09-104596 •
- • Mechanical
City of Federal Way Q
Community Development Services Permit #: 09-104596-00-M E
P.O.Box 9718
Federal Way,WA 98063-9718 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax (253)835-2609 P 4
Project Name: VELAZCO
Project Address: 31113 5TH AVE S Parcel Number: 082104 9253
Project Description: Replace gas 60k btu furnace w/20' gas piping
•
•
Owner Applicant Contractor
CARLOS I VELAZCO CYNDAL MILLHOLLIN WASHINGTON ENERGY SERVICES CO
31113 5TH AVE S NORTHWEST PERMIT INC/WASHINGTON (GENERAL)
FEDERAL WAY WA 98003-4047 ENERGY SERVICES WASHIES971OB(9/2/11)
1345 W GULF RD 2800 THORNDYKE AVE W
POINT ROBERTS WA 98281 SEATTLE WA 98199
ut
A?"
m.,'r„°•�,`,, ,,,,..,. '�'s�sli„ ,.r,.. �Kava ._... ,.. t<r. .. .^r'[r d x.h._ ., W ... �'".., .. aa,:•.. '•:
Mechanical Valuation 9392.00 Is this an Online or O.T.C.application? Yes
4 .fie
Furnaces`. 1 Gas Piping 1 Gas Pipe Outlets
PERMIT EXPIRES Saturday, May 22, 2010
Permit Issued on Monday, November 23, 2009
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way. 1/1A/
49
Owner or agent: 0Ne Date:
' THIS CARD IS T MAIN ON-SITE
440 F,Ft_
Construction I ection Record
Federal Way ezcz, INSPECTION REQ TS: (253)835-3050
PERMIT#: 09-104596-00-ME Address: 31113 5TH AVE S
Owner: CARLOS I VELAZCO FEDERAL WAY, WA 98003-4047
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) ❑ Final-Mechanical(4065)
Approved Approved to release test Approved
By Date ByD Date r -1f1-�R . -By_.0 .%-` _ Date _-a...____ 2.._j-4Q
•
0 Rough Electrical Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date