Mitigation Plans-04-03-2020-V1DATE:
JOB NUMBER:
SITE PLAN
SHEET:1 OF 2
03/17/2020
19‐141NO. DATE NOTES
Know what's
R
UTILITY LOCATIONS AND CHARACTERISTICS SHOWN ON THIS DRAWING,
IF ANY, ARE BASED ON THE FIELD LOCATION OF THE APPARENT
SURFACE EVIDENCE OF EXISTING STRUCTURES. THE UNDERGROUND
ROUTING AND CONDITION OF BURIED UTILITIES HAS NOT BEEN
VERIFIED OR CONFIRMED. ADDITIONAL UTILITY LOCATION AND
MAPPING MAY BE REQUIRED. FIELD LOCATE, VERIFY DEPTH OF, AND
ADEQUATELY PROTECT ALL UTILITIES PRIOR TO THE START OF WORK.Sewall Wetland Consulting, Inc.PO Box 880 ‐ Fall City, Washington 98024 Phone: 253‐859‐0515CRITICAL AREA MITIGATION PLANNSCALE IN FEET
60300
112.5'
MINIMUM
BUFFER
150'
WETLAND
BUFFER
BUFFER REDUCTION
18,674 SF
BUFFER AVERAGING
AREA 19,188 SF
BUFFER REDUCTION
FOR 9' ROW DEDICATION
2,534 SF
WETLAND A S 304TH STREETPACIFIC HWY S
20TH AVE SS 302ND PLS 300TH ST20TH AVE S
FILE NO. 19‐105072‐00 SU THE WOODLANDS AT REDONDO CREEKCITY OF FEDERAL WAY WASHINGTONBUFFER ENHANCEMENT (2,589 SF)
REMOVE TRASH; CONTROL NOXIOUS
WEEDS; INSTALL NATIVE PLANTS.
10'
9'
BUFFER RESTORATION #1 (5,924 SF)
REMOVE TRASH; CONTROL NOXIOUS
WEEDS; INSTALL NATIVE PLANTS.
BUFFER RESTORATION #2 (2,788 SF)
REMOVE TRASH; CONTROL NOXIOUS
WEEDS; INSTALL NATIVE PLANTS.
REMOVE TRASH
AND DEBRIS FROM
STREAM
DRAWING REFERENCE:
THE SITE PLAN USED TO PREPARE THIS PLAN WAS PROVIDED BY ESM CONSULTING ENGINEERS, LLC. BASE
DRAWINGS HAVE BEEN MODIFIED FROM THEIR ORIGINAL FORMAT TO ENHANCE VISUAL PRESENTATION
AND/OR TO CLARIFY SPECIFIC INFORMATION.
MITIGATION TIMING:
THE MITIGATION SHOWN ON THIS PLAN SHALL BE COMPLETED CONCURRENTLY WITH PROJECT CONSTRUCTION
UNLESS OTHERWISE APPROVED BY THE CITY OF FEDERAL WAY.
DATE:
JOB NUMBER:
NOTES, DETAILS,
& MONITORING
PLAN
SHEET:2 OF 2
03/17/2020
19‐141NO. DATE NOTES
Know what's
R
UTILITY LOCATIONS AND CHARACTERISTICS SHOWN ON THIS DRAWING,
IF ANY, ARE BASED ON THE FIELD LOCATION OF THE APPARENT
SURFACE EVIDENCE OF EXISTING STRUCTURES. THE UNDERGROUND
ROUTING AND CONDITION OF BURIED UTILITIES HAS NOT BEEN
VERIFIED OR CONFIRMED. ADDITIONAL UTILITY LOCATION AND
MAPPING MAY BE REQUIRED. FIELD LOCATE, VERIFY DEPTH OF, AND
ADEQUATELY PROTECT ALL UTILITIES PRIOR TO THE START OF WORK.Sewall Wetland Consulting, Inc.PO Box 880 ‐ Fall City, Washington 98024 Phone: 253‐859‐0515CRITICAL AREA MITIGATION PLANFILE NO. 19‐105072‐00 SU THE WOODLANDS AT REDONDO CREEKCITY OF FEDERAL WAY WASHINGTONGENERAL CONSTRUCTION NOTES:
1. CONSTRUCTION SHALL CONFORM TO ALL CITY OF FEDERAL WAY CODES, ORDINANCES, AND
REGULATIONS.
