Loading...
11-101999 City of Federal Way • • Electrical Community Development Services Permit #: 11-101999-00-EL P.O.Box 9718 FILE Federal Way,WA 98063-9718 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax (253)835-2609 p Q Project Name: LBA REALTY - Project Address: 33405 8TH AVE S Parcel Number: 926500 0060 Project Description: Altering one circuit to add/alter 24 light fixtures in the core area of the building-building lobby and corridor of the 2nd floor. OwnerApplicant Contractor LBA REALTY DREW MACKEY EVERGREEN POWER SYSTEMS 660 SW 39TH ST SUITE 255 EVERGREEN POWER SYSTEMS,INC EVERGPS95OBE(1/5/13) RENTON,WA 98057 3623 E MARGINAL WAY S 3623 E MARGINAL WAY S SEATTLE WA 98134 SEATTLE WA 98134 - r ���, s '��? Fy�', 04;4.;-'11 a It'lnfor'i,-� ' Fr � x Is Use Educational or Institutionai9 No Service greater than 999 Amps? No • Fs .e... � .,.�.. c' , :� Circuits-Commercial 1 PERMIT EXPIRES Friday, May 18, 2012 Permit Issued on Thursday, May 19, 2011 I hereby certify that the above information is correct and,that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washin ton an the gpf Federal Way. Owner or agent: DµLDate: THIS CARD IS TO MAIN ON-SITE CITY OF Construction I ection Record . Federal Way INSPECTION REQU TS: (253)835-3050 PERMIT#: 11-101999-00-EL Address: 33405 8TH AVE S Project: LBA REALTY FEDERAL WAY, WA 98003-6305 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Rough Electrical(4225) ❑ Ceiling Cover(4020) ❑ Final-Electrical(4055) Approved Approved Approved By Date By Date alb.. Date&- -'/ FiLE El Rough Electrical El Final ElectricalEl Right of Way Approved Approved Approved By Date By Date By Date