Loading...
20-100311 i 1 D�em-olition CityofFederalWay Permit #:20-100311-00-DE Community Developme�it Dept. 33325 Sth Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)8352607 Fax:(253)835-2609 Project Name: SALISBURY Project Address: 33214 33RD AVE SW Parcel Number: 109976 0390 Project Description: Demolition of existing 2 story home. Owner Applicant Contractor THOMAS SALISBURY R LEE ROGERSWOODLAND INDUSTRIES WOODLAND INDUSTRIES � 33214 33RD AVE SW 10715 66TH AVE E WOODLIG033JD(3/8/20) FEDERAL WAY WA 98023-2736 PUYALLUP WA 98373 10715 66TH AVE E PUYALLUP WA 98373 Additional Permit Information PERMIT EXPIRES Tuesday,21 July,2020 Permit Issued on Thursday,January 23,2020 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ashington and the City of Federal Way. Owner or agent: Date: � � v THIS CARD IS TO REMAIN ON-SITE ' ' • �m�F ' Construction Ins�ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 20 100311 00 Address: 33214 33RD AVE SW Project: THOMAS E SALISBURY FEDERAL WAY WA 98023-2736 Scheduled inspections may be failed if this card is not on-site. DO NQT LOSE THIS CARD. [nspections are listed as close to sequenlial order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until i[is approved. Check with your inspector if you aze unsure about any of the inspections or the inspeclion sequence. On-going inspections are logged on the back of this card. �❑ SWM Precon Site Mtg(4400) �❑ Initial Erasion Control(4365) �❑ Interim Erosion Control(4370) Approved To be done PRIOR to breaking ground Approved By Date By Date By Date �❑ Final Erosion Control(4375) S❑ Final-Building(4050) Approved Approved By Date By Date � � � Rough Electrical � Final Electrical � Right of Way Approved Ap�xoved Approved By Date By Date By Date RECEIVED • PERMIT APPLICATION CITY OF.A, JAN 2 3 2020 Federal Way PERMIT CENTER+33325 8th Avenue South+Federal Way,WA 98003-6325 'fir CITY OF FEDERAL WAY 253-835-2607+FAX 253-835-2609+permitcenterAcityoffederalway.com COMMUNITY DEVELOPMENT PERMIT NUMBER I l.: _ / 0 0 3 1 I _ AY/4 — _ TARGET DATE SITE ADDRESS SUITE/UNIT# ,V CMI 3�r-6. PROJECT VALUATION ZO NG ASSESSOR'S TAX/PARCEL# TYPE OF PERMIT ❑ BUILDING 0 PLUMBING 0 MECHANICALDEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT asa j l at'—c—' nui PROJECT DESCRIPTION (11,-,(..\\,31-, , M1 6 Detailed description of work to V'�'� �^ be included on this permit only N E PRIMARY PHONE PROPERTY OWNER ;� ri113 L)l,U\-1 MAILING ADDRESS E-MAIL CITY STATE ZIP UIE L'Akrnc/ '/)Au,.\ r PHONE o-c 3 �qlf G ADD���E�s� E-MAIL l CONTRACTOR (1-�i lY V � Q CrGCWC(.11 kCl‘C1"614}N-(1.0)nJ*- WA09. TATEFAX �CO�R CT'S LICENSE# Z IP XP iN DATE FEDERAL WAY BUSINESS SE# Uic).1l_�i( 3? 5 U / 2S / NAME PRIMARY,...71A,NO loo_Vor)el 'Ina k43' ,C. o.3 OS-3--,---' APPLICANT rAtIr.sING ADDRESS E-MAIL - v�lal``�, �`� F _ N(v 070 ' PROJECT CONTACT iY'l- ,Ni PRIMARY-40 Orin i C_) 1 j\V-- _C((.Q U1 3 (The individual to receive and MAILING ADDRESS �"MAH I ( r respond to all correspondence ��)I c (L�Li 10 (Cv`c l WCa;C,{,C`i11;/(/1 tti iJ'Tf nt concerning this application) I TATE z F NAME ‘ PROJECT FINANCING 0 OWNER-FINANCED When value is$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim),which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplie• he city as a part of this application. SIGNATURE: DATE I-C.:93—f )9J PRINT NAME: - !