Loading...
20-100977 Electrical CityyDevelralWay ' jj• 4 (��'J�'J T Community a Federal e drat Way DeptF. Permit #•20-1009/ /-00-EL LE 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: GLEN PARK APARTMENTS BLDG 31 Project Address: 952 SW CAMPUS DR Parcel Number: 192104 9047 Project Description: FIRE ALARM CONTROL PANEL REPLACEMENT-ELECTRICAL Owner Applicant Contractor PRIME WOODLEY CAMPUS DRIVE LLC MARK JENSENINNOVATIVE SYSTEMS INNOVATIVE SYSTEMS TECHNOLOGY 600 MONTGOMERY ST SUITE 1700 TECH,INC. INC(EL 01) SAN FRANCISCO CA 94111 1402 LAKE TAPPS PKWY SE SUITE 104-147 INNOVST881B4(1/24/22) AUBURN WA 98092 402 LAKE TAPPS PKWY SE SUITE 104-14' AUBURN WA 98092 Additional Permit Information Is this an Online or O.T.C.application? Yes Wes 1�i 3 4r, t at. �a z . '�a e t 3F� � �. �l��t�. ��a Le� s� ��F 3 3 3 � z r3 w'� � '�� � Low Voltage-Fire Alarm(Co 1 PERMIT EXPIRES Friday,5 March,2021 Permit Issued on Thursday,March 5,2020 I hereby certify that the above informattsiion is correct and that the construction on the above described property and the occupancy and the use will be in accor 'th the laws, rules and regulations of the State of ngttof Federal Way. Owner or agent O Date: I THIS CARD IS TO REMAIN ON-SITE OW OP 4024 Construction Inspection Record Federal way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 20 100977 00 Address: 952 SW CAMPUS DR Bldg 31 Project: PRIME WOODLEY CAMPUS DRIVI FEDERAL WAY WA 98023-5056 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ,El UFER Ground(4295) VD Ditch cover(4030) ,; Q Slab/Concrete Floor(4255) Approved Approved I Approved to place concrete •By Date �`By Date .l By Date Pool Bonding(4195) Temporary Power(4275) Service(4235) Approved I Approved Approved By Date 1 By Date By Date , ® Feeders/Sub-panels(4045) ® Rough Electrical(4225) Q Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date 1:11 Final-Electrical(4055) Approved l By /,..I Date 31jk/20) • El Rough Electrical ❑ Final ElectricalElRight of Way Approved Approved Approved By Date By Date By Date