20-100135 w' p 'r'
• c
Mechanical
City of Federal Way F i L •
Community Cityof evelopnent alWaDept. Permit #•20-100135-00-ME
33325 8th Ave S
E
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: BAINE
Project Address: 32116 42ND PL SW Parcel Number: 873196 0470
Project Description: REMOVE/REPLACE GAS WATER HEATER
Owner Applicant Contractor
DAVID BAINE JASON HANLEYBROWNFAST WATER FAST WATER HEATER CO(GENERAL)
32116 42ND PL SW HEATER COMPANY FASTWWH948BC(1/4/22)
FEDERAL WAY WA 11715 NORTH CREEK PKWY S SUITE C-106
98023-2405 BOTHELL WA 98011 1715 NORTH CREEK PKWY S SUITE C-104
BOTHELL WA 98011
Additional Permit Information
Mechanical Work Valuation9 1358 Is this an Online or O.T.C.application? Yes
3 3 1 i I l r., v a.+r s t. 5 x .� ,-y $t -r ` a a :z r 95Y ;
ta , .,... 44,.. koa' `% ! 4 , „W5t _ 0 N �.� �`a .�
Hot Water Tanks 1
PERMIT EXPIRES Saturday, 11 July,2020
Permit Issued on Monday,January 13,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: ® N L.1 N E Date:
r‘inat
• . 4 '
•
THIS CARD IS TO REMAIN ON-SITE
""'� Construction Inspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 20 100135 00 Address: 32116 42ND PL SW
Project: DAVID BAINE FEDERAL WAY WA 98023-2405
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
• Rough-in( ) f❑ Gas Piping(4125) „ 3
® Mechanical 4165 � ❑ Final-Mechanical(4065) ,
Approved Approved to release test Approved
.By Date ,.By Date ...By 4.1.0 Date 1',241/20
❑ Rough Electrical ❑ Final Electrical ❑ Right of Way
Approved Approved Approved
By Date By Date By Date