Loading...
Geotech ReportEarthSolutionsNWLLC EarthSolutions NW LLC 1805 -136th Place N.E.,Suite 201 Bellevue,WA 98005 (425)449-4704 Fax (425)449-4711 www.earthsolutionsnw.com Geotechnical Engineering Construction Observation/Testing Environmental Services GEOTECHNICAL ENGINEERING STUDY CELEBRATION PARK ASSEMBLAGE 33040-33090 -14 AVENUE SOUTH & 33002,33061 &33101 -15 AVENUE SOUTH FEDERAL WAY,WASHINGTON ES-1026.04 TH TH Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLC Geotechnical Engineering,Construction EarthSolutionsNWLLC EarthSolutions NW LLC Observation/Testing and Environmental Services Vicinity Map Celebration Park Assemblage Federal Way,Washington MRS AZS 05/22/2019 May 2019 1026.04 1 NORTH NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. Reference: King County,Washington Map 745 By The Thomas Guide Rand McNally 32nd Edition SITE Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLC Geotechnical Engineering,Construction EarthSolutionsNWLLC EarthSolutions NW LLC Observation/Testing and Environmental Services Boring Location Plan Celebration Park Assemblage Federal Way,Washington MRS AZS 05/22/2019 May 2019 1026.04 2 NORTH NOT -TO -SCALE NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. NOTE:The graphics shown on this plate are not intended for design purposes or precise scale measurements,but only to illustrate the approximate test locations relative to the approximate locations of existing and /or proposed site features.The information illustrated is largely based on data provided by the client at the time of our study.ESNW cannot be responsible for subsequent design changes or interpretation of the data by others. LEGEND Approximate Location of ESNW Boring,Proj.No. ES-1026.04,May 2019 Subject Site B-1 B-2 B-3 B-4 UST-1 B-1 370 380 390 400 370 380 390 400 S. 330TH STREET 15TH AVENUE S.S. 332ND STREET Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC Geotechnical Engineer ing,C onstr uction Observation/Testing and Environmental Services Retaining Wall Drainage Detail Celebration Park Assemblage Federal Way,Washington MRS AZS 05/22/2019 May 2019 1026.04 3 NOTES: Free-draining Backfill should consist of soil having less than 5 percent fines. Percent passing No.4 sieve should be 25 to 75 percent. Sheet Drain may be feasible in lieu of Free-draining Backfill,per ESNW recommendations. Drain Pipe should consist of perforated, rigid PVC Pipe surrounded with 1-inch Drain Rock. LEGEND: Free-draining Structural Backfill 1-inch Drain Rock 18"Min. Structural Fill Perforated Rigid Drain Pipe (Surround in Drain Rock) SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAWING Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLC Geotechnical Engineering,Construction Observation/Testing and Environmental Services EarthSolutionsNWLLC EarthSolutions NW LLC Footing Drain Detail Celebration Park Assemblage Federal Way,Washington MRS AZS 05/22/2019 May 2019 1026.04 4 Slope Perforated Rigid Drain Pipe (Surround in Drain Rock) 18"Min. NOTES: Do NOT tie roof downspouts to Footing Drain. Surface Seal to consist of 12"of less permeable,suitable soil.Slope away from building. LEGEND: Surface Seal:native soil or other low-permeability material. 1-inch Drain Rock SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING