Loading...
12-12-17 Notice of Incomplete ApplicationCITY OF Federal Way December 12, 2017 Mr. Eric LaBrie ESM Consulting Engineers 33400 8`" Avenue South, Suite 205 Federal Way, WA 98003 eric.labrie@esmcivil.com F 1; xy. bT HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com Jim Ferrell, Mayor Re: File Nos. 17 -105489 -00 -UP & 17 -105490 -00 -SE; NOTICE OF INCOMPLETE APPLICATION Greenline Business Park, 32901 Weyerhaeuser Way South, Federal Way Dear Mr. LaBrie: The Department of Community Development has conducted a cursory review of information you submitted to the city on November 14, 2017, in order to determine if the application is complete for the proposed Greenline Business Park Use Process IV and State Environmental Policy Act (SEPA) reviews. INCOMPLETE APPLICATION During the course of the city's review, the following items were found to be missing or incomplete. In order for your application to be considered complete and ready for processing, the items below must be provided. • Transportation Impact Analysis (TIA) • Noise Analysis • Air Quality Analysis • Visual Impact Analysis • Washington State Department of Archeology and Historic Preservation Analysis as follows: Provide an inventory of the project site and surrounding Weyerhaeuser campus to evaluate the property for its historical and architectural significance. The inventory shall be conducted by qualified cultural resource professionals with expertise in architectural history and archaeology and that have knowledge of using DAHP's on-line Historic Property Inventory and Archaeological Site Inventory databases. i. Be aware that DAHP requires that all documents related to project reviews be submitted electronically. Correspondence, reports, notices, photos, etc. must now be submitted in PDF or JPG format. For more information about how to submit documents to DAHP please visit: http://www.dahp.wa.gov/prograiiis/slipo-coi-nl2lianc , ii. To assist in conducting a cultural resource survey and inventory effort, DAIIP has developed guidelines, including requirements for survey reports, which is available on their website. Mr. LaBrie December 12, 2017 Page 2 PRELIMINARY TECHNICAL COMMENTS During the City's review of the proposal for completeness, City staff noted a potential major issue regarding stormwater drainage requirements as follows: • Based on the information provided in the Technical Information Report (TIR), it appears this project may meet the requirement for Large Project Drainage Review as outlined in the 2016 King County Surface Water Design Manual (KCSVWDM Section 1.1.1, p. 1-12, AND meets the following criteria): The project would, at full buildout, result in 50 acres or more of new impervious surface within a single subbasin or multiple subbasins that are hydraulically connected across subbasin boundaries. If so, then a Master Drainage Plan will need to be prepared per the requirements of Appendix B of the KCSWDM. It is the applicant's responsibility to demonstrate that the project does not meet the requirements of a Large Project Drainage Review. Since the application is incomplete, a technical review of the proposal has not been conducted. A complete technical review of the Process IV and SEPA applications will occur after all the missing items are submitted. Technical review of the project will likely result in a request for amended or additional technical information necessary to review the proposal. Any resubmittals for this application must be accompanied with a resubmittal form (enclosed). After receipt of the requested information noted in the incomplete application section of this letter, the department will notify you within 14 days whether your application is considered complete for processing, or what, if any, information is still needed. The review clock for processing your formal application will not begin until all items are submitted. Please contact me at jim.harris@cityoffederalway.com, or 253 835-2652, if you have any questions. Sincerely, in Harris Planner enc: Resubmittal Form c: Tom Messmer, tmessmer@industrialrealtygroup.com Brian Davis, Director of Community Development Kevin Peterson, Engineering Plans Reviewer Sarady Long, Senior Transportation Engineer Brian Asbury, Lakehaven Utility District, via email 17 -105489 -00 -UP Do, LD, 76976