SEPA Checklist4k
Department of Community Development Services
33325 8th Avenue South
Federal Way, WA 98003-6325
CITY OF 10';:tS253-835-2607; Fax 253-835-2609
FederalWay w•wwcityoffederalway.com
SEPA ENVIRONMENTAL CHECKLIST
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization, or
compensatory mitigation measures will address the probable significant impacts, or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicantr hel W
This environmental checklist asks you to describe some basic information about your proposal. Please answer
each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency
specialist or private consultant for some questions. You may use "not applicable" or "does not apply" only
when you can explain why it does not apply and not when the answer is unknown. You may also attach or
incorporate by reference additional studies and/or reports. Complete and accurate answers to these questions
often avoid delays with the SEPA process, as well as later in the decision -making process.
The checklist questions apply to all parts ofyourproposal, even if you plan to do them over a period of time or
on different parcels of land. Attach any additional information that will help describe your proposal or its
environmental effects. The agency to which you submit this checklist may ask you to explain your answers or
provide additional information reasonably related to determining if there may be significant adverse impact.
Instructions for LeadAgenaes:
Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the
proposal, and an analysis of adverse impacts. The checklist is considered the first, but not necessarily the only
source of information needed to make an adequate threshold determination. Once a threshold determination
is made, the lead agency is responsible for the completeness and accuracy of the checklist and other
supporting documents.
Use of checklist for nonprojectproposal -. gel
For nonproject proposals (such as ordinances, regulations, plans, and programs), complete the applicable parts of
sections A and B, plus the SUPPLEMENTAL S1IEE'1' FOR NONPROIEC'1' ACTIONS (part D�. Please completely answer all
questions that apply and note that the words "project," "applicant," and "property or site" should be read as
"proposal," "proponent," and "affected geographic area," respectively. The lead agency may exclude (for
nonprojects) questions in Part B (Environmental Elements) that do not contribute meaningfully to the analysis of the
proposal.
Bulletin #050 - May 1, 2014 Page 1 of 15 k:\Handouts\Environmental Checklistnlay2014
A. BACKGROUND JL1pJ
1. Name of proposed project, if applicable: hel
"The Woodlands at Redondo Creek"
2. Name of applicant: iel
RMJ Holdings, LLC % Dmitriy Mayzlin
3. Address and phone number of applicant and contact person: IWO
Applicant.
Dmitriy Mayzlin
RMJ Holdings, LLC
9675 SE 36t' St, Suite 105
Mercer Island, WA 98040
(206-) 588-1147
Contact Person:
Savanna Nagorski
ESM Consulting Engineers, LLC
33400 St' Ave S, Suite 205
Federal Way, WA 98003
(253) 838-6113
4. Date checklist prepared: DLeIW
October 18, 2019
5. Agency requesting checklist: el
City of Federal Way
6. Proposed timing or schedule (including phasing, if applicable): Jhdo
Process ill, SEPA and Preliminary Plat, Approval Fall 2020
Civil and Final Plat Approval Spring 2021
Sitework and Construction Summer 2021
Completion Fail2022
7. Do you have any plans for future additions, expansion, or further activity related to or connected with this
proposal? If yes, explain. hel
No, once the land use and permit applications are approved for development with the City, construction of the
site will begin and homes will be sold to individuals.
8. List any environmental information you know about that has been prepared, or will be prepared, directly
related to this proposal. DLeIW
Bulletin #050 — May 1, 2014 Page 2 of 15 k:\I1andouts\Environmenta1 Checklist May 2014
• 'Cultural Resources Report' prepared by Columbia Geotechnical Associates, Inc, June 2019,
• 'Arsenic and Lead Soil Assessment; prepared by ECI Environmental Services, July 2019,
• 'Critical Areas Report — Woodlands at Redondo; prepared by Sewall Wetland Consulting, Inc, October
2019,
• 'Tree Conservation Plan' prepared by Washington Forestry Consultants, inc (WFCI), October 2019;
• 'Preliminary Landscape Plan' prepared by Lyon Landscape Architects, October 2019,
• 'Geotechnical Engineering Study; prepared by Earth Solutions NW, October 2019;
• 'The Woodlands at Redondo Creek Revised Traffic Impact Analysis' prepared by TraffEx, September 2019;
• 'Preliminary Technical Information Report' prepared by ESM, October 2019.