( \CA r-r \C Bulletin#100—January 29,2016 Page 1 of 2 k:\Handouts\Permit Application • VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(commercial) BOILERS FURNACES HOT WATER TANKS(caa COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT $ Indicate how many of each type of facture to be installed or relocated as part of this project.Do not include existing fixtures to remain. BATHTUBS(or Tub/Shower Combo) LAVS(Hand sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS pctchen/umiN WATER HEATERS(Electric) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? ❑Yes❑ No ❑Yes ❑ No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE FIRST FLOOR(or Mobile Home) w ! COVERED ENTRY GARAGE ❑ CARPORT ❑ EXISTING PROPOSED TOTAL Area Totals ESTIMATED SELLING PRICE$ #OF BEDROOMS COMMERCIAL-NEW/ADDITION AREA DESCRIPTION Area Occupancy Group(s)in Construction #of Additional Information 8 uare Feet • Stories a is �.a'_ . ti ADDITION COMMERCIAL-REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area in Occupancy Group(s) Construction #of Additional Information Square Feet • .e Stories ,via arm TENANT AREA ONLY 4 :. ' x . Bulletin#100—January 29,2016 Page 2 of 2 k:\Handouts\Permit Application COMMUNITY DEVELOPMENT DEPARTMENT 33325 8`h Avenue South Federal Way,WA 98003 CITY OF "1111Iftrov 253-835-2607;Fax 253-835-2609 Federal VVay www.cityoffederalway.com DEMOLITION PERMIT REQUIREMENTS A demolition permit is required to remove any structure on a subject property. Demolition of separate structures may require separate permits. 0 Address of Demolition: c- v. O Prior to submitting a demolition permit, the following items must be signed by the respective agency or their approvals attached. Items not applicable to your project should be marked N/A. ❑ A completed Construction Permit Application form is also required. 1.ASBESTOS ABATEMENT (Provide copy of Notice of Intent from Puget Sound Clean Air Agency . ELECTRICITY and copy of inspection report by AHERA-certified inspector) (Puget Sound Energy/Tacoma Power) (City of Federal Way Building Official) 2. FUEL STORAGE TANKS 6. NATURAL GAS ❑ Under grade tank(s)is/are present o Above grade tank(s)are present o Tank(s)has been pumped or removed under South King Fire& (Puget Sound Energy) Rescue permit prior to any dismantling or excavation NIA (S uth King Fire and Rescue) 7.WATE - Public ource (-2: 207_0 (Lakehaven Utility District) 3. SEPTIC SYSTEM DECOMMISSIONING N/ 1 8.WATER- Private Well (King County Environmental Services) ' 1 Kin CountyEnJronmental Services) 9 4.SANITARY 4LakehavenUtty R r^� District) 05/2-4070 - r •�to ? O Please Note: Erosion control measures must be in place during the demolition and through completion of the site clean-up. (Applicant) Bulletin#122—March 16,2017 Page 1 of 1 k:\Handouts\Demolition Permit Requirements ` DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES, 33325 8th Avenue South CITY OF Federal Way,WA 98003-6325 Federal Way 253-835-2607;Fax 253-835-2609 www.citvoffederalway.com DEMOLITION PERMIT CONTACT LIST This list of agencies may assist you in expediting the demolition permit process.Refer to the demolition permit requirements for signature blocks.All applicable signatures are required prior to permit approval. 1. Asbestos Removal: Puget Sound Clean Air Agency 110 Union Street, Suite 500 Seattle,WA 98101-2038 206-343-8800—OR—800-552-3565 www.pscleanair.org 2. Electricity: Puget Sound Energy Tacoma Public Utilities Attn: Construction Coordinator Customer Service 22828 68th Avenue South, Suite#102 —OR— 747 Market Street Kent,WA 98032 Tacoma,WA 98402 888-225-5773 253-383-9600 or 253-383-2471 3. Gas: Puget Sound Energy 805 156t Avenue NE Bellevue,WA 98004 888-225-5773 4. Telephone: Qwest Communications 801-962-2475 (phone)/801-237-6491 (fax) 5. Water: Lakehaven Utility District Tacoma Public Utilities Technical Service Division Customer Service 31623 First Avenue South —OR— 747 Market Street Federal Way,WA 98003 Tacoma,WA 98402 253-941-2288 253-383-9600 or 253-383-2471 6. Garbage: Waste Management 655 Second NW Auburn,WA 98071 253-833-3333 (residential)—OR—253-939-9792(commercial) 7. Sewer: Lakehaven Utility District Technical Services Division 31623 First Avenue South Federal Way,WA 98003 253-941-2288 8. Septic: King County Environmental Services 14350 SE Eastgate Way Bellevue,WA 98007 206-296-4932 9. Fire Department: South King Fire&Rescue 33325 8th Avenue South Federal Way,WA 98003 