20-100343 9 � z
Building - Commercial
City of Federal way Permit #:20-100343-00-CO
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax (253)835-2609
Project Name: TILT 348-NEUMEIER ENGINEERING
Project Address: 1019 S 351ST ST Parcel Number: 202104 9027
Project Description: Tenant improvement to include installing pallet&cantilever racks.No Plumbing or
Mechanical.
Owner Applicant Contractor Lender
NEUMEIER HOLDINGS LLC TOM GASTONDACO DACO CORPORATION OWNER IS LENDER
22610 88TH AVE S SUITED CORPORATION 8825 S 184TH ST
KENT WA 98031 8825 S 184TH ST KENT WA 98031
KENT WA 98031
Census Category: 437-Commercial alt/add/conversion
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area(sq.ft.)
Additional Permit Information
Mechanical to be Included? No Number of Stories 1
Is this an Online or O.T.C.application? No Permit for Building Shell Only? No
Plumbing to be Included? No
Total Valuation:12,210.00
�. . .. r- . ,,. ... c..• � ��._�. ° a' ,,.' ... � fit> :P-A0
CONDITIONS:
If an operational permit for high piled storage has not been issued ensure the operational permit states
the following: " ESFR Class I-IV.Max storage height is 35'.No encapsulated pallet?' This operational
permit is for this set of racks only.
PERMIT EXPIRES Tuesday,4 August,2020
Permit Issued on Thursday,February 6,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
t. Was ton and the City of Federal Way.
Owner or agent: 1 ( `C ) /1 /11 Date: (0T"" 7Z7'
t Wait I
THIS CARD IS TO REMAIN ON-SITE •
OF Construction Inspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 20 100343 00 Address: 1019 S 351ST ST
Project: NEUMEIER HOLDINGS LLC FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
® Initial Erosion Control(4365) ® Footings/Setback(4110) ® Re-steel(4215)
To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete or grout
,By Date •`By Date .LBy Date
•
a❑ Slab/Concrete Floor(4255) I ® Underfloor Framing(4285) 0 Floor Sheathing(4105)
Approved to place concrete Approved to sheath floor Approved to install flooring
By Date .' By Date •i By Date
® Fire/Draft Stops(4095) ! ® Interim Erosion Control(4370) Prior to scheduling a Framing inspection;
Approved Approved Electrical,Finishing&Mechanical Rough-in
and Fire/Draft Stop inspections must be signed-
By Date By Date off and approved IBC 109.3.4
•
® Framing(4120) In Insulation(4150) El Gypsum Wallboard Nailing(4130)
Approved to insulate Approved to install wallboard Approved to install mud&tape
By Date By Date By Date
. . ••
2 Suspended Ceiling Grid(4265) Final-S K F&R(4060) '•
CI Final-Planning
Approved to drop tile Approved Approved
PPro
By Date By Date By Date
rri
El Final Erosion Control(4375) ELI Final-Building(4050)
Approved Approved
�By Date �j�By Bl Date 31'41 20ro
O Rough Electrical 0 Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
DAILY FIELD REPORT cDate
/- AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101 Report Number
Redmond, WA 98052 JAH022720A
425-881-5812
CLIENT INFORMATION PROJECT INFORMATION
Contact Tom Gaston Project No. 20-058
Company Applied Handling NW, Inc Project Name Neumeier Engineering, Inc.
Address 8825 S 184th St Address 1019 S 351st Street
City Kent City Federal Way
Contractor Applied handling Permit No. 20-100343-00-CO
INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S)
0 Proprietary Anchors-Mechanical Racks 3 &4.
Weather Temperature(SF) Start Time End Time
Overcast 36 06:30 AM 08:30 AM
DRAWINGS/ DOCUMENTS REFERENCED
INSPECTION OBSERVATION / REMARKS
Torque inspection:
As requested I was on site for torque inspection for the on racks 3-4. Using a torque wrench I had torqued the KB-TZ Hilti 1/2" x 5-1/2"bolts to
40 foot-pounds. Torqued (48) bolts on rack 3, and (32) bolts on rack 4.
