Loading...
11-103750 ' • • Eletri�-al_ City of Federal Way Community Development Services I L Permit #: 11103750-00-EL P.O.Box 9718 Federal Way,WA 98063-9718 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p q Project Name: WYNSTONE LOT 23 Project Address: 1211 SW 340TH ST Parcel Number: 957814 0230 Project Description: 200 AMP SERVICE/SQ FT 2663 Owner ADDlicant Contractor QUADRANT CORPORATION CHERIE OWENS MERIDIAN CENTER ELECTRIC INC 14725 SE 36TH ST UNIT 200 MERIDIAN CENTER ELECTRIC MERIDCE318SG(2/28/13) BELLEVUE WA 11109 E 66TH AVE 11109 66TH AVE E PUYALLUP WA 98373 PUYALLUP WA 98373 Is Use Educational or Institutional? No New Service:Residential 1 Thermostat 1 PERMIT EXPIRES Friday, September 14, 2012 Permit Issued on Thursday, September 15, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. A I Owner or agent: ONLINE Date: q A S Z1/413/1/ • THIS CARD IS TO MAIN ON-SITE CITY OF - Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 11-103750-00-EL Address: 1211 SW 340TH ST Project: QUADRANT CORPORATION FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ UFER Ground (4295) ❑ Ditch cover(4030) ❑ Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date _ `d._ By Date By Date El Pool Bonding (4195) 0 Temporary Power(4275) 0 Service(4235) Approved Approved Approved By Date By Date By (Lk, DateLq....,c3t,.. ii, ❑ Feeders/Sub-panels(4045) ElRough Electrical(4225) ,El Ceiling Cover(4020) Approved Approved Approved By Date By _ Date 1%.-3\--- t.1 By Date _ ❑ Final-Electrical(4055) Approved By !� Date 1 1.-—2.42,-A l ❑ Rough Electrical CI Final Electrical Right of Way Approved Approved Approved By Date By Date By Date