2. BEFORE THE START OF ANY CONSTRUCTION, A PRE‐CONSTRUCTION MEETING MUST BE HELD BETWEEN
CITY OF FEDERAL WAY, THE OWNER, AND THE PLAN DESIGNER.
3. A COPY OF THESE APPROVED DRAWINGS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN
PROGRESS.
4. SITE CONDITIONS MAY VARY BASED ON SEASON AND/OR TIME OF YEAR. THE CONSTRUCTION
CONTRACTOR SHALL ACCOMMODATE REALIZED AND ANTICIPATED SITE CONDITIONS WHEN COMPLETING
THE WORK SHOWN ON THESE DRAWINGS.
5. THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS,
SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT
THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE
PERFORMANCE OF THE WORK SHOWN ON THESE DRAWINGS. ANY WORK WITHIN THE TRAVELED
RIGHT‐OF‐WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE TRAFFIC CONTROL IN
ACCORDANCE WITH ANY AND ALL CITY OF FEDERAL WAY STANDARDS.
6. THE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHOWN ON THESE DRAWINGS, IF
ANY, ARE THE MINIMUM REQUIRED. ADJUST, AMEND, AND/OR ADD TO THE TESC MEASURES SHOWN TO
ACCOMMODATE SITE AND WEATHER CONDITIONS AND/OR AS OTHERWISE DIRECTED BY OWNER OR PER
CITY OF FEDERAL WAY.
RECOMMENDED CONSTRUCTION SEQUENCE:
1. FLAG WORK AREA LIMITS.
2. REQUEST AND ATTEND A PRE‐CONSTRUCTION MEETING WITH OWNER.
3. REMOVE TRASH AND DEBRIS FROM EACH WORK AREA.
4. INSTALL NATIVE PLANTS.
5. INSTALL MULCH.
6. INSTALL TEMPORARY IRRIGATION SYSTEM.
7. CLEAN‐UP AND DEMOBILIZE FROM SITE.
8. REQUEST FROM AND ATTEND INSPECTION WITH OWNER.
9. CONTRACTOR TO PROVIDE 1 YEAR OF MAINTENANCE UNDER DIRECTION OF OWNER.
10. OWNER TO COMPLETE 5 YEARS OF MONITORING.
NOXIOUS WEED CONTROL:
PRIOR TO PLANT INSTALLATION, CONTROL NOXIOUS WEEDS WITHIN EACH PLANTING AREA. TARGET NOXIOUS
WEED SPECIES SHALL INCLUDE THE FOLLOWING: ALL CLASS "A", "B", AND "C" NOXIOUS WEEDS (INCLUDING
NON‐REGULATED "B" AND "C" NOXIOUS WEEDS AND "WEEDS OF CONCERN") IDENTIFIED ON THE LATEST
KING COUNTY NOXIOUS WEED LIST. DURING NOXIOUS WEED CONTROL WORK, EXISTING NATIVE VEGETATION
SHALL BE PROTECTED FROM DAMAGE. ALL NOXIOUS WEED CONTROL CUTTINGS AND DEBRIS SHALL BE
REMOVED FROM THE SITE. ACCEPTABLE CONTROL METHODS INCLUDE THE FOLLOWING:
1. REDUCE TOP GROWTH OF NOXIOUS WEEDS. ACCEPTABLE METHODS INCLUDE: WALK BEHIND OR
TRACTOR MOUNTED MOWER, EXCAVATOR WITH BUCKET AND THUMB, POWER SAW, BRUSH HOG, LINE
TRIMMER, LOPPERS, CLIPPERS, HAND PULLING, OR APPROVED EQUAL.
2. GRUB OUT LARGE ROOT CROWNS AND MAJOR ROOTS BY HAND USING CLAW MATTOCK, PULASKI, OR
APPROVED EQUAL.
PLANT INSTALLATION NOTES:
1. PLANT MATERIAL QUALITY AND LOCATIONS SHALL BE INSPECTED BY PLAN DESIGNER OR OWNER PRIOR
TO INSTALLATION.
2. PLANT LOCATIONS SHOWN ARE APPROXIMATE. ADJUST PLANT LOCATIONS TO ACCOMMODATE SITE
CONDITIONS, TO PRESERVE AND PROTECT EXISTING NATIVE VEGETATION, AND/OR PER PLAN DESIGNER
AT TIME OF INSTALLATION.
3. FOLLOWING PLANT INSTALLATION, PLACE MULCH AT THE BASE OF EACH PLANT PER DETAILS.
PLANT MATERIAL SPECIFICATIONS:
1. PLANTS SHALL BE DERIVED FROM STOCK ACCLIMATED TO WESTERN WASHINGTON ENVIRONMENTAL
CONDITIONS,
2. PLANTS SHALL BE NATIVE TO THE PACIFIC NORTHWEST, PREFERABLY THE PUGET SOUND REGION OF
WASHINGTON STATE. PLANTS SHALL BE PROPAGATED FROM NATIVE STOCK. SALVAGED PLANTS ARE
ACCEPTABLE.
3. SEE FOLLOWING WEBSITE FOR NATIVE PLANT SUPPLIERS:
HTTP://WWW.KINGCOUNTY.GOV/SERVICES/ENVIRONMENT/STEWARDSHIP/NW‐YARD‐AND‐GARDEN/
NATIVE‐PLANT‐NURSERIES‐WASHINGTON.ASPX
4. PLANTS SHALL BE NORMAL IN PATTERN OF GROWTH, HEALTHY, WELL‐BRANCHED AND HAVE ALL LEADERS
AND BUDS INTACT. TREES SHALL NOT HAVE SUNSCALDS, DISFIGURING KNOTS, FRESH CUTS OF LIMBS,
DAMAGED LEADERS, AND/OR DEFORMED TRUNKS.
5. CONTAINERIZED PLANT STOCK SHALL BE GROWN IN A CONTAINER LONG ENOUGH TO DEVELOP A ROOT
SYSTEM THAT REACHES THE EDGES OF THE CONTAINER IN WHICH IT HAS GROWN. TREES AND SHRUBS
SHALL BE WELL ROOTED AND SHALL HAVE SUFFICIENT ROOT MASS TO HOLD TOGETHER THE SOIL, IN
WHICH PLANT IS GROWING, WHEN REMOVED FROM THE POT.
MULCH SPECIFICATION:
MULCH SHALL BE COMMERCIALLY AVAILABLE "MEDIUM MULCH" (WWW.PACIFICTOPSOILS.COM;
425‐337‐2700), ARBORIST CHIPS, OR APPROVED EQUAL. MULCH SHALL NOT CONTAIN RESIN, TANNIN, OR
OTHER COMPOUNDS IN QUANTITIES THAT WOULD BE DETRIMENTAL TO PLANT LIFE. MULCH SHALL NOT BE
DERIVED FROM STUMP GRINDINGS AND SHALL NOT CONTAIN SOIL. HOG FUEL OR EQUAL IS NOT ACCEPTABLE.
SUBJECT TO REVIEW BY THE PLAN DESIGNER, LOCAL ARBORIST AND/OR COMMERCIAL TREE TRIMMING
COMPANIES MAY BE ALTERNATIVE ACCEPTABLE MATERIAL SOURCES (WWW.DROPCHIP.IN).
TEMPORARY IRRIGATION:
TEMPORARY IRRIGATION SHALL BE PROVIDED FOR TWO (2) GROWING SEASONS FOLLOWING PLANT
INSTALLATION. IRRIGATION SHALL PROVIDE A MINIMUM RAINFALL EQUIVALENT OF 1 INCH PER WEEK FROM
JUNE 15 THROUGH SEPTEMBER 15. IRRIGATION SHALL BE APPLIED IN A MANNER THAT MAINTAINS PLANT
HEALTH, PREVENTS WILTING, AND PROMOTES DEEP PLANT ROOT SYSTEMS.
