Loading...
Lakehave Water & Sewer Avail.4 41 t Lakehaven WATER & SEWER DISTRICT Lakehaven Water &Sewer District —Development Engineering Section 31623 — 1st Ave S * PO Box 4249 Federal Way, WA 98063-4249 Email: DE@Lakehaven.org * Telephone: 253-945-1581 or 253-9454580 This certificate is intended to provide the applicant, land use agencies &/or public health departments with information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole discretion, reserves the right to delay, or deny, water service based upon capacity &/or supply limitations in Lakehaven's or Other Purveyor's system facilities. Proposed Land Use: ❑Building Permit -SFR () ❑Building Permit -MFR () ®Building Permit -Other ❑ Subdivision () ❑ Short Subdivision () ❑ Binding Site Plan ❑ Boundary Line Adjustment ❑ Other (specify/describe) Tax Parcel Number(s): 6142600005, 6142600200 Site Address: 337XX Weyerhaeuser Way S LWSD GIS Grid: L-11 Ex. Bldg. Area to Remain: N/A sf WATER SYSTEM INFORMATION New Bldg. Area Proposed: 226,092 sf 1. ❑ Water service can be provided by service connection to an existing "diameter water main that is approximately feet from the site. 2. ® Water service for the site will require an improvement to LWSD's water distribution system of: ❑ a. feet of " diameter water main to reach the site; and/or ® b. The construction of a 12" diameter water distribution system on the site; and/or ❑ c. A major portion of LWSD's comprehensive water system plan would need to be implemented and/or constructed; and/or ® d. Other (describe): LWSD Developer Extension (DE) Agreement required. 3. ® a. The existing water system is in conformance with LWSD's Comprehensive Water System Plan. ❑ b. The existing water system is not in conformance with LWSD's Comprehensive Water System Plan and an Amendment to this Plan will be required. This may cause a delay in issuance of land use approvals or permits. 4. ® a. The subject property is within the corporate limits of Lakehaven Water & Sewer District, or has been granted Boundary Review Board approval for extension of water service outside of LWSD's water service area. ❑ b. Annexation or Boundary Review Board approval will be necessary to provide service. S. Water service is subject to: ® a. Payment of connection charges (to be determined by LWSD); ® b. Proof or reservation of easement(s) as required by LWSD; ® c. Other: LWSD Water Service Connection applications required. LWSD DE Agreement (#2 above) project must be accepted by LWSD, prior to domestic or irrigation service connection activations. Comments/special conditions: Care shall be taken to avoid encroachment upon existing LWSD water and/or sewer mains, and/or associated easementls), on the site. The nearest fire hydrants will be on the Property number &locations TBD by fire marshal). System hydraulic model results (FF #324, copy attached), at no less than 20 psi, indicate that LWSD's standard maximum allowable liquid velocity of 10 ft/s is exceeded at a fire flow rate above 4,100 GPM for two (2) hours or more. This flow figure depicts the theoretical performance of the water distribution system under high demand conditions. Fire flow rates greater than this may be accommodated through water distribution system improvements, contact LWSD for additional information. 538 Pressure Zone Est. Meter Elevations) -GIS: 400+/- Est. Pressure Range at Meter(s) (psi): 51-59 I hereby certify that the above water system information is true. This certification shall be valid for one (1) year from the date of signature. Name: BRIAN ASBURY ure: Title: DEVELOPMENT ENGINEERING SUPERVISOR Signat 614260005 6142600200 wtr.docx (Form Update 4/2/19) Page 1 of 2 614260005 6142600200 wtr.docx (Form Update 4/2/19) Page 2 of 2 LAKEHAVEIN UTILITY I)ISTKIUT Hydraulic Model Fire Flow )Jstimate Request/Reporting Form NOTES: Lakehaven's adopted level of service goals for fire flow rates are 1000 gpm within single family residential areas (including duplexes) and 2500 gpm for multifamily, commercial, and industrial areas. Model results depict the theoretical performance of the water system under high demand conditions and are not guaranteed to represent actual system performance. A design professional should be consulted for site specific design purposes. The calculated fire flow capacity in the above table is based on a curr ently available residual system pr•essur•e of 20 psi at the location modeled and with a proposed new 12" diameter pipe loop. An 8" diameter pipe loop exceeded Lakehaven's standard maximum allowable velocity of 8 $/s for new pipe at a fire flow rate above 2100 gpm. 0�1916pp32a- Preferred Freezer�ornnRev.tz/6ns) Results By; John Bowman.., Requested By: BrianAsbury Date: 07/1/16 Location to be Modeled: Proposed "Preferred Freezer" Site (APN 6142600005/6142600200) Lakehaven'/, Section Grid: L/11 Flow (gpm) intersection: West of S 339d' St & Weyerhaeuser Way S 0 Add. Description: See attached map; Hyd #3 pressure Zone: 538 NOTES: Lakehaven's adopted level of service goals for fire flow rates are 1000 gpm within