❑ Items inspected are in conformance with approved plans,specifications and jurisdictional requirements
Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date
Inspectors Signature James Huggins 02/27/2020 ;t,y-z Teajalam (TJ) Gounden 02/28/2020
2FBAECCC-6E73-4ACC-BB70-3EA287402A57
DAILY FIELD REPORT Inspection Date
(1927164'f
02/27/2020
AAR TESTING AND INSPECTION, INC.
Report Number
\ ve>
7126 180th Ave NE, Suite C101
Redmond, WA 98052 JAH022720A
425-881-5812
PHOTOS
„-r, / KB-TZ. KBTTZ SS KB- Z SS 3 6 *..
2,43091 A942 PC•9
"9 ESMARP94 Iry Wig `_ ,i 1.1)
Ati "5. j 0 ° �, F 1'c,.
...„
.. 1� . .. Z-4419�,,.
' a
l:nchl VI
fades,t 1+0.10 3411 4,h J k fin. a:
ri. Lntl 2 '2 37. 2 lia 2 3,4 ;
tm.n... lincnl 22.4 2nt 3.ro 2,0, 351, 2Ys Y+
,
4vn:hi” 1410",1� 240 tat 4 244, 4 _ =§4 4 � .
1:. Itt.49 40 d0 f
T..4...,, 0'4,1 25 21 * 2 4.'"',4'''',..
maa.t. Lnd l 9b. 1'S l 7e ,,
Vxno99,99brM 4PGod miry dtdis ta,In'dW9..,T ANSI 821:!11:N -. Y
A m�V11"inniM .rice.vrory vV+rw a'+n M'w!'''m .'""
.....•.. ATS" y 110....11.1f mM+x ... w.. .^+w„
gk
Anchors used on the installation of racks 3 &4. Torqued each bolt to 40 foot-pounds as per installation
instructions.
Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date
Inspectors Signature James Huggins 02/27/2020 -' / Teajalam (TJ) Gounden 02/28/2020
2FBAECCC-6E73-4ACC-BB70-3EA287402A57
DAILY FIELD REPORT Inspection Date
02/12/2020
l I AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101 Report Number
Redmond, WA 98052 LDCO21220A
425-881-5812
CLIENT INFORMATION PROJECT INFORMATION
Contact Tom Gaston Project No. 20-058
Company Applied Handling NW, Inc Project Name Neumeier Engineering, Inc.
Address 8825 S 184th St Address 1019 S 351st Street
City Kent City Federal Way
Contractor Applied handling Permit No. 20-100343-00-CO
INSPECTION TYPE(S) J STRUCTURE(S) / LOCATION(S)
0 Proprietary Anchors-Mechanical Row 2 Cantilever rack anchorage
Weather Temperature(°F) Start Time End Time
Cloudy 46 09:45 AM
DRAWINGS/ DOCUMENTS REFERENCED
GG, CR-1E, ESR# 1917
INSPECTION OBSERVATION / REMARKS
Verified anchors to be Hilti KB-TZ, 1/2"x 5-1/2". Verified minimum embedment depths of 3-1/2".Torque was tested with calibrated wrench and
was found meeting the 40 foot-pound requirement. (2) anchors installed at each end of baseplates for(4) total per baseplate. Remaining
racking to be inspected at future date.
B Items inspected are in conformance with approved plans,specifications and jurisdictional requirements
Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date
Inspectors Signature Loren Chandler 02/12/20202 Teajalam (TJ) Gounden 02/12/2020
359ED04D-160A-4ADB-8730-5CE340DAAFB9
1
• DAILY FIELD REPORT Inspection Date
02/12/2020
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101 Report Number
Redmond, WA 98052 LDCO21220A
425-881-5812
PHOTOS
i1 -, , . - :t:i'f.;', .::, ,,,
or. ' .1
pp
. � I
ulifik, - -:-,, ..