9. Do you know whether applications are pending for governmental approvals of other proposals directly
affecting the property covered by your proposal? If yes, explain. icl
None known.
10. List any government approvals or permits that -will be needed for your proposal, if known. hcl �
All with the City of Federal Way:
Traffic Concurrency Certificate, Preliminary Plat Approval, SEPA Threshold Determination, Process 111 Critical
Area Buffer Averaging, Forest Practices Permit, Engineering Permit, Building Permits for future homes.
Lakehaven Utility District Developer Extension Agreement
Department of Ecology
NPDES General Construction Stormwater Permit, "No Further Action" opinion on Voluntary Cleanup
11. Give brief, complete description of your proposal, including the proposed uses and the size of the project
and site. There are several questions later in this checklist that ask you to describe certain aspects of your
proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to
include additional specific information on project description.) VLe1W
The Woodlands at Redondo Creek site consists of two undeveloped and forested parcels totaling 21.85 acres
on the north side of South 304th Street and the east side of Pacific Hwy S. A portion of the site features a
wetland and stream (Redondo Creek) as drainage from Steel Lake. The critical areas and their proposed
buffers total approximately 4.9 acres, or 22% of the entire site, contained in Tract A.
in order to accommodate the proposed homes and infrastructure on the sloped and constrained site, the
project proposes buffer averaging of the onsite wetland. The total area of construction within the standard
buffer is 18,674 SF, which will be compensated with 19,188 SF as extended buffer farther north of the
wetland.
Deducting Critical Areas (Tract A), Public Rights -of -Way dedications and Public Purpose lands (Tracts B-G),
the net plat area for the project is 9.42 acres. The site plan includes a total of 68 single-family homes meeting
RS 5.0 zoning dimension standards and will be served by public roads, water, and sewer.
12. Location of the proposal. Give sufficient information for a person to understand the precise location of
your proposed project, including a street address, if any, and section, township, and range, if known. If a
proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit
any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with
any permit applications related to this checklist. iel
Bulletin #050 — May 1, 2014 Page 3 of 15 k:\Handouts\F,nvironmental Checklist May 2014
The project includes King County tax parcel 042104-9012 and -9221, which totals approximately 21.85 acres
of RS 5.0 zoned property located in the northeastern portion of Federal Way adjacent to S 3041h St and Pacific
Hwy S.
Please see Exhibit A in the included Title Report for legal descriptions.
B. ENVIRONMENT u ELEMENTS ieU
1. Earth
a. General description of the site VLelpl
(underline/circle one): Flat, rolling, steep slopes, mountainous, other
Per the Geotechnical Report provided by Earth Solutions NW, "The site topography is characterized by a
moderate westward facing slope spanning the property that descends to a natural stream area. The slope
grade reaches approximately 15% or slightly greater near the wetland buffer where a stream is located."
b. What is the steepest slope on the site (approximate percent slope)? V20W
The steepest areas onsite are man-made slopes, ±40% at the existing entrance of 201h Ave S and at the NW
corner adjacent to Pacific Hwy S, all due to ROW grading. Otherwise ±15% across the site.
