Loading...
12-105073 • Mechanical City of Federal Way Community&Econ.Dev.Services FILE Permit #: 12-105073-00-ME WFederal Way,WAA98003 Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050 Project Name: SEARS Project Address: 30429 3RD PL S Parcel Number: 232960 0080 Project Description: Replace furnace Owner Applicant Contractor ELIZABETH H SEARS SARAH TURNER GLENDALE HEATING&A/C PO BOX 66719 GLENDALE HEATING&A/C GLENDHA053Q2 (11/2/13) SEATTLE WA 98166-0719 12462 DES MOINES WAY S 12462 DES MOINES WAY S SEATTLE WA 98168-2266 SEATTLE WA 98168-2266 Additional Permit Information Mechanical Valuation 2127 Is this an Online or O.T.C.application? Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Monday, May 6, 2013 Permit Issued on Wednesday, November 7, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ON L i N E Date: PIIS it /e04 THIS CARD IS TO MAIN ON-SITE ' ` CITY OFCITY • Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 12-105073-00-ME Address: 30429 3RD PL S Project: ELIZABETH H SEARS FEDERAL WAY, WA 98003-4006 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough-in(4165) 0 Gas Piping(4125) El Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By fr2 c Date //-2&_/z 0 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date