Loading...
19-105618 .� -- '+ City ofFederal Way FILEElectrical Permit #:19-105618-00-EL Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: ENA HOLDING COMPANY Project Address: 33600 6TH AVE S Parcel Number:926480 0205 Project Description: Ti on office space Owner Applicant Contractor AULUKISTA LLC MICHELLE TOTHP K ELECTRIC P K ELECTRIC 33600 6TH AVE S UNIT 220 7834 SE 32ND ST AVE PKELE**972BT(2/13/21) FEDERAL WAY WA 98003 MERCER ISLAND WA 98040 7834 32ND ST SUITE 102 MERCER ISLAND WA 98040 Additional Permit Information Is this an Online or O.T.C.application? Yes w'�. .€' #„>'. '”,;;;4! " ,t _ <,. -: a:... t ... -a . 3,.. 544, .,; s,.fie. Circuits-Commercial 16 PERMIT EXPIRES Tuesday,24 November,2020 Permit Issued on Monday,November 25,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Th' on h f Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON-SITE Federal Wa'WA' Construction Inspection Record y INSPECTION REQUESTS:,(253)835-3050 PERMIT#: 19 105618 00 Address: 33600 6TH AVE S Unit 220 Project: AULUKISTA LLC FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® UFER Ground4295 ( ) ❑ Ditch cover(4030) El Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date • •' Pool Bonding(4195) ! 0 ❑ Temporary Power(4275) ❑ Service(4235) Approved Approved Approved .By Date •By Date ; By Date • • •® Feeders/Sub-panels(4045) •• .. Rough Electrical(4225) •,El Ceiling Cover(4020) Approved Approved Approved I �r By Date By Date �2-2�1/ By , Date /42011-19 EFinal-Electrical(4055) •• �j� Approved By `�.l� " Date /-1/1a,•.1.0 Rough Electrical ❑ Final ElectricalIDRight of Way Approved Approved Approved By Date By Date By Date