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you
know the classification of agricultural soils, specify them and note any agricultural land of long-term
commercial significance and whether the proposal results in removing any of these soils. hel
Topsoil encountered to depths of about 6-12 inches. Fill was not encountered during the geotechnical
exploration. Native soils that were encountered primarily consist of silty sand with gravel (USCS: SM). The
USDA "WSS resource identifies Alderwood series soils with varying slopes (AgB, AgC and AcD) as the
primary soil units underlying the subject site." Please refer to the Geotechnical Engineering Study prepared
by Earth Solutions NW.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe.
iel
There is an area in the central portion of the site that contains slopes inclines at 15% of greater and are
underlain by Alderwood series (AgD) soils, which meets the criteria for erosion hazard as defined by the
FWRC. Please refer to the Geotechnical Engineering Study prepared by Earth Solutions NW for additional
information
e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling,
excavation, and grading proposed. Indicate source of fill. h� elpl
The purpose of the site fill and grade activities are to provide an adequate and level surface for the single-
family units and infrastructure. There will be approximately 76,400 cubic yards of usable cut and 90,900
cubic yards of required fill, with a net fill of 14,500 CYDS.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. hel W
Erosion could occur as a result of clearing and construction, particularly if earthwork is completed during
periods of rainfall. TESC measures offered by the Geotechnical Engineer and approved by the City will be
implemented prior to construction.
Bulletin #050 — May 1, 2014 Page 4 of 15 k:At tandouts\l;nvironmental Checklist May 2014
g. About what percent of the site will be covered with impervious surfaces after project construction (for
example, asphalt or buildings)? -ie]
Approximately 21% of the site will be covered with impervious surfaces, or approximately 200,000 SF.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: gel
The applicant will institute a temporary erosion control plan to be used during earthwork and
construction.
2. Air
a. What types of emissions to the air would result from the proposal during construction, operation, and
maintenance when the project is completed? If any, generally describe and give approximate
quantities if known. VLeIW
Some heavy machinery exhaust and dust particulates generated primarily by construction equipment
could result during the development phase of this project.
b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally
describe. PLelpl
None known.
c. Proposed measures to reduce or control emissions or other impacts to air, if any: hel
All construction equipment will be in proper working order and regulated for emissions by the
manufacturer and local emissions laws. Vehicles entering and leaving the site will also be regulated for
emissions by state and local emissions laws. During construction the site will be watered as necessary to
keep any dust from impacting surrounding air quality.
3. Water
a. Surface Water el
1) Is there any surface water body on or in the immediate vicinity of the site (including year-round
and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names.
If appropriate, state what stream or river it flows into.[help]
Yes. There is a Category 11 wetland with 6 habitat points on the southwestern portion of the subject
property. The onsite wetland (Wetland A) drains from and is connected to a wetland and stream, then
to Steel Lake, south of S 3041 St "via a 30" plastic culvert. The flow is determined not to be an
equalizing culvert, thus separating it from wetlands south of S 304th St for the purpose of rating the
wetland fonsite]" (see 'Critical Areas Report' provided by Sewall Wetland Consulting).
There is also "an intermittent stream that flows from Steel Lake northerly through the site" (a part of
Redondo Creek). This stream "is a ditched feature through the center of Wetland A and drains to the
north towards SR 99 where is passes through a trash rack and enters a long culvert system before
daylighting to the north and west of SR 99." This stream is minor stream/non-fish bearing as it is
blocked by a natural downstream fish barrier, classified as a Ns stream with a 35' buffer.
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If
yes, please describe and attach available plans. helpJ
Bulletin #050 — May 1, 2014 Page 5 of 15 kAtlandouts\I?nvironmental ChecklistMay2014
Yes. The project proposes grading activities within 112.5 feet of the wetland and within 75' of the
stream in select locations. Controlled storm water discharge is also anticipated to occur inclose
proximity to the creek. None of the activities are proposed to occur within or over stream or wetland
features.
3) Estimate the amount of fill and dredge material that would be placed in or removed from surface
water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill
material. I
None proposed.
4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known. iel
Not proposed.
5) Does the proposal lie within a 100-year floodplain? If so, note the location on the site plan. liel
The site does not lie within a 100-year floodplain.
