Loading...
12-104848 t , • Mechanical City of Federal Way Community&Econ.Dev.Services I 33325 8th Ave S FE Permit #: 1210484800M E Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p � Project Name: BEERS 9 q I I Project Address: 30351 9TH AVE S Parcel Number: 515365 0200 Project Description: Install 95%gas furnace • Owner, Applicant Contractor DEBORAH BEERS TERESA ANDERSON VALLEY FURNACE INC 30351 9TH AVE S VALLEY FURNACE INC VALLEFI161R6(12/26/13) FEDERAL WAY WA 98003 7818 E RIVER RD PO BOX 507 PUYALLUP WA 98371 PUYALLUP WA 98371 Additional Permit Information Mechanical Valuation 2884.00 Is this an Online or O.T.C.application? Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Sunday, April 21, 2013 Permit Issued on Tuesday, October 23, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington oNLINsederal Way. • Owner or agent: Date: FIN A ► r u / i /it • THIS CARD IS TO MAIN ON-SITE , CITY OF Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 12-104848-00-ME Address: 30351 9TH AVE S Project: DEBORAH BEERS FEDERAL WAY, WA 98003-4101 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By Date\1� 1—, FILE 0 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date