Loading...
10-103397 City of Federal Way • P• • Mechanical Permit #: 10-103397-00-M E Community Development Services P.O.Box 9718 Federal Way,WA 98063-9718laidai 14, Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050 Project Name: AMBUEHL Project Address: 861 SW 345TH ST Parcel Number: 132170 0380 Project Description: Replace gas 60k btu furnace& install 2.5 ton a/c unit Owner Applicant Contractor RICHARD&VIRGINIA AMBUEHL WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO 861 SW 345TH ST NORTHWEST PERMIT/WESCO (GENERAL) FEDERAL WAY WA 98023-8405 1345 W GULF RD WASHIES971OB(9/2/11) POINT ROBERTS WA 98281 2800 THORNDYKE AVE W SEATTLE WA 98199 . .. � ' ." ` Mechanical Valuation 8235.50 Is this an Online or O.T.C.application? Yes ;� �._ 'm ' •. f a� g a . Air Conditioners-Stand Alone Un 1 Furnaces 1 PERMIT EXPIRES Saturday, February 5, 2011 Permit Issued on Monday, August 9, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws,rules and regulations of the State of Washington 01‘1���he City of Federal Way. I/o Owner or agent: Date: / ' THIS CARD IS TO AIN ON-SITE • CITY OF • 0 Construction Ins ction Record Federal Way INSPECTION REQU TS: (253)835-3050 PERMIT#: 10-103397-00-ME Address: 861 SW 345TH ST Owner: RICHARD & VIRGINIA AMBUEHL FEDERAL WAY, WA 98023-8405 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough-in (4165) El Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By n Date - 2 T_t.. 3 1 El Rough ElectricalCI Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date