PLANT SCHEDULE:
QUANTITY
BUFFER BUFFER BUFFER
ENHANCEMENT RESTORATION #1 RESTORATION #2
COMMON NAME SCIENTIFIC NAME SIZE/FORM SPACING (2,589 SF) (5,978 SF) (2,788 SF)
BIGLEAF MAPLE ACER MACROPHYLLYM 2 GALLON 9' OC 5 15 5
DOUGLAS‐FIR PSEUDOTSUGA MENZIESII 2 GALLON 9' OC 10 25 15
WESTERN REDCEDAR THUJA PLICATA 2 GALLON 9' OC 17 32 14
VINE MAPLE ACER CIRCINATUM 2 GALLON 6' OC 5 28 9
INDIAN PLUM OEMLERIA CERASFORMIS 2 GALLON 6' OC 20 40 20
SALMONBERRY RUBUS SPECTABILIS 2 GALLON 6' OC 20 50 20
SNOWBERRY SYMPHORICARPOS ALBUS 2 GALLON 6' OC 28 50 30
TOTAL: 105 240 113
MONITORING PLAN:
PLAN GOALS, OBJECTIVES, AND PERFORMANCE STANDARDS:
PLAN GOALS, OBJECTIVES, AND PERFORMANCE STANDARDS ARE OUTLINED IN TABLE 1 (THIS SHEET). THE
GOALS AND OBJECTIVES OF THIS PLAN ARE CONSIDERED ACHIEVED WHEN THE PERFORMANCE STANDARDS
ARE SATISFIED.
MONITORING PLAN (DURATION: 5 YEARS):
AS‐BUILT
SCHEDULE: IMMEDIATELY FOLLOWING CONSTRUCTION
FOLLOWING COMPLETION OF THE WORK SHOWN ON THIS PLAN, A QUALIFIED PROFESSIONAL SHALL
PREPARE AN AS‐BUILT OF THE WORK COVERED BY THIS PLAN. THE AS‐BUILT SHALL SUMMARIZE THE
COMPLETED WORK AS WELL AS ANY DEVIATIONS FROM THE APPROVED VERSION OF THIS PLAN.
IN ADDITION TO THE AS‐BUILT, BASELINE MONITORING DATA SHALL BE COLLECTED AND PERMANENT
PHOTO POINTS SHALL BE ESTABLISHED TO PHOTOGRAPHICALLY DOCUMENT REPRESENTATIVE CONDITIONS
WITHIN THE WORK AREAS SHOWN ON THIS PLAN. BASELINE MONITORING DATA COLLECTED AND REPORTED
AS PART OF THE AS‐BUILT SHALL BE CONSISTENT WITH THAT DESCRIBED FOR ANNUAL MONITORING.
THE AS‐BUILT AND BASELINE MONITORING DATA SHALL BE SUBMITTED TO THE CITY OF FEDERAL WAY NO
LATER THAN 30 DAYS FROM THE DATE THAT THE WORK SHOWN ON THIS PLAN HAS BEEN COMPLETED.
ANNUAL MONITORING
FOLLOWING ACCEPTANCE OF THE AS‐BUILT, ANNUAL MONITORING SHALL BE COMPLETED FOR A PERIOD OF
FIVE (5) YEARS. MONITORING SHALL BE COMPLETED BY A QUALIFIED PROFESSIONAL AND SHALL COMPRISE
A DETAILED SITE ASSESSMENT PER THE ABOVE SCHEDULE WITH REPORTING TO THE CITY OF FEDERAL WAY
NO LATER THAN 30 DAYS FOLLOWING EACH MONITORING ASSESSMENT.
THE PURPOSE OF ANNUAL MONITORING IS TO EVALUATE CONDITIONS WITHIN THE WORK AREAS SHOWN
ON THIS PLAN PER THE CURRENT YEAR'S PERFORMANCE STANDARDS. THE FOLLOWING INFORMATION
SHALL BE COLLECTED AND ASSESSED RELATIVE TO THE PERFORMANCE STANDARDS ESTABLISHED FOR THE
PROJECT:
THE PERCENT SURVIVAL OF INSTALLED PLANT STOCK (YEAR 1 THROUGH YEAR 2 ONLY). A DIRECT COUNT
INVENTORY AND ASSESSMENT OF ALL INSTALLED PLANTS SHALL BE USED TO EVALUATE PERCENT
SURVIVAL. THE RATIONALE FOR POOR CONDITIONS, IF PRESENT, WILL BE DETERMINED TO THE EXTENT
FEASIBLE.