# 1, ,. I bi ii P 11711' ,ill' 11 i ..
F
' cf
v
"„7S zt
tt - ..
..
1
'ff 4
yyy. �
., IX w sem:
Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date
Inspectors Signature Loren Chandler 02/12/2020 i",.. Teajalam (Ti) Gounden 02/12/2020
n
359ED04D-160A-4ADB-B730-5CE340DAAFB9
C �
DAILY FIELD REPORT Inspection Date
02/05/2020
• AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101 Report Number
Redmond, WA 98052 LDCO20520C
425-881-5812
CLIENT INFORMATION PROJECT INFORMATION
Contact Tom Gaston Project No. 20-058
Company Applied Handling NW, Inc Project Name Neumeier Engineering, Inc.
Address 8825 S 184th St Address 1019 S 351st Street
City Kent City Federal Way
Contractor Applied Handling Permit No. 20-100343-00-CO
INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S)
Proprietary Anchors-Mechanical Pallet racking anchorage- Row 1 as noted on drawing NEU-FP
Weather Temperature(°F) Start Time End Time
Overcast 43 12:30 PM
DRAWINGS/ DOCUMENTS REFERENCED
NEU-FP, PR-1E, NEU-DET-1, ESR# 1917
INSPECTION OBSERVATION/ REMARKS
Verified anchors to be Hilti KB-TZ 1/2"x 5-1/2". Verified minimum embedments of 3-3/4". Torque was tested with calibrated wrench and was
found meeting the 40 foot-pound requirement. (4) anchors placed per baseplate on row 1 (5 bays). Additional rack anchorage to be inspected
at future date.
0 Items inspected are in conformance with approved plans,specifications and jurisdictional requirements
Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date
Inspectors Signature Loren Chandler 02/05/2020 Teajalam (TJ) Gounden 02/06/2020
9C391A3E-FCE8-4A5F-8C11-7549DDEEBEB6
( DAILY FIELD REPORT Inspection Date
02/05/2020
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101 RepNumber
Redm , LDCort020520C
425-881-ond5812WA 98052
PHOTOS
�rr"rj. r
f
1111010
•
�w'"x".'"'""` ® ii I. I, 4 �,. :2. r i
, i :",apv._,M
Mk
iiii ...: ' 1 1--t--
r h A
,, .--' ' :ti:.: :::...,%,):1 ,_ ..!,.-.
LI
Inspectors Name Report Date Reviewers Signature Reviewed By Reviewed Date
Inspectors Signature Loren Chandler 02/05/2020 j- Teajalam (TJ) Gounden 02/06/2020
9C391A3E FCE8 4A5F-8C11 7549DDEEBEB6
RECEIVED
PERMIT APPLICATION
CITY OF �..or JAN 2 7 2020
Federal Way PERMIT CENTER+33325 8th Avenue South+Federal Way,WA 98003-6325
CIN OF FEpE 253-835-2607 + FAX 253-835-2609 +permitcenter@cityoffederalway.com
COMMUNI1y pEYEL�MENT,
PERMIT NUMBERa O _ ' 0 0 3 y 3 _ 0- 0TARGET DATE 1 " 7 la,oao
SITE ADDRESS SUITE/UNIT#
k/21 °) ...Y ) s' SJR
PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL#
$ 1Z ( ZI0%-- Z., C7 z. 1 (74 - Z`7
TYPE OF PERMIT Jgr BUILDING 0 PLUMBING 0 MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION
NAME OF PROJECT 1 V f� 7
�'I0 C_ �2 y�f JV- .O__ £ CPRAL ,
PROJECT DESCRIPTION 1� P u_' �k''1,40)r � P ACA ,! i 2
Detailed description of work toUI
be included on this permit only
AANIE ,� ^ PRIMARY PHONE
PROPERTY OWNER �ILING �ESS IA(71.0\
w\ — t--/
0 E-MAIL2i �
ZZ� �
10 �/ ° T'(► ^� AIL
CITY
•ST vZI
_. ...7
t
NAME
PHONE
P PCL t-l ( 1= 10 ')v / o)1' ( - tO CA '•L�
' L74
E-MAIL
� AI
` 7JD ' ) , �)
CONTRACTOR cr_e.