6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the
type of waste and anticipated volume of discharge. VLe1W
Not proposed.
b. Ground Water
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a
general description of the well, proposed uses, and approximate quantities withdrawn from the
well. Will water be discharged to groundwater? Give general description, purpose, and
approximate quantities if known. hf elp]
Not proposed.
2) Describe waste material that will be discharged into the ground from septic tanks or other sources,
if any (for example: domestic sewage; industrial containing the following chemicals... ;
agricultural; etc.). Describe the general size of the system, the number of such systems, the
number of houses to be served (if applicable), or the number of animals or humans the system(s)
are expected to serve. DLelpp
None proposed.
c. Water runoff (including stormwater):
1) Describe the source of runoff (including stormwater) and method of collection and disposal, if any
(include quantities, if known). Where will this water flow? Will this water flow into other waters? If
so, describe. hel
The proposed plat infrastructure (i.e. roads, sidewalks, landscaping), and the eventual build out of the
individual units would increase the impervious surface area of the site, causing an increase in
stormwater runoff volumes and velocities. To mitigate stormwater impacts, the storm drainage
improvements for the project consists of a detention facility designed to accommodate the stormwater
quantity control requirements for the targeted surface areas as required by the City. All detained and
Bulletin #050 —May 1, 2014 Page 6 of 15 k:\F1andouts\l;nvironmental Checklist May 2014
undetained storm water on the project parcels will be treated to meet the City's water quality
treatment standards prior to discharge to City's stormwater infrastructure. Stormwater will ultimately
discharge from the project at the site's natural discharge location near the northwest corner of the
property.
2) Could waste materials enter ground or surface waters? If so, generally describe. el _
Suspended soils and hydrocarbons associated with automobiles may potentially enter the ground
waters via storm water. This would be mitigated with water quality treatment facilities installed per
City of Federal Way standards.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so,
describe.
No - discharge will occur at the natural location.
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern
impacts, if any:
The project contractors, users, and personnel will utilize onsite Best Management Practices.
4. Plants "el
a. Check the types of vegetation found on the site: iel
_X_deciduous tree: alder, ma le,
_X_evergreen tree: fir, hemlock
_X_shrubs: salal, fern, sahnonberrv, plum, blackberry
b. What kind and amount of vegetation will be removed or altered? hel
Native and non-native tree and shrubs will be removed during site construction in the site developable
areas. Invasive species (blackberry) will also be removed from portions of the critical area and buffer and
conservation open space tracts.
c. List threatened and endangered species known to be on or near the site. hel
No native threatened or endangered plant species were observed or are known to occur on or immediately
adjacent to the site.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the
site, if any. hel
Native trees will be planted as appropriate to restore the critical areas and their buffers. Replacement trees
will also be planted across the site. Please refer to the Preliminary Landscape Plan prepared by Lyon
Landscape Architects.
e. List all noxious weeds and invasive species known to be on or near the site.
Himalayan blackberry
5. Animals
Bulletin #050 May 1, 2014 Page 7 of 15 kAHandouts\Environmental Checklist Afgy 2014
a. List any birds and other animals which have been observed on or near the site, or are known to be on
or near the site. Examples include: h� elp
Birds, mammals
fish: no fish inhabit the site
b. List any threatened and endangered species known to be on or near the site. "el
No listed species are known to occur on or near the site.
c. Is the site part of a migration route? If so, explain. gel
The entire region is known to be part of the Pacific Flyway. The Pacific Flyway includes Alaska and the
Aleutian Islands and the Rocky Mountains and Pacific coast regions of Canada, the United States and
Mexico, and south to where the Pacific Flyway becomes blended with other flyways in Central and South
America. However, the site is not known to be used by migratory fowl.
d. Proposed measures to preserve or enhance wildlife, if any. el
Native trees will be planted in buffer restoration areas, as appropriate.
e. List any invasive animal species known to be on or near the site.
No invasive animal species observed on site.
