20-100921 r -
r
Mechanical
City of Federal Way Permit #:20-100921-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 ' Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
LE
Project Name: HUYNH
Project Address: 1215 S 312TH ST Parcel Number:787500 0045
Project Description: install of heat pump and air handler
Owner Applicant Contractor
PHUC-MINH HUYNH STEVEN HUNTECO AIR NW ECO AIR NW
1215 S 312TH ST 32829 S 32829 PACIFIC HWY ST 32829 PA ECOAIAN817L7(6/27/21)
FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 {2829 S 32829 PACIFIC HWY ST UNIT 489+
FEDERAL WAY WA 98003
Additional Permit Information
Mechanical Work Valuation? 8206.92 Is this an Online or O.T.C.application9 Yes
;7`
'mss - 3 Y § .•3
Compressors/Heat Pumps
PERMIT EXPIRES Saturday,29 August,2020
Permit Issued on Monday,March 2,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washin ton and th • f Federal Way.
Owner or agent: ON I Date:
1
f ,
• -40/11 . THIS CARD IS TO REMAIN ON-SITE
Federal WayConstruction Inspection Record
INSPECTION REQUESTS: (253)835-3050
PERMIT#: 20 100921 00 Address: 1215 S 312TH ST
Project: PHUC-MINH HUYNH FEDERAL WAY WA 98003-4716
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
'•
0 Mechanical Rough-in(4165) ! 0 Gas Piping(4125) Q Final-Mechanical(4065)
Approved Approved to release test Approved
By Date , By Date By Lee) , Date ,.tea
0 Rough Electrical El Final Electrical [J Right of Way
Approved Approved Approved
By Date By Date
By Date