20-100034 ,
Mechanical
City of Federal Way Permit #:20-100034-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: THOMPSON
Project Address: 32842 22ND AVE SW Parcel Number: 894500 0730
Project Description: 2 PORT DUCTLESS MINI SPLIT INSTALL
Owner Applicant Contractor
RAYMOND J THOMPSON RACHAEL AILSHIEPACIFIC HEATING& PACIFIC AIR SYSTEMS(GENERAL)
32842 22ND AVE SW COOLING PACIFAS093KA(9/8/21)
FEDERAL WAY WA 98023 8607 DURANGO ST SW
LAKEWOOD WA 98499 12811 PACIFIC HWY SW
LAKEWOOD WA 98499
Additional Permit Information
Mechanical Work Valuation? 10025 Is this an Online or O.T.C.application? Yes
Air Handling Units 2 Compressors/Heat Pumps 1
PERMIT EXPIRES Sunday,5 July,2020
Permit Issued on Tuesday,January 7,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accor e laws, rules and regulations of the State of
ONWern1
Way.
Owner or agent: Date:
l
FILE
.Alk j ., r
THIS CARD IS TO REMAIN ON-SITE
COY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 20 100034 00 Address: 32842 22ND AVE SW
Project: RAYMOND J THOMPSON FEDERAL WAY WA 98023-2802
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ' ® Gas Piping(4125) ® Final-Mechanical(4065)
Approved Approved to release test Approved
sBy jee Date 29.16 4By Date �`By '�C Date fro
0 Rough Electrical 0 Final Electrical 0 Right of Way
Approved Approved Approved
By Date By Date By Date