253-946-7248 Bulletin#109—January 1,2011 Page 1 of 1 k:\Handouts\Demolition Permit Contact List FW: notification 508674436 33214 33RD AVE SW federal way Valirie Johnson <Valirie.Johnson@cityoffederalway.com> Tue 12/31/2019 7:02 AM To: Dana Schmidt <dana@woodlandindustries.net> Cc: Scott Sproul <Scott.Sproul@cityoffederalway.com> Valirie Johnson I Code Compliance Officer F1 of Way 33325 8th Ave South I Federal Way, WA 98003 Office 253.835.2648 I Cell 253.261.2292 I Fax 253.835.2609 Valirie.Johnson@cityoffederalway.com From: Quinlan, Teresa [mailto:teresa.quinlan@pse.com] Sent: Monday, December 30, 2019 2:46 PM To: Valirie Johnson Subject: notification 508674436 33214 33RD AVE SW federal way Hello The electric meter and service to this home have been removed, please pass this on to your contractor Sincerely Teresa Quinlan Customer Construction 1 888 321 7779 Monday thru Friday 7am to 3:30 pm • pscleanair.org Puget Sound Clean Air Agency Notification Case #: 201906280 This page must be printed.A printout of the notification,all amendments to the notification,and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site(Reg III,4.03(a)(6)). Fee Amount Paid $65.00 Credit Card Transaction #AR0A66E14300 Transaction Date 12/20/19 Owner's Name City of Federal Way Phone (253) 835-2648 Project Street Address 33214 33rd Ave SW City Federal Way Zip 98003 Contact Person Valirie Johnson Phone (253)825-2648 Mailing Address 33325 8th Ave S Federal Way,WA 98003 This project includes a demolition. Demolition Start Date 01/02/20 Completion Date 04/02/20 Demolition will be completed by a demolition contractor Demo Contractor Woodland Industries Contractor Job # Contact Lee Rogers Phone (253)606-9663 Mailing Address 10715 66th Ave E Puyallup,WA 98373 (1) I certify that the information I have provided is to the best of my knowledge true and accurate. (2) I understand that I must file an Amendment to this Notification if: • The type of project has changed.The project types are asbestos and demolition. • The quantity of friable asbestos to be removed meets a larger project category. • The projects start or completion date has changed. (3) I understand one Notification must be filed for each structure. The only exception is for a single-family residence that includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street address, I have used a building number. (4) I understand the fees for this Notification are nonrefundable. Create Another Notification View History Loa Out If you have questions,contact us at asbestos@pscleanair.org or 206.689.4058. > m cri N 1.: v 1 1. (al g 0 0 . 4- 0 7 1' N ,--, 0 ,,i' 4- ..-....- -0 t) E g (9 8 t"It (1) 4... E, ,, ,...., a) C: 5 0) - a- 1) 0) L. C A0,14° (U 4 C Cr,j :-1) ,N'ii el "r) ali IMO /Ole, 73. -fn a 37). ° l'at i2, ti) C z cu '4 ::: c -0 Zi3 .,. 'II-* a. - ° .e 4-ik, C •— ...' en 0 Z A Ts C >:. wu , AL t, 0 c 0 0 to ra ....., Li 2 0 .5 2 .' 711Sigilim, 2 CO) 0 ewe TSB et) Lai -0 ....... .., `14. a.1 Z u_ 0 C 71 AzA 0 w It_ 4.81 tr) (1) in .454 Ect ......?.-: . ., -4. ... • - • . . ,„ .. i 't.,. .....; ha e ir 1 ¶ / 90 ,411 e From the Desk of Nelson Miles ryair) F 34004 9"'Avenue South AS tai co+pbc .R Consulting �r"Yrs i,. Federal Way,Washington 98003 vep3 s WOE WV5s22217 rr Telephone{253)952-6717 email nmiies@oriones.net DEMMER 20,2029 Executive Summary ORION Project 019-0602 Lee Rogers Woodland Industries 10715 66th Avenue East Puyallup,Washington 98373 RE: Asbestos Survey Report Fire Damaged Residence 33214 33rd Avenue Federal Way,Washington 98023 Dear Mr.Rogers, The purpose of this report is to present the results of an asbestos survey performed on December 19, 2019 at the subject location referenced above. This survey was conducted in general accordance with the terms of the agreement between ORION Environmental and Woodland Industries(owner's representative)authorizing us to perform this