THE PERCENT COVERAGE PROVIDED BY INSTALLED PLANT SPECIES (ALL YEARS). INSTALLED PLANT STOCK
PERCENT COVERAGE SHALL BE ASSESSED USING APPROPRIATELY SIZED SAMPLE PLOTS OR LINE INTERCEPT
TRANSECTS.
THE PERCENT COVERAGE PROVIDED BY NOXIOUS WEEDS (ALL YEARS). INSTALLED PLANT STOCK PERCENT
COVERAGE SHALL BE ASSESSED USING APPROPRIATELY SIZED SAMPLE PLOTS OR LINE INTERCEPT
TRANSECTS.
PHOTOGRAPHS OF THE WORK AREAS SHOWN ON THIS PLAN SHALL BE TAKEN FROM THE PERMANENT
PHOTO POINTS ESTABLISHED DURING THE AS‐BUILT.
CONTINGENCY PLAN:
SHOULD ANY MONITORING ASSESSMENT REVEAL THAT THE PERFORMANCE STANDARDS FOR THE
RESPECTIVE YEAR ARE NOT SATISFIED, THE PERMITTEE SHALL WORK WITH THE CITY OF FEDERAL WAY TO
DEVELOP A CONTINGENCY PLAN TO ADDRESS THE DEFICIENCY(IES). CONTINGENCY PLANS CAN INCLUDE,
BUT ARE NOT LIMITED TO, THE FOLLOWING ACTIONS:
1. ADDITIONAL PLANT INSTALLATION;
2. EROSION CONTROL;
3. HERBIVORY PROTECTION;
4. MODIFICATION TO THE IRRIGATION REGIME; AND/OR
5. PLANT SUBSTITUTIONS OF TYPE, SIZE, QUANTITY, AND LOCATION.
SUCH CONTINGENCY PLAN SHALL BE SUBMITTED TO THE CITY OF FEDERAL WAY BY JANUARY 31 OF ANY
YEAR WHEN DEFICIENCIES ARE DISCOVERED. UNLESS OTHERWISE APPROVED BY THE CITY OF FEDERAL WAY,
ACTIONS SPECIFIED ON AN APPROVED CONTINGENCY PLAN MUST BE COMPLETED WITHIN 60 DAYS. IF THE
FAILURE IS SUBSTANTIAL, THE CITY OF FEDERAL WAY MAY EXTEND THE COMPLIANCE MONITORING PERIOD
FOR THE ENHANCEMENT WORK.
MAINTENANCE PLAN:
THIS SECTION PROVIDES A GENERAL OVERVIEW OF THE MAINTENANCE PROGRAM NECESSARY TO ENSURE
THE PERFORMANCE STANDARDS ESTABLISHED FOR THIS PLAN ARE SATISFIED.
GENERAL MAINTENANCE
INSTALLED PLANTS SHALL BE MAINTAINED AT REGULAR INTERVALS DURING THE MONITORING PERIOD TO
PROMOTE SUCCESSFUL ESTABLISHMENT AND VIGOROUS GROWTH.
GENERAL MAINTENANCE SHALL INCLUDE:
WEEDING THE BASE OF EACH INSTALLED PLANT.
RE‐APPLYING BARK MULCH TO MAINTAIN A 6" MINIMUM APPLIED THICKNESS ‐ YEAR 1 ONLY.
THE PRUNING OF INSTALLED PLANTS TO REMOVE DEAD WOOD AND PROMOTE VIGOROUS PLANT
GROWTH AND PROPER FORM.
THE REPLACEMENT OF PLANTS IN DISTRESS AND/OR THAT ARE DISEASED.
THE REMOVAL OF TRASH, LITTER, AND/OR OTHER NON‐DECOMPOSING DEBRIS.
TEMPORARY IRRIGATION.
