20-100940 Mechanical
City of Federal Way Permit #:20-100940-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: COOPER
Project Address: 3104 SW 341ST ST Parcel Number: 858120 0280
Project Description: like for like hot water tank replacement
•
Owner Applicant Contractor
MAUREEN COOPER LUCINDA HONEYCUTTBOB'S HEATING BOB'S HEATING&A/C INC(GENERAL)
3104 SW 341ST ST &A/C INC BOBSHHA853NQ(9/7/21)
FEDERAL WAY WA 98023-7738 14148 NE 190TH ST
KIRKLAND WA 98072 14148 NE 190TH ST
WOODINVILLE WA 98072
Additional Permit Information
Mechanical Work Valuation? 1800 Is this an Online or O.T.C.application') Yes
.e 12.,7 ��.= r, 0 3�3 ��t� ... -a ��" � 3� As,BIA:fri.. _ _ ".1;444%90 ,... ,;;:;,;,,06,! ,. ..zi2 10 ,n—
Hot Water Tanks 1
PERMIT EXPIRES Sunday,30 August,2020
Permit Issued on Tuesday,March 3,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washin ton and the City of Federal Way.
Owner or agent: ® LINE Date:
/,
r I
I . , J I . , woo
THIS CARD IS TO REMAIN ON-SITE
•
• CITY OP
'V144 Construction Inspection Record
Federal way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 20 100940 00 Address: 3104 SW 341ST ST
Project: JOSEPH COOPER FEDERAL WAY WA 98023-7738
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
• ,• .•
Q Mechanical Rough-in(4165) 1 ® Gas Piping(4125) � Final-Mechanical(4065)
Approved ` Approved to release test Approved
,By Date By
• Date ' By( 5 Date ,
• t�
•
Rough Electrical ❑ Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date