service. We understand that this survey was requested due to a recent fire that occurred at the garage of the subject locations. For quick reference: • No asbestos was identified in the samples collected in association with the fire-damaged residence ORION appreciates the opportunity to provide this service to Woodland Industries. If you have any questions regarding this report,please contact the undersigned at(253)962-6717. Professionally Yours, ORION Environmental Services,Inc. N ,. Nate Reynolds EPA AHERA Building Inspector ORION Environmental Services Teams & Long-Lasting Relationships for Over 30 Years ftn taa (.4 C? C rat sat rat C•4 01 CI A a) 1 : C a (..) 600.0 : .. : : * • ' 0) • . * • • . ... . i • : : : CC : ile. i „ ! S „ „ 4 : 0 0 4 4,1 CO : 13 1 i o 1 .., e : CS 0 0 44 o 5 co 70 1 2 2 0. 5 X 1 4 0 -8 ro ..t4 Ts 1 0) 0 0 t g ; 0 tel a M 0 2 11.) *4 0 40 > 0 41 § A g I -a 1 a 0 5 1 1 i t '''g & ,45 0 X, f.,$.0 b b 0 to w A `,6 0 i A ifs5 ft ; 6 1 ,! 1 (§ g *.4 .-5 A 0 .z 0 0 m .4 en 0 0 ad "1 cl cl 14 ' cl. Cl WI t-4 ti N CI Xi VS "4: PI iti 1 0 0 q 0 . 0 q ..; el CO vd: lt3 33214 33'd Avenue—Federal Way Page 1 Asbestos Demolition Survey of Fire Damaged Residence December 20,2019 1.0 INTRODUCTION ORION Environmental Services,Inc.(OES)was hired by Woodland Industries(owner's representative)to conduct an asbestos survey regarding materials and components that may be impacted during demolition of a fire-damaged residence located at 33214 33r1 Avenue In Federal Way, Washington 98023. OES' assessment was conducted on December 19,2019 and was performed in accordance with federal,state and local regulatory requirements. The assessment was conducted by Nate Reynolds of OES and his accreditation can be found attached to this report. 1.1 Oblective The objective of the survey was to evaluate the potential presence of asbestos in association with the fire damaged garage. The asbestos survey was conducted in general accordance with the, "Good Faith" asbestos survey requirements in the Washington Administrative Code (WAC) 296-62-07721 (Communication of Hazards to Employees)as required by Washington State Department of Occupational Safety Health) (ROSH) and regionally by the Puget Sound Clean Air Agency (PSCAA)for buildings or building sections that are to be renovated and/or demolished. 1.2 Scope of Work The scope of services for the regulated material assessment was limited to the following tasks: a. Performing a "Good Faith" asbestos survey to Identify the presence, location and quantity of ACBM and presumed asbestos-containing material(PACM)that will be Impacted by the proposed project Materials identified as suspect asbestos-containing materials (ACM)were sanded or presumed in accordance with the Asbestos Hazard Emergency Response Act(AHERA)sampling requirements (40 CFR 763) and analyzed by OES' laboratory for the presence and quantity of asbestos. Samples were analyzed using polarized light microscopy (PLM) Environmental Protection Agency(EPA)Method 600/R-93/116. b. Incorporating of the results of the assessment into a written report that includes a description of survey methodology;material descriptions;sample location drawings;results of sample analysis; and material quantities as applicable. 1.3 Umitation 9f the`Aafessmenn This targeted assessment was limited to the fire damaged residence on accessible components that would be impacted regarding the demolition. The conclusions within this report are professional opinions based solely upon visual site observations and interpretations of analytical data as described in this report. Typical construction techniques can render portions of the building Inaccessible. As a result,additional ACBM may be present in inaccessible areas (e.g., ground or components beneath the concrete slab). Suspect ACBM and other hazardous materials within inaccessible areas should be presumed