S ATE ZI$y�r..,, ..� FAX
WA STATE
CY XkCONTRACTOR'SLICENSE O /�DATEFEDERAL WAY BUSINESS LICENSE#
,,TSAME PRIMARY PHONE
MAILING ADDRESS r•—•• E-
APPLICANT g 'z� 3C7. )g4N , --7.. � I om�L' NW
FA%Yla V !23
I
NAMEL ... PRIMARY PHONE
PROJECT CONTACT SArn l� 0,/e IJP Po (POT
(The individual to receive and MAILING ADDRESS E-MAIL
respond to all correspondence .
concerning this application) CITY STATE ZIP FAX
NAME •
PROJECT FINANCING ❑ OWNER-FINANCED
When value is$5,000 or more MAILING ADDRESS,CITY,STATE, PHONE
(RCW 19.27.095)
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit.I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in
the investigation and defense of such claim), which may be made by any person,including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as a part
of this application.
SIGNATURE: L7{N\ i �i DATE 1A..-�
/r7� (o'^r C� /
PRINT NAME: � ✓)c
Bulletin#100—January 29,2016 Page 1 of 2 k:\Handouts\Permit Application
VALUE OF MECHANICAL WORK
MECHANICAL PERMIT $
Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain.
AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe)
•,y AIR CONDITIONER FIREPLACE INSERTS ' HOODS(Commercial) •
BOILERS FURNACES HOT WATER TANKS(Gas)
COMPRESSORS GAS LOG SETS REFRIGERATION SYST
DUCTING GAS PIPING WOODSTOVES
VALUE OF PLUMBING WORK
PLUMBING PERMIT $
Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existingfixtures to remain.
BATHTUBS(or Tub/Shower Combo) LAVS(Hand Sinks) TOILETS WATER PIPING
DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe)
DRAINS SHOWERS VACUUM BREAKERS
DRINKING FOUNTAINS SINKS(Kitchen/Utiity) WATER HEATERS(Electro)
HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS
EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM?
XYes ❑ No ❑Yes ❑ No
RESIDENTIAL - NEW OR ADDITION
�JFOR OFFICE USE
AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL
BASEMENT"` �..� 4 „ ,'/F�° . ..i
+',r,4 ,, Yh4 • .. ,.:'. e„,bfj;�F;'�i.,+�.Y.'.:F`.- y��,r �
t,,,,;� ;...,.„, a.m 4zsT.a;�..
FIRST FLOOR(or Mobile Home)
0 .: sro»> a -,-,z',+a 5'` ,.u" 'r +,..r�',s?+ i ,G,«k-b' s" p a ,rr:t
COVERED ENTRY
7-4
', 'rY ';Fr f+
44,
GARAGE 0 CARPORT 0 S y
i8- r ' i � � 22/6,07,4
- 41'4'
9 ? r f fi
EXISTING PROPOSED' TOTAL
Area Totals
x H:�r ?� vtarrs t nib �
fit+
ESTIMATED SELLING PRICE$ # OF BEDROOMS
COMMERCIAL-NEW/ADDITION
AREA DESCRIPTION
Area Occupancy Group(s) Construction #of Additional Information
Square Feet Type in
Stones
! � E' , t 2 / r' � ,,,;":"W-17.3„.„4:
y" NEW BUILDING g �y s /"
; . ,40, ' ,.. furl t`4,-"
•:';
ADDITION
COMMERCIAL-REMODEL/TENANT IMPROVEMENTS
AREA DESCRIPTION
Area m Occupancy Group(s) Construction #of Additional Information
ScLuare FeetType Stories
s" ..,"4"
TENANT AREA ONLY
0.
;�„:.i✓r''' � //f3rf/i/i •`.!. i rls. • ✓ ,o
Bulletin#100—January 29,2016 Page 2 of 2 k:\Handouts\Perrnit Application