Loading...
20-100302 di. r Electrical City of Federal Way Permit #:20-100302-00-EL Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: CHENG Project Address: 29925 3RD AVE SW Parcel Number:720533 0040 Project Description: Meter inspection to restore power; complete corrections from previous contractor's permit 19- 104703. Owner Applicant Contractor ZHI ZHANG GRAY DUNCANGRAY'S ELECTRIC GRAY'S ELECTRIC 29925 3RD AVE SW 25607 E LAKE WILDERNESS DR SE GRAYSE*900C4(3/14/20) FEDERAL WAY WA 98023 MAPLE VALLEY WA 98038 25607 E LAKE WILDERNESS DR SE USA MAPLE VALLEY WA 98038 Additional Permit Information Is this an Online or O.T.C.application? Yes IY,S. � W,,,,a �� _. �� '� +. k.5.f.v�a 3 .. 1 ."tT=i w, _ ,3�. #x_.,, t=�`a�... 0N'Tv�,.s�,. R'+ � , ;,d,, r «„.A ��:sIE£�s, ,s��Y. Alt. Serv./Feeder:0 to 200 am] I CONDITIONS: Electrical contractor shall meet the inspector at the site to evaluate the installation and provide to the inspector written verification that the service has been evaluated and found to be in safe and compliant condition. PERMIT EXPIRES Thursday,21 January,2021 Permit Issued on Wednesday,January 22,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. j Owner or agent: Date: / 1a 2 101c) r, hyt ) 1 i • THIS CARD IS TO REMAIN ON-SITE `mom Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 20 100302 00 Address: 29925 3RD AVE SW Project: ZHI CHENG ZHANG FEDERAL WAY WA 98023-3511 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground(4295) 0 Ditch cover(4030) ® Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date �By Date By Date El Pool Bonding(4195) ® Temporary Power(4275) El Service(4235) Approved Approved Approved `BY Date ��By Date ^By Date ® Feeders/Sub-panels(4045) ,I ® Rough Electrical(4225) 9❑ Ceiling Cover(4020) Approved Approved Approved •By Date *By Date J•By Date 10 Final-Electrical(4055) Approved By �� Date ' 1).001 Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date RECEIVED ELECTRICAL CITY OF Federal Way JAN 2 2 2020 PERMIT APPLICATION CITY FAY COM UNITY DEY OEDERkLPMENT /1 PERMIT NUMBER A 0 _ f 6 U 3 V ,2__ E L SITE ADDRESS: g9.1(oRSUITE/UNIT/SPACE# 5 34 ' Z?iJ SW PROJECT VALUATION ASSESSOR'S TAX/PARCEL it CURRENT/PROPOSED USE PROJECT NAME (Tenant or Homeowner Last Name) k.-6611t—C\ ... CoIe-.---t-4 C o if v�.c..--h' (AN--S O 4 PROJECT DESCRIPTION f v �VH T ) q. / Oil 7 0.3 4iL C Detailed description of work to S & f e +0 ie 1r—1-1) y` . 6w �t`i V"' be included on this permit only I �" NAME I ` PRIMARY PHONE PROPERTY OWNER 11' A A/5 �I+4 I C IQ/v ),`/' ( ) - MAILING ADDRESS `� E-MAIL aq9A� 3 AveSL ) CITY STATE ZIP FAX eaa(, 14)0 kil wA 1o a3 ( ) - NAME PRIMARY PHONE G.Aw6 If c,-t.61 L ( ) - MAILING ADDRESS E-MAIL ELECTRICAL (o o7 Z 4'IT �I I I d `k e6 ks CONTRACTOR CITY STAT ZIP FAX ASUU{{ WCONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# / / NAME PRIMARY PHONE CA:5),.....,:siycLa6r APPLICANT MAILING ADDRESS ( ) E-MAIL c5 ho7 Q LAk2 w� 1 ded X55 J154amu/vcAtiSEIeCii416. CITY STATE ZIP FAX /� MA,,r fl4RVI€ vP,/ieLf A gco3K ( ) _ �iC7 NAME PRIMARY PHONE PROJECT CONTACT 6-0-1)19 )()N CPA) (4 S ) 3/ 6)- 7 "- I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs, expenses,and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person,including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. j SIGNATURE: '7 DATE I /a2, ) a�� PRINT NAME: (5—IF U( NC l) Bulletin#160—April 14,2016 Page 1 of 1 k:\Handouts\Electrical Permit Application