until characterized. Prepared by ORION Environmental Services Project No.019-0602 °I1L;n 33214 33'd Avenue_Federal Way Page 2 Asbestos Demolition Survey of Fire Damaged Residence December 20,2019 The opinions presented herein apply to the site conditions existing at the time of the investigation and Interpretation of current regulation pertaining to asbestos and lead. Opinions and recommendations provided herein may not apply to future conditions that may exist at the site. Regulatory requirement in effect at the time of the work should be verified prior to any work that impacts hazardous materials. This report represents the finding of this survey only and is not intended to establish scope or contractual terms to hazardous material abatement. 2.0 METHODOLOGY Information concerning the subject property was obtained during a site inspection conducted by OES during on December 19, 2019. This section describes the sampling methodology. Supporting documentation provided within the survey reports incudes materials summary tables, photographs, laboratory analytical repots,chain of custody forms,etc. 2.1 Survey Methodology A"walk-through"inspection of accessible areas was conducted to identify suspect ACBM and PACM. The asbestos survey was performed by AHERA-certified building inspectors in accordance with a sampling protocol appropriate for the demolition of the garage. The Inspectors'AHERA certifications are provided in the Appendices. The sampling protocol was modeled after 40 CFR 763.86 and DOSH regulation(WAC 296.62.07721). The approximate quantity of materials was obtained from field measurements. 2.2 )ainellng and Sample Documentation Suspect ACBM was grouped into homogeneous sampling areas and categorized as TSI,surfacing material, or miscellaneous material. The sampling plan included, at a minimum,the collection and analysis of samples as follows: Thermal System Insulatioq • In a distributive manner,a minimum of three samples of each homogeneous area that was not PACM • At least onebulk sample from each homogeneous area of patched TSI if the patch was less than 6 square feet. ,Fina Material • In a distributive manner,a minimum of three samples collected from each homogeneous area that was less than 1,000 square feet • A minimum of five samples collected from each homogeneous area that was greater than 1,000 square feet but less than or equal to 5,000 square feet. Prepared by ORION Environmental Services Project No.019-0602 'O C7 et r.+ tii f 1 n -i T3 N w 0. [T m o N b g W o m 0. ( - R u q c 3 © `` W o o ..' 3 R nor �i m p ora m et i m "! °► � a '� 0 3 o 3 , 0 a 4 • ♦ w ,,, m o _ g Cr '" 'nw &3 :* 1 3 a 1 d � a 3 w 3 ' ` >2 O 3 E • 3 5 3 -r ..w+ Ofo, 0 7 5 ol' t fir O 4 0 w t I o 3 o Nen is v. 2 eg ;; 3- c % s C.0 3 al r et -pC7 8 =r. " a Et a. ,d d_ n e0 as �` n D O O '�) O O 5 _ to H °� 0:: f° O s w 7� w G. �7 Q d ' R. f° K T g ""a'f' 0 g a Si �} +yam c = w m `.. r14 �' N 'C "7'� iR " """" t� ."7° v G a g. g C J. oft . W�/ a H O 0 7 d O 1�Y > >,�+, 3 • v. .g w e� a d 01 ?' a w 23 Fu w •t, ii e: eu «. ^+ O. 7 e° .+ ? 0. Z ro g F Q oma° 3 g ;3 -C w,' ` 3 - E. a rQ w 'c -i„, E. g eg ,c a �w w ti o 4 = E 3 O = c0 Q t7 g Ift .a�s a f.° r Q, �tE x �'?a -1 a o o Zs t TA 0. • in G, Otr rpt 1'�! gs W N r► M E °t 2 6) -0 !° = 2- t . is y w ,. e, crt + ' 3 .. a' `� ma 3 32., E 3 c -+, so p m vdo _sr a ea ? ir = o � � , x2Uy 8 - n 5 O0. t.4 D e� #u a '� !�' O 3 t} O., t° 03 + am lh g. e" g l ei G. a t 3 K `' *. S* TL y�rr r�► m Al or O no q ea t8 1 3 �D C o c arva $ Ui m 3g. tit 3 .° amu 3 „� A� Q" to , E 'i3 i gl , = 0 n pe• 9n° R. O c0. w 0. 