12-104848 t , • Mechanical
City of Federal Way
Community&Econ.Dev.Services I
33325 8th Ave S FE Permit #: 1210484800M E
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609 p �
Project Name: BEERS 9 q I I
Project Address: 30351 9TH AVE S Parcel Number: 515365 0200
Project Description: Install 95%gas furnace
•
Owner, Applicant Contractor
DEBORAH BEERS TERESA ANDERSON VALLEY FURNACE INC
30351 9TH AVE S VALLEY FURNACE INC VALLEFI161R6(12/26/13)
FEDERAL WAY WA 98003 7818 E RIVER RD PO BOX 507
PUYALLUP WA 98371 PUYALLUP WA 98371
Additional Permit Information
Mechanical Valuation 2884.00 Is this an Online or O.T.C.application? Yes
Mechanical Fixtures
Furnaces 1
PERMIT EXPIRES Sunday, April 21, 2013
Permit Issued on Tuesday, October 23, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
oNLINsederal
Way. •
Owner or agent: Date:
FIN A ► r
u / i /it
• THIS CARD IS TO MAIN ON-SITE ,
CITY OF
Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 12-104848-00-ME Address: 30351 9TH AVE S
Project: DEBORAH BEERS FEDERAL WAY, WA 98003-4101
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By Date\1� 1—,
FILE
0 Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date