single family residential areas (including duplexes) and 2500 gpm for multifamily, commercial, and industrial areas. Model results depict the theoretical performance of the water system under high demand conditions and are not guaranteed to represent actual system performance. A design professional should be consulted for site specific design purposes. The calculated fire flow capacity in the above table is based on a curr ently available residual system pr•essur•e of 20 psi at the location modeled and with a proposed new 12" diameter pipe loop. An 8" diameter pipe loop exceeded Lakehaven's standard maximum allowable velocity of 8 $/s for new pipe at a fire flow rate above 2100 gpm. 0�1916pp32a- Preferred Freezer�ornnRev.tz/6ns) Results By; John Bowman.., Date: 7/19/16 Model Run No.: Master Water System Model 2007.net FF #324 Condition Pressure (psi) Flow (gpm) Static 40 0 Fire Flow 20 4100 NOTES: Lakehaven's adopted level of service goals for fire flow rates are 1000 gpm within single family residential areas (including duplexes) and 2500 gpm for multifamily, commercial, and industrial areas. Model results depict the theoretical performance of the water system under high demand conditions and are not guaranteed to represent actual system performance. A design professional should be consulted for site specific design purposes. The calculated fire flow capacity in the above table is based on a curr ently available residual system pr•essur•e of 20 psi at the location modeled and with a proposed new 12" diameter pipe loop. An 8" diameter pipe loop exceeded Lakehaven's standard maximum allowable velocity of 8 $/s for new pipe at a fire flow rate above 2100 gpm. 0�1916pp32a- Preferred Freezer�ornnRev.tz/6ns) (NOTE; Lalcohaven Ullllly District noithor warrants nor tluaranloss the accuracy of any facility Information proY UM Facility locations and conditions aro subject to field PREFERRED FREEZER / ORCA BAY 16.102265 -00 -UP 0 300 600 Feet 5/13/2016 BTA Lakehaven WATER & SEWER DISTRICT Lakehaven Water &Sewer District —Development Engineering Section 31623 — 1st Ave S * PO Box 4249 Federal Way, WA 98063-4249 Telephone: 253-945-1581 or 253-945-1580 * Email: DE@Lakehaven.org This certificate is intended to provide the applicant, land use agencies &/or public health departments with information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole discretion, reserves the right to delay, or deny, sewer service based upon capacity &/or supply limitations in Lakehaven's or Other Purveyor's system facilities. Proposed Land Use: ❑Building Permit -SFR () ❑Building Permit -MFR () ®Building Permit -Other ❑ Subdivision () ❑ Short Subdivision () ❑ Binding Site Plan ❑ Boundary Line Adjustment ❑ Other (specify/describe) Tax Parcel Number(s): 6142600005, 6142600200 Site Address: 337XX Weyerhaeuser Way S LWSD GIS Grid: L-11 Ex. Bldg. Area to Remain: N/A sf New Bldg. Area Proposed: 226,092 sf SEWER SYSTEM INFORMATION 1. ❑ Sewer service can be provided by service connection to an existing " diameter sewer main that is approximately feet from the site and the sewer system has the capacity to serve the proposed land use. 2. ® Sewer service for the site will require an improvement to LWSD's sanitary sewer system of: ❑ a. feet of " diameter sewer main or trunk to reach the site; and/or ® b. The construction of a sanitary sewer collection system on the site; and/or ❑ c. A major portion of LWSD's comprehensive wastewater system plan would need to be implemented and/or constructed; and/or ® d. Other (describe): LWSD Developer Extension (DE) Agreement required. 3. ® a. The existing sewer system is in conformance with LWSD's Comprehensive Wastewater System Plan. ❑ b. The existing sewer system is not in conformance with LWSD's Comprehensive Wastewater System Plan and an Amendment to this Plan will be required. This may cause a delay in issuance of land use approvals or permits. 4. ® a. The proposed site land use is within the corporate limits of Lakehaven Water & Sewer District, or has been granted Boundary Review Board approval for extension of sewer service outside of LWSD's sewer service area. ❑ b. Annexation or Boundary Review Board approval will be necessary to provide service. S. Sewer service is subject to: ® a. Payment of connection charges (to be determined by LWSD); ® b. Proof or reservation of easement(s) as required by LWSD; ® c. Other: LWSD Sewer Service Connection Permits) required. LWSD DE Agreement (#2 above) project must be accepted by LWSD, prior to service connection activation(s). Comments/special conditions: Care shall be taken to avoid encroachment upon existing LWSD water and/or sewer mains, and/or associated easement(s), on the site. I hereby certify that the above sewer system information is true. This certification shall be valid for one (1) year from the date of signature. Name: BRIAN ASBURY Title: DEVELOPMENT ENGINEERING SUPERVISOR Signature: 614260005 6142600200 swr.docx (Form Update 4/2/19) Page 1 of 2 614260005 6142600200 swr.docx (Form Update 4/2/19) Page 2 of 2