0 7 °el ems^^ O fl i4 ,.,,0 13 �i , A ZE n m 09 ' N m Cc. 51 °' w fD m C .. e° cl i o$e 4:0 'c w 5 8 a. o g en E 1 n p ro w 33214 33rd Avenue—Federal Way Page 4 Asbestos Demolition Survey of Fire Damaged Residence December 20,2019 Category I non-friable ACBM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, floor covering mastics and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACBM are all other non-friable materials other than Category I non-friable ACBM that contain more than 1%asbestos. RACM must be removed prior to renovation or demolition activities. Washington Administrative Code(WAC) 173-400-075 adopts the federal NESHAP rule by reference. In the State of Washington,authority to administer NESHAP requirements is delegated to the regional air pollution authorities(e.g.,the local Clean Air Agency or the Washington State Department of Ecology. In Thurston County, the NESHAP requirements are administered by the Puget Sound Clean Air Agency (PSCAA). PSCAA must be notified at least 10 working days prior to demolition of any structure with a projected roof greater than 120 square feet, regardless of whether any asbestos was identified. Notification is not required for renovation projects,unless the project involves the disturbance of friable asbestos containing materials. The owner or operator must also provide Washington State Department of Occupational Safety and Health(DOSH)with written notification at least 10 working days prior to the commencement of asbestos removal projects involving at least 10 linear feet or 48 square feet or RACM. Removal of RACM must be conducted by a State of Washington-certified asbestos abatement contractor. In the State of Washington,worker exposures to asbestos are governed by Labor and Industries;(L&I's) DOSH. The administrative rule WAC 296-62-07705 requires that employee exposure to airborne asbestos fibers be maintained below 0.1 asbestos fibers per cubic centimeters of air(0.1 f/cc)as an eight hour time weighted average. State of Washington Occupational Safety and Health rules also classify construction and maintenance activities which could disturb ACBM,and specify work practices and precautions which employers must follow when their employees engage in each class of regulated work. 4.0 FINDINGS AND RECOMMENDATIONS A total of twelve(12)samples consisting of various suspect materials were processed. No asbestos was identified In these samples.Appendix A Identifies the homogeneous areas sampled,sample identification numbers,material descriptions and analytical results. Laboratory analytical reports and chains of custody are included in Appendix B. 5.0 GENERAL COMMENTS This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the professions currently practicing under similar conditions in the same locale. The results, conclusions and recommendations expressed in this report are based on the conditions observed during our assessment of the work area being Impacted. The information contained in this report is relevant to the date on which this assessment was performed,and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for the use by Woodland Industries for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding further Investigation or remediation deemed necessary. ORION does not warrant the work of Prepared by ORION Environmental Services Project No,019-0602 =, No "0 a a 5 a gi ts W. . 4 1 t'o • re •14 l *440 P qr a Q 0 wa •...• 0 > to zo iia. 1 hc, 12 5 Ai IT, 0• P 0 7 3 ra .o• @ m — az 4 2 2 ca 0 . g. * - a w = - 4,411. , m 3▪ 3* 2 a # 1 . . v., 3 72,— xi er a vw 12ur. 3. 3 -15: g at 3 it, a % ' 6 = * x.7. if 10 re g. C 1 no UP ta 0 at 2. 61 ,.. 