NOXIOUS WEED CONTROL
FOLLOWING PLANT INSTALLATION AND AT REGULAR INTERVALS DURING THE MONITORING PERIOD,
NOXIOUS WEED CONTROL SHALL OCCUR ON A SPOT TREATMENT BASIS WITHIN EACH WORK AREA. TARGET
NOXIOUS WEED SPECIES SHALL INCLUDE THE FOLLOWING: ALL CLASS "A", "B", AND "C" NOXIOUS WEEDS
(INCLUDING NON‐REGULATED "B" AND "C" NOXIOUS WEEDS) IDENTIFIED ON THE LATEST SNOHOMISH
COUNTY NOXIOUS WEED LIST. DURING NOXIOUS WEED CONTROL WORK, EXISTING NATIVE VEGETATION
SHALL BE PROTECTED FROM DAMAGE. ALL NOXIOUS WEED CONTROL CUTTINGS AND DEBRIS SHALL BE
REMOVED FROM THE SITE.
ENVIRONMENTAL GOALS & OBJECTIVES:
TO SUCCESSFULLY ESTABLISH A DENSE NATIVE PLANT
COMMUNITY COMPRISING TREES AND SHRUBS WITHIN
THE AREAS SHOWN ON THIS PLAN.
TO LIMIT NOXIOUS WEED SPECIES WITHIN THE AREAS
SHOWN ON THIS PLAN.
MONITORING SCHEDULE:
LATE SUMMER
YEARS 1, 2, 3, 4, & 5
FOLLOWING PLANT
INSTALLATION
LATE SUMMER
YEARS 1, 2, 3, 4, & 5
FOLLOWING PLANT
INSTALLATION
PERFORMANCE STANDARDS:
1.PLANT SURVIVAL:
100% SURVIVAL BY INSTALLED PLANT STOCK AFTER THE FIRST GROWING SEASON. THIS STANDARD CAN
BE ACHIEVED STRICTLY THROUGH SURVIVAL OR THROUGH A COMBINATION OF SURVIVAL AND PLANT
REPLACEMENT.
80% SURVIVAL BY INSTALLED PLANT STOCK AFTER THE SECOND GROWING SEASON.
2.NATIVE PLANT COVERAGE:
YEAR 3: 30%
YEAR 5: 60%
UP TO 20% OF THE NATIVE WOODY PLANT SPECIES COVERAGE DURING ANY YEAR MAY BE COMPRISED OF
DESIRABLE NATIVE COLONIZING SPECIES.
3. NATIVE PLANT DIVERSITY:
AFTER THE FIFTH GROWING SEASON, A MINIMUM OF FIVE DIFFERENT PLANT SPECIES WILL BE
ESTABLISHED WITHIN BUFFER AREAS.
LESS THAN 10% COVERAGE BY ALL CLASS "A", "B", AND "C" NOXIOUS WEEDS (INCLUDING NON‐REGULATED
"B" AND "C" NOXIOUS WEEDS) IDENTIFIED ON THE LATEST SNOHOMISH COUNTY NOXIOUS WEED LIST.
TABLE 1: MITIGATION PLAN GOALS, MONITORING SCHEDULE, PERFORMANCE STANDARDS
PLACE TOP OF ROOTBALL
1 INCH ABOVE THE LEVEL
OF NATIVE SOIL. BEFORE
MULCH, POTTING SOIL
SHOULD BE VISIBLE.
CUT CIRCLING ROOTS
AND SPREAD OR
"BUTTERFLY" ROOTBALL.
PLACE 1 FOOT RADIUS MULCH
CIRCLE AT BASE OF INSTALLED
PLANT. MULCH DEPTH =
MINIMUM 6 INCHES.
NATIVE SOIL
BACKFILL WITH NATIVE
SOIL. COMPACT BY HAND.
MIN. 1.5 TIMES THE
WIDTH OF THE ROOTBALL
NATIVE SOIL
CUT CIRCLING ROOTS
AND SPREAD OR
"BUTTERFLY" ROOTBALL.
MIN. 1.5 TIMES THE
WIDTH OF THE ROOTBALL
BACKFILL WITH NATIVE
SOIL. COMPACT BY HAND.
PLACE TOP OF ROOTBALL
1 INCH ABOVE THE LEVEL
OF NATIVE SOIL. BEFORE
MULCH, POTTING SOIL
SHOULD BE VISIBLE.
PLACE 1 FOOT RADIUS MULCH
CIRCLE AT BASE OF INSTALLED
PLANT. MULCH DEPTH =
MINIMUM 6 INCHES.
PLANT INSTALLATION DETAILS1