10-104707 Electrical
City of Federal Way 410 411
Community Development Services Permit #: 10-104707-00-E L
P.O.Box 9718
Federal Way,WA 98063-9718 q Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609 FILE
Project Name: BRIGHTON PARK LOT 21
Project Address: 923 SW 365TH PL Parcel Number: 111263 0210
Project Description: Install L/V T-stat wire for new construction installation
•
Owner Applicant Contractor ,
NORRIS HOMES INC CARA WEREMUTH SOUND HEATING&A/C(ELECTRICAL)
2053 FABEN DR SOUND HEATING&A/C INC SOUNDHA006DA(5/17/12)
MERCER ISLAND WA 98040 5526 184TH ST E SUITE A 5526 184TH ST E SUITE A
PUYALLUP WA 98375 PUYALLUP WA 98375
e0,,,,..m., � A • • � e 6 a ,,i � I tern.
,,,,, ' `' y, :<'4,4,79.(°„:*'. �P.,.. .. -._. �" �, =fz _ .��.
Is Use Educational or Institutional9 No
Thermostat I
PERMIT EXPIRES Friday, November 4, 2011
Permit Issued on Thursday, November 4,2010
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
ON LI gipof Federal Way. ', /4//DOwner or agent: Date:Filt`1 14' / r--
f(eif
. ' • THIS LARD IS TO RE IN ON-SITE -- •
CITY OF„_....42N__ _41/4
'�' ' Construction Ins tion Record
Federal Way INSPECTION REQ TS: (253)835-3050
PERMIT#: 10-104707-00-EL Address: 923 SW 365TH PL
Project: NORRIS HOMES INC FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El UFER Ground (4295) ❑ Ditch cover(4030) ❑ Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
❑ Pool Bonding(4195) ❑ Temporary Power(4275) El Service(4235)
Approved Approved Approved
By Date By Date By Date •
❑ Feeders/Sub-panels(4045) ' ❑ Rough Electrical(4225) 0 Ceiling Cover(4020)
Approved Approved Approved
By Date By 0 Date!1• •A By Date
O Final-Electrical(4055)
Approved
fiqr/ Date 2 (6_ I /
•
FILE
❑ Rough ElectricalEl Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date