33214 33rd Avenue—Federal Way Appendix A Asbestos Summary HOMOGENEOUS SAMPLE NO. DESCRIPTION RESULTS MATERIAL RM 1 1 Three-tab composition roofing and slip sheet ND CT 1 2 Ceiling Tile found in basement ND WS 1 3,4,8,10&12 Wallboard and Taping Mud ND VS 1 5 Kitchen Vinyl Sheeting ND VS 2 9 2"0 Floor Vinyl Sheeting ND DEB 6,7,12 Debris Pile Throughout ND ND—non-detect NOTE: Suspect materials discovered that are not listed are to be presumed asbestos containing. Laboilitora Aroiivtd Asbestos bulk samples and chain-of-custody submittal sheets were delivered to OES Laboratory in Federal Way,Washington for asbestos analysis. As specified in 40 CFR Chapter I(1-147 edition)Part 763,Subpart F,Appendix A,each sample was analyzed using PIM/dispersion staining techniques,in accordance with EPA Method 60018-931116). The detection limit for this type of analysis is approximately one percent(by volume). Materials containing more than one percent asbestos are considered to ACBM.DES performs stratified Point Count Method(400 point count)analysis of any materials initially determined by PLM to less than 10 percent asbestos. fir. Nate Reynold(see attached accreditation) pg.lof1 p w pa ID ' coa. X b CO elC i 4' m 0"3 F I fir' CI N E 3 V N _ ' al o,oi � otl .. Q u. N O v ,;; y .. o Z Z Z Z Z Z Zp Z Z p 1 a 1 Z Z p Z ZZ Z Z Z u d ix 1 t� rr c •+r t4 cra w n, j 9t 0 10 c , Q w F•• ,�� a _ g yr7 -. r. )•a4 E I. ex 43' O ?_1 CI.ass i s . m 6,.„ c eNaF �. 13 0Mfim 8 to 2 ... g 3 X A g : 04 a l N I5 = < 01 ! , a ''' .- .... ... ... .... .... ..mt 'eft. .g.• tor vo w has a a a pQ "ifi le Z is 42 ii f r +- - ht 07 ori to h- eo C7f el N 0 if 1 E i 0 Lt • Q. , ftig.if, 1 c — ,.., -xs i-a- 1Wigi let 110 .1. a . -fit 73 2 0 Ita gItt— NA ' Itti ' .. ... $ c, 10 > c ttit*I1 ocsr... LI g 1 3,3_ I.P'12.gr I a' allifFt ? it Net- 3: 2 * I 1 : p2ili § g13 ;0A 0 . - fug \ al'Ell 841.1.11 a a ii a 11. tcliWP7' ° zfal a a • 14 31,* gx. g " ,.. re 4 10 i 4 w .... F. Z m al. m m = ,.. tT 73 W -81kIti 1 —1 x a gif ! 21 zst = 00 lilt 1 _ aAlegi > — itomnu Bl* g0 #' ag ao 1E4 /:.. .a 3 ..... Z C 6 I * gr3 E. a glr,, litt * igis 1 i i a 5 II. f 1 C4 1131 •,.. 1 h j; „40 1 I 0.. . • rn 11 E. t 0 ..... 0 ... C 'i+ l {r? C' u x C s.. 4 , ''' S - »„zn'^a A, ,- ? ^r .+as ,.� +� § '\ °.y xtr 'S, f k '*.k,�+ ' ;,i 'fir ` - .E'tom. ' k b4^� RA AN . .. ., „,.. ., .. . `fy 5 � 1'\iw tl ...,.. ,.,,....„...,›N ,, _ ,,.......... ,,, ,,„,, BUILDING INSPECTOR =- ' REFRE HE ';: CERTIFICATE E • 4 R { pF{ Ax l' 4t This is to certify that ,, ., 4 t ` Nate Reynolds 1:7.%17: r'1 has attended and satisfactorily completed all requirements to ,...::)z.4 maintain accreditation as an AHERA Building inspector m y '• ` accordance with the Toxic Substance Control m .,, ; Act Title(Section 206)and 40 CFR 763. . ;,i. Accreditation No. BL/R-NES-090319-08 z, Course Date; Sept. 3"d , 21'9 . . � Valid through: Sept. 3 ' , 2020 :g E«._ "PJ" Jour , ar , NOW Environmental Services, Inc. , 34004--9th Avenue South, Suite# 12 s ,,� Federal Way, Washington 98003 . (253)927-5233 r s .,,,,,.„,..,,,,,,,..0„,"„litil,,thi,..!„.,,....t,:.,,.11;:.!..ii,.!::,,,,::-.,!,,,,,,,i,..„,,,,, 14. ,,, ... , : , il 'i ,,,, ,•<,. ' If, ,a ¢ 1 .• . a r y y \ y •� -, � t I # �Y 8F ,C 'a,. Z s 3 r •limittlitiiiiii:f:ta,:st::ifififitsio,;:;:itittoJkP;:.:,ittto:tpi:ittttiltt.;r.r.i.:;,:.1:-;::'-riii;zlli:,:ki;i:',:::,::_.!i,_'::,',::•'•••.•i::.•:!.i; 5#:.'is L5 [ 1 t„ : s , '� fl. �'° co-+ -...q "� i:;; � # � i "'"' � � �; �, ,� �; 1114,7,11,1! •'' ITATOratioxill...0"4,4tafrimitE:aue,;': ,,i-..1 ,,,,,,,,,,1: 'i 1 ,, 4.0, ,.:;,;,,,,,,,;:.., 0 fi • ;,-, . 1.,, „,.."',G: — -: , --tt v cL O -. tea il ',' ' •,*: 1-1t;--''''al f-k-47... ',, K.,',,,, ,4; ;:- c3 ` ax, t P v m 7' `iE# c5 G „.„.„.„....,..4„.41.41., i :.... r..... : 1 41 , . s e,>1,,,, ,,I.t...„..„..„1...„...i , 1.. .1 , .,.;,..iiiiiittil.,:,..11::..,:::::::Eilililit;:tiviiiiiioir.:: ; I i U Gi c Li , _ " ..„ e � J ( r p 1:. 1 :' :: !.: � • �` ,� L,.f; ; : :: 4 ,,ii- ,., s. . • t.„ _. , ' ms's { `�— C z' O .4� „,z ii a. - arLi mk, -, -,'' 17 ii ., I i°r `+jr. . ,r. $ .\ Via..;a ,",,-,•,!-. .