11-100619 I
I - Elkctrical
City of Federal Way •
Community Development Services PLEermit #: 11-100619-00-EL
P.O.Box 9718 � '
Federal Way,WA 98063-9718 Inspection Request Line:
Ph:(253)835-2607 Fax:(253)835-2609 p Q (253)835-3050
Project Name: WYNSTONE LOT 38
Project Address: 1326 SW 340TH ST Parcel Number: 957814 0380
Project Description: NEW 200AMP SFR/SQ FT 2715/UFER
Owner Applicant Contractor
QUADRANT CORPORATION CHERIE OWENS MERIDIAN CENTER ELECTRIC INC
PO BOX 130 MERIDIAN CENTER ELECTRIC MERIDCE318SG(02/28/11)
BELLEVUE WA 98009 11109 E 66TH AVE 11109 66TH AVE E
PUYALLUP WA 98373 PUYALLUP WA 98373
•
Is Use Educational or Institutional? No
Low Voltage-Burglar Alarm(Res 1 New Service:Residential 1
PERMIT EXPIRES Saturday, February 11,2012
Permit Issued an Friday, February 11,2011
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the'Cityyf Federal Way.
Owner or agent: 0 1%11Date: ZA ,I(
f
iNLto
Sfi ' (u
p.
THIS CARD IS T MAIN ON-SITE .,ern of Construction I ection Record
Federal Way INSPECTION REQUE TS: (253) 835-3050
PERMIT#: 11-100619-00-EL Address: 1326 SW 340TH ST
Project: QUADRANT CORPORATION FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El LIFER Ground(4295) ❑ Ditch cover(4030) El Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By C-�� Date a `� �) 1 , By Date .By Date
'0 Pool Bonding(4195) � Temporary Power(4275) Cl Service(4235)
Approved Approved Approved
• By Date By Date By j(S Date 3 ..� `//
0 Feeders/Sub-panels(4045) El Rough Electrical(4225) El Ceiling Cover(4020)
Approved Approved Approved
By Date By C S Date 7-z9 I / By Date
0 Final-Electrical(4055)
Approved
R4-5
Date//—//
FILE
❑ Rough Electrical El Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
e