98-100111 y tk 98., 1061//
CrTY Mr FEDERAL WAY N llll � p PERMIT NO: MEC98.0009
33530 Fi rst Way South ii'``'i „, 't... It U°�' .,u". IC1'""il .w" II'""� El: k. '"'' ,., '"I!" ISSUED: 01/12/98
Federal Way, WA 98003 Mechanical Inspection Requests 253-661•-4140 BY: FC2
253-661-4000 EXPIRES : 07/10/99
ADDRESS : 2810 SW 341ST CT
NO. : 010921-0120
PROJECT DESCRIPTION:gas water heater and gas furnance
f= OWNER . -- . T- CONTRACTOR --_. _____-, I. LENDER ___. -_-
STEVE WI50R ; OWNER IS CONTRACTOR
2810 SW 341ST CT `
FEDERAL WAY WA 98023 Q4
1
253-838-3220 1
s
(
Ua CONTRACTORS, PLEASE USE LOCATION CODE 1732 WHEN REPORTING SALES TAX FOR PROJECTS WITHIN THE CITY OF FEDERAL WAY. TAX RATE = 8.25 m
Mme._: __ _,..___ _ ..___.:_..__._. ...__.,::---_ .::::.---_---._--------_ ---
j
PROJECT VALUATION 1500 FEES: 1
FUEL TYPES.:ELE GAS FANS • 0 BOILERS/COMPRESSORS Mechanical Permit* $ 42.00
GAS PIPING.: 40 ft HOOD • 0 0-3 TON • 0 1 MEC PRMT ISSUANCE... $ 20.00
FURN<100K..: 1 DUCT WORK • 1 3-15 TON • 0
GAS HWT • 1 WOOD STOVES...: 0 15-30 TON...: 0
CONV BURNER: 0 F'URN>100K 0 30-50 TON...:0 (
BBQ 0 MISC • 0 50+ TON 0
GAS DRYER..: 0 AIR HANDLING UNITS FUEL TANKS '
RANGE • 0 <:10,000 CFM: 0 ABOVE GROUND: 0 I
GAS LOGS...: 0 > 10,000 CFM: 0 UNDERGROUND.: 0 1 TOTAL FEES $ 62.00
em.. _..._- -- -- ._--------- ____. . .__._ • __ -- --�
Does the water supply system contain a Pressure Reduction Device or Check valve? ( ) Yes ( ) No (If "Yes" then water expansion tank is required on Hot Water Tank)
Inspection Record: Mechanical Rough-in Date Gas Piping Date
MECHANICAL FINAL Date
PERMITS EXPIRE 180 DAYS AFTER ISSUANCE IF NO WORK IS STARTED.
I CERTIFY THE INFORMATION FURNISHED BY ME IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND THE APPLICABLE CITY OF FEDERAL WAY REQUIREMENTS WILL BE MET.
OWNER OR AGENT _ ''°e— -. DATE /101— 7
FILE COPY
- ..• . -- - .
AdO3a131A
)7
- ... . .........
— ...
•:
•-•C\ 1111 18 111A SIN1111111011 IA 11011011 40 AID 110011441 3$! 0111 191131110113 AM W ISA 311! 0! 1/11110) ON 3111 51 111 AA 01RS1N00-1 110111/1110111 3311 A111111) 1
43111115 SI 1001 ON II 331VASSI 113110 SAVE OBI 111141X1 S111114
, I
I -
81E4 - -4C- ' ---7i5 101111 111)I1111031i i
, _ ...... „._. ....... .,....
2,s-tr....1 alto r •-•'..:7--&------- 64.14-!d SE') alea ul16no4 (e)Tueq)aw :pioai uop)adsul
(4ur) ialtg loH uo paimbai s! 4uel uoputdxa jai th uaqi isaA. II) ow ( ) saA ( ) ZaAIEA 4)aq) 10 0)!Aaa uo!lnpas aJossaid t ult;uo) salsAs Alddfis Jalen ain aaop I
00.Z.9 $ S134 11/101 0 :*(1111,11511301111 0 ,1147) 00001 < 0 :• 5501 WO
o :01111(J09 3A0111 \ # •111)600'01:) 0 • 3911114
-..*.L3140i 1N1 SJJ Stl10011 sIU
ig !,**w.001 *0; il ''..**,7"*0- ')S10
,.. ., .4* '
.,%4_: ,-;44 Net 0$,-00, 0 t' --,)$,U11)101 0 :—$3AN SV3
o • Nig
0 :1111000 A140)
- I , •,, - , , I/ :**•110.1 Ot41 . , A '''...svais tflos 1 • 11113 SO
0 ;44"110. ,72,11011.1)## 1 :.•300.1411114
00•OZ, $ ".3)NWISSI OW )10 '' '0 : '701 0.0 . ;‘-' "'QOM 11 1) :'913ldId Sk19
00.7,, $ *1!iu04 TP310043011 ' 5#05133,n0s#11108 t 1 51104 S09 313:•Si4Al 13134
:5334 00S1 11011001VA 1)31'014(1
.11,-..x.0ae,,Myttv-4,3..ro^,wmV.es-Unu*,A.-x- ...”- "...,f IV., ... ' ^......... "..
in W8 : 31011 XVI *AVN 10113011 10 AID RI 818118 51.13f0114 WI XVI 511V5 5N1004311 t#M, U1 110) #011n111 ti' J.A114 501M11.3 in
.....* ......