•--,„,,,,-------- z, �.::' r... . ,wr, y.F �.. ; FW: cut and cap 33214 33rd ave sw Federal way Valirie Johnson <Valirie.Johnson@cityoffederalway.com> Tue 1/14/2020 8:34 AM To: Dana Schmidt <dana@woodlandindustries.net> Cc: Lee Rogers <lee@woodlandindustries.net> See the below email. We were never notified. What do we need to do next? Valirie Johnson I Code Compliance Officer cid:image004.jpg@01 33325 8th Ave South I Federal Way, WA 98003 Office 253.835.2648 I Cell 253.261.2292 I Fax 253.835.2609 Valirie.Johnson@cityoffederalway.com From: Scott Sproul Sent: Tuesday, January 14, 2020 8:32 AM To: Valirie Johnson Subject: FW: cut and cap 33214 33rd ave sw Federal way From: Miller, Eric [mailto:Eric.Miller@pse.com] Sent: Tuesday, January 14, 2020 8:31 AM To: Scott Sproul; Nease, David Cc: McEntee, Brooke Subject: RE: cut and cap 33214 33rd ave sw Federal way Hi Scott, Our records show that the service cut and cap was completed on 12/19. If you see something different onsite please call me right away. Thank you, Eric Miller Construction Manager Puget Sound Energy Construction Performance Management Lakewood/Tacoma Office 425-417-8522 ® 811 CBYD Logo From:Scott Sproul<Scott.Sproul@cityoffederalway.com> Sent:Tuesday,January 14, 2020 8:24 AM To: Miller, Eric<Eric.Miller@pse.com>; Nease, David <David.Nease@pse.com> Subject:cut and cap 33214 33rd ave sw Federal way CAUTION:This email originated from outside of the organization. Exercise extra caution when responding, opening attachments, and clicking links. Good Morning: The City of Federal Way Code Compliance has gone through the process to take control of the nuisance property and we have a demo contractor on board to remove the home. I was wondering if you code provide a time frame as to when the gas line would be capped Scott Sproul I . FW: 33214 33rd ave sw fire damage home Valirie Johnson <Valirie.Johnson@cityoffederalway.com> Wed 1/22/2020 11:01 AM To: Dana Schmidt <dana@woodlandindustries.net> FYI, Is this the final step in the permits needed? Valirie Johnson I Code Compliance Officer ® cid:image004.jpg@01 33325 8th Ave South I Federal Way, WA 98003 Office 253.835.2648 I Cell 253.261.2292 I Fax 253.835.2609 Valirie.Johnson@cityoffederalway.com From: Brian Asbury [mailto:BAsbury@lakehaven.org] Sent: Wednesday, January 22, 2020 8:38 AM To: Scott Sproul Cc: Valirie Johnson Subject: RE: 33214 33rd ave sw fire damage home Water meter has been removed. Brian Asbury Development Engineering Supervisor cid:image001.png@01D243DD. 3CADOODO Lakehaven DE Website From: Brian Asbury Sent:Tuesday,January 21, 2020 2:46 PM To: 'Scott Sproul'<Scott.Sproul@cityoffederalway.com> Cc: 'Valirie Johnson'<Valirie.Johnson@cityoffederalway.com> Subject: RE: 33214 33rd ave sw fire damage home Water meter will be removed this week. Brian Asbury Development Engineering Supervisor cid:image001.png@01D243DD. 3CADOODO Lakehaven DE Website From: Brian Asbury Sent:Tuesday,January 21, 2020 1:51 PM To: 'Scott Sproul' <Scott.Sproul@cityoffederalway.com> Cc:Valirie Johnson<Valirie.Johnson@cityoffederalway.com> Subject: RE: 33214 33rd ave sw fire damage home I'm checking on why that hasn't yet been removed, we received payment on 12/27/19. I'll update ASAP. Sewer service disconnect was performed/completed on 1/6/20. Brian Asbury Development Engineering Supervisor cid:image001.png@01D243DD. 3CADOODO Lakehaven DE Website From:Scott Sproul<Scott.Sproul@cityoffederalway.com> Sent:Tuesday,January 21, 2020 1:36 PM To: Brian Asbury<BAsbury@lakehaven.org> Cc:Valirie Johnson<Valirie.Johnson@cityoffederalway.com> Subject: 33214 33rd ave sw fire damage home Brian The city has taken control of the property and we have a contractor that could possibly start next week they have paid for the meter to be removed,was hoping to see if you could get this done a little faster so I can issue the demo permit.Or let me know when it will be completed Thank you for your help This home was an arson fire and the owner is MIA Scott The contents of this email may be determined to be a public record and subject to disclosure pursuant to RCW 42.56 regardless of any expectations or claims of confidentiality or privilege asserted.