. Z BATHTUBS(or Tub/Shower Combo) Z, LAVS(Hand Sinks) 2- TOILETS WATER PIPING I DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS t SHOWERS VACUUM BREAKERS DRINKING FOIJI TAINS _____ —L-SINKS_(Icitctuu/utility)- WATER HEATERS-(E1,ctric)- HOSE BIBBS SUMPS ( WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS N EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SP ER SYSTEM? PROPOSED FIRE SUPPRESSI N SYSTEM? ` i G� ❑YesNo ❑Yes RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE "BASE1M� li FIRST FLOOR(or Mobile Home) I V COVERED ENTRY DECD{ , 1y?- fa •_ GARAGE E7 CARPORT ❑ (-1(p G EXISTING PROPOSED TOTAL Area Totals =r 31,1340 ESTIMATED SELLING PRICE$ 1'4, Vl OU #OF BEDROOMS 3 COMMERCIAL—NEW/ADDITION AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information in Square Feet Type Stories • NEW BUILDING ADDITION COMMERCIAL—REMODEL/TENAN OVEMENTS AREA DESCRIPTION Are: Occupancy Group(s) Construction #of Additional Information t are Feet Type Stories TENANT AREA ONLY x U PROJECT AREA OiftTAY Bulletin#100—January 1,2013 Page 2 of 3 k:\Handouts\Permit Application �����-� �3--Io�� ►�-4-c�--S�= ' ' � ������� 1�-1`� S� Z.�i?��c� �-c�-� � . , C �� � � :�-' I��N`v�S�ME►�; . SEE CONiRTCI PLANS —VnNE�G0.RTE FOR DRAINAGE A'��/'� AND MAINTENPNCE�CCE55 �U U c ��-///��� ^ J VROVI�E0.15ERNOtCH ��1\'��� ���L� � u (iYPERECfAflGULA0.) I��.SS u � a$ PER SPECIFICPTIOfVS �� g#Z s I 6'OInMT a W F � W �$ �°� FIPESUFFORTS � �� eaHo ro smr-wau �nzruces � GRAPHIC SCALE m �s Q aaa�, (- 15' STREAM BUFFER AREA � � ��e��2 s i,`l'e DETENTIOV T�NK SVECIFIUllONS NOiES: � VO�UnE: 2550WI. SETRISERHEIGMTTOYROVIOE TO BE REPLANTED � y /� � 021FlCE:0.99INCHES DErENT10N VOLVME OER I� � �-�qp��s RISERD[AMEtE0.:6[NCHES SPECIFICRTIONS r ��� RISE0.NOTCH /� TYVE: RECTNNGIE RESIHICfOR PLA�E WIfH � StZE:0.22 INCH HEIGHT ORIFlCE TO BE FW NO AND � ', �1 o.oscrvc�w�orn snooTe ee DOWNSPOUTS �i� I . �� ��� BUILDING TYPICAL DETENTION TANK � a � � � SETBACK � � /�po`i� I LINE `r.�/ ��� 1 � . � TOP OF SLOPES STEEPER THAN 20% ��� �-'� I� FOR STORMWATER FACILITY SETBACKS �j ��� -r' t � 4 ry b � ���// � ----- -- I �' � '�' ����s "� G� �O, ��'9. . � "� � �a€' - e.win� �� , � \ --�-----�--I � i �� , o 6J0' E � UTILITY CONNECTION \ , \\` pROPOSED SINGLE �� i DISPERSION PIPE e 'j FAMILY RESIDENCE �� � � I �� GE FF=z76.0' ', / �` GAMqIN FF=277.5' '� � ! 267.5"� � �W o - �gqSEMENT FF= � i I �Z ' 28g5 SF S \ �a11 ' �Lsa lr �N'b�t��---- a�=o 25'SETBACK FROM STEEP SLOPES `�`9�,po �, I ��� w�', Q s� � j 1 0�3 0 � �T1, � e ��'}N E X I S T I N G C U R B ^�° o ' � z N i—o � �_�_, Kmw�narsbelow. —�f- Call netore yo�diy. ���� � PAVED DRIVEWAY —' , �' �, o o S z 409 SF NOTEs: Z�w a "�� --- - ---- --- 20' a x� - - � -'- AREAS OF DISTURBED SOILS SHALL BE AMENDED PER m X w UNDERGROUND POWER _ _ s o so 15 THE SOIL AMENDMENTS NOTE,DEfAIL 5 ON SHEEf C-3. �x a -�' �_ ��xrfrirrc. \ � i: IF A DETENTION STRUCTURE IS SELECTED THAT IS NO7 2550 GALLON DETENTION TANK �� CONCRETE,G(iOUND ANCHORING SHOULD BE � �W/FLOW RESTRICTOR AND VANED GRATE \ PROVIDED. BUILDING /aLL DOWNSPOUTS SNALL BE CONNECfED TO DETENTION �--44� TANK. COORDINATE WITH ARCHI7ECTURALPL4N5. "a'"� 21.4' SETBACK DRAINAGE PIAN LINE CLEANOUT �� �-2