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed
projeces energy needs? Describe whether it will be used for heating, manufacturing, etc. [help]
Electrical energy will be the primary source of power serving the project. Natural gas may be used to satisfy
incidental energy needs.
b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally
describe. Liello
No, any proposed building height will not exceed 30 feet above grade. No existing development utilizes
solar energy in proximity to which the shadow cast from the building has any effect.
c. What kinds of energy conservation features are included in the plans of this proposal? List other
proposed measures to reduce or control energy impacts, if any. VLelpl
No plans included with the Land Use application. Energy conservation will be addressed in the building
permit documents.
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and
explosion, spill, or hazardous waste that could occur as a result of this proposal? If so, describe. hel
None known.
1) Describe any known or possible contamination at the site from present or past uses.
Bulletin #050 — May 1, 2014 Page 8 of 15 kAl Iandouts\Environmental Checklist May 2014
As a result from the Tacoma Smelter Plume, the 'Arsenic and Lead Soil Assessment' provided by ECl
Environmental Services states, "The results of the analysis performed on the samples indicate that the
average concentrations for Pb (Lead) and As (Arsenic) for the Subject Property are below the
concentration indicated by [Ecology Publication] 12-09-086A which would trigger a cleanup action.
However, one sample was found to be above the maximum allowed concentration for a discreet soil
sample for As, which triggers a cleanup in that area of the Subject Property."
2) Describe existing hazardous chemicals/conditions that might affect project development and
design. This includes underground hazardous liquid and gas transmission pipelines located within
the project area and in the vicinity.
See response to 1) above. The project will enter the state's Voluntary Cleanup Program. Additional
measures for remediation will be completed, including excavation and removal of the contamination
and soil mixing.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the
project's development or construction, or at any time during the operating life of the project.
None proposed.
4) Describe special emergency services that might be required.
Emergency medical and 911 services may be required, along with typical fire and police services.
Special services are not anticipated.
5) Proposed measures to reduce or control environmental health hazards, if any.
State regulations regarding safety and the handling of hazardous materials will be followed during the
construction process. Equipment refueling areas would be located in areas where a spill could be
quickly contained and where the risk of hazardous materials entering surface water is minimized.
b. Noise
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)? VLe1W
The primary source of noise near the project site is from vehicular traffic along S 304rd St and Pacific
Hwy S. It is not anticipated to materially impact the proposed project in any way.
2) What types and levels of noise would be created by or associated with the project on a short-term
or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours
noise would come from the site. Vjelpl
Short-term impacts would result from the use of construction equipment during the site development.
Construction would occur during permitted construction hours and always in compliance with the City
of Federal Way noise regulations. Long-term impacts would be those vehicular trips associated with
office space. Noise generated from the proposed office operations is not expected to impact
surrounding properties.
3) Proposed measures to reduce or control noise impacts, if any: VILIPJ
Bulletin #050 — May 1, 2014 Page 9 of 15 k:\Handouts\Environmental Checklist May 2014
Construction activity will be limited to permitted construction hours and construction equipment will
not be allowed to idle for continuous periods of time, which will help mitigate the impacts of potential
construction noise.
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses
on nearby or adjacent properties? If so, describe. hf elf]
The entirety of the site is forested, undeveloped property. The site is bordered to the north and east with
single-family neighborhoods. To the west is a public highway and community businesses. Single-family
residences and a regulated lake are south of the project site.
b. Has the project site been used as working farmlands or working forest lands? If so, describe. How
much agricultural or forest land of long-term commercial significance will be converted to other uses
as a result of the proposal, if any? If resource lands have not been designated, how many acres in
farmland or forest land tax status will be converted to nonfarm or nonforest use? h[ elf]
Unknown.
1) Will the proposal affect or be affected by surrounding working farm or forest land normal business
operations, such as oversize equipment access, the application of pesticides, tilling, and
harvesting? If so, how.