OZ41.-8E8-ESI,
EZ086 t111 AWl 10113034
ID !Sin AS UBZ
1101)0111110) SI 831110 $05111 3A315
ti)ueuini se6 put Jaltaq Jail'', st6:No i i(i 1 I•)',3:_1(1 I )-Ift)c.ld
1"),'-10- L60 L() ; "ON
1.1 IS1.9r, M 01,13•7,:S.JTe40119
(100.7 T99-E'l?
(I' .)..1 ..q1 ()'.i.1.9 1:99- c.,3z, ,:.,rit,, tibEyd uoli
; ,:›ed-...-,u1 Tp ) jurq.y,41 E 0086 VM 6 AeM (eA
' 8.57('..I71.0 :0-111F; 11 TWH:441 1V-4) IN VHD314 WtnoS ArM l',-..,JTA 01-Sa':it
6000-86)3W :ON IIWIJ3d A9M lIdd30 !A JO Att )
!
ft/ Q01 -gb "..1,~ - • '
•
1 SETBACKS & FOOTINGS
Date By
2 FOUNDATION WALLS
Date By
...............................................................................................
...............................................................................................
.................................................................................................
...............................................................................................
3 PLUM[BIfNLt3Rt?kJF11WORK>< << > ><>>>«» »».
Date By
4 SLAB INSULATION.
Date By
5 FQOTING/DOWNSFQUT DR111I1( :: :::::: :::::
Date By
.................................................................................................
................................................................................................
.................................................................................................
6 UNDERFLOtR FRAMING >€€> > €<> > > > >
................................................................................................
.................................................................................................
Date By
.................................................................................................
................................................................................................
.................................................................................................
7
A .. .AL
.................................................................................................
................................................................................................
Date By
8 PLU ABING::ROUGW-tN...:::...
Date By
Date [— 2, i'S By -Di,
.................................. ............................................................
.................................................................................................
10 MECI ANICAL ROUGH
............................................:..............................................
.............................................................................................
. . .......................... .............................................................
Date i 2...9 ,5 43, By D L_
11 FRAMING
Date By
.. . ..........................................................................................
.................................................................................................
................................................................................................
12
................................................................................................ _
.................................................................................................
Date By
................................................................................................
.................................................................................................
................................................................................................
13 G11118 #S'C LAYER
Date By
.................................................................................................
.................................................................................................
14 t3W
:.................................................................................................
................................................................................................
Date By
.................................................................................................
.................................................................................................
.................................................................................................
.................................................................................................
15 SUSFENDED;CEILINt .:>
Date By
........... .. .............................................................................
.... ........ . . .............................................................................
................. .............................................................................
16 PLANNING FINAL:
Date By
17 PUBLIC>WORKS
Date By
.................................................................................................
.................................................................................................
18
.................................................................................................
.................................................................................................
Date By
..................................................................................
....................................................................................
.....................................................................................
19 BUILDI
....... .. .....................................................................................
.......... ......................................................................................
........ .....................................................................................
Date gi By DL-
�o aTHER � - i
Date t—)21 _CI By 14Act.G
CD0193(Rev 4/97)
cE,CE1\IED
CITY OF G BUILDING DIVISION
M7333530 First Way South
uv ETZFiL JAN 1 2 1998 Federal Way,WA 98003
(253)6614000
.„rt-WAY Fax(253)661-4129
o,i_uitvu DEPT
APPLICATION FOR MECHANICAL PERMIT
MEC I r— Q° I
PARCEL # Single Family d Multi-Family El Commercial El
SITE LOCATION
Tenant/Owner Steie (fit S`� Phone oa3 ?,i h' -3• ‘2-4.)
Address/City/State/Zip ' '11) - 3Yl 7L Feick,( ivy • 7'42
Nature
3
Nature of Work i /��"f Project Valuation:$ /S"
APPLICANT
Name 3 /I've l'✓l52r
Address/City/St/Zip yid `' -y/ 6 I e (' y kt/ijJ1.
Contact Person
Phone(-Is.) "�� Fax
Fax
MECHANICAL CONTRACTOR
Company Name N"n
Address/City/St/Zip
Contact Person Phone Fax
State L&I Contractor Registration# Exp.Date
(Card must be presented)
MECHANICAL UNIT COUNT
Fuel Type(gas/other) /• Gas Dryer Air Handling<=10,000cfrn Fuel Tanks:
Lengthpiping r
of gas p pn g �{C Range Air Handling>=10,000cfm Above Ground
Furn<100K BTU's x Gas Log Unit Heater Underground
Furn>100KBTU's Fans Boiler BTU/H Miscellaneous
Gas Hwt /` Hood Boiler BTU/H Other
Cony Burner Duct Work Pel A/C TONS Other
...................................................................
....................................................................
...................................................................
....................................................................
RBQ's Wood Stoves A/C TONS
DISCLAIMER:I certify,under penalty of perjury,that the information furnished by me is true and correct to the best of my knowledge and further that I am authorized by the owner of the above premises to perform the work
for which permit application is made.I further agree to save harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in investigation and defense of such claim),which may be
made by any person,including the undersigned,and filed against the City of Federay Way but only where such claim arises out of the reliance of the city,including its officers and employees,upon the accuracy of the
information supplied to the city as a part of this application.
Qw�r/Agent- ��'�° 3— Date / Id" 9
Mecu.APp
Revrsio 8/26/97