This project has an estimated 200,000 board feet of harvestable, merchantable timber, calculated by
Washington Forestry Consultants, Inc.
c. Describe any structures on the site. IhOW
No structures are on the site.
d. Will any structures be demolished? If so, what? h� ell
No structures are on the site.
e. What is the current zoning classification of the site? iel
RS 5.0 — Single Family Residential, within the proposed development area of the property.
f. What is the current comprehensive plan designation of the site? V14AW
Single Family Residential
g. If applicable, what is the current shoreline master program designation of the site? VLelp
Not applicable.
h. Has any part of the site been classified as a critical area by the city or county? If so, specify. he] W
The site contains a wetland and a portion of a stream (Redondo Creek) that are regulated by the City.
i. Approximately how many people would reside or work in the completed project? hel
Bulletin #050 — May 1, 2014 Page 10 of 15 k:AI-Iandonts\F,nvironmcntal Checklist May 2014
Approximately 184 people (2.71 people/unit according to the US Census' QuickFacts data from July 2018)
will reside at the completed project.
j. Approximately how many people would the completed project displace? -iel
The project will not displace any permanent residents. The site has several trespassers that setup camp in
the forest which will displace this small transient population.
k. Proposed measures to avoid or reduce displacement impacts, if any. VLeI4
The project proposes 68 homes which will positively impact the City's goals for increased quality housing
units within the City to provide for the growing population.
1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and
plans, if any. iel
The project will be developed in accordance with applicable City of Federal Way development and land use
codes to ensure the project is consistent with the goals and policies of the Comprehensive Plan and
applicable Development Regulations.
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of
long-term commercial significance, if any.
n. None proposed.
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-
income housing. hel
The project proposes 68 middle -income homes which will positively impact the City's goals for increased
quality housing units within the City to provide for the growing population.
b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-
income housing. Vielo
No homes will be eliminated.
c. Proposed measures to reduce or control housing impacts, if any. hel
The project proposes 68 homes which will positively impact the City's goals for increased quality housing
units within the City to provide for the growing population.
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal
exterior building material(s) proposed? VLe1W
The tallest height for the proposed buildings is 30' above average building elevation.
b. What views in the immediate vicinity would be altered or obstructed? VLe1W
Bulletin #050 May 1, 2014 Page 11 of 15 k:\Handouts\Environmental Checklist May 2014
No views will be altered by this development.
c. Proposed measures to reduce or control aesthetic impacts, if any. fheli�]
All healthy trees within Tracts A, D and F will be retained. Additional landscaping is proposed throughout
the project with replacement trees. Please see "Preliminary Landscape Plan" prepared by Lyon Landscape
Architects,
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur? V1,AW
Street lighting would occur from dusk through dawn at completed project. Minimal glare would occur from
sunlight reflected off parked cars. Additionally, the headlights of traveling vehicles would occur any time of
day. Some glare may be produced by the reflective glass windows during the early morning and late
afternoon periods of sunshine but would be retained on site.
b. Could light or glare from the finished project be a safety hazard or interfere with views? Vielo
No, not with the landscaping and setbacks included in the plan.
c. What existing off -site sources of light or glare may affect your proposal? VLelW
None.
d. Proposed measures to reduce or control light and glare impacts, if any.
With appropriate tree and shrub plantings across the site, and following the allowed building heights, glare
impacts will be minimized on the site.
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity? VLelW
The proposed subdivision site is located within the vicinity of 3 open space and recreation facilities
managed by the City of Federal Way Parks Department, in addition to the proximity to 2 school facilities
with recreational opportunities.
1. Steel Lake, with the Steel Lake Park recreation area approximately 1.25 miles from the project site.
Parking is available at this location that provides a beach with swimming, child's play structure,
lawn games and picnic areas;
2. Sacajowea Park is approximately .5 miles from the project site, a reasonable walking distance for
new residents. This park contains a child's play structure, soccer field, football field, tennis court,
two baseball fields and walking trails;
3. Wildwood Park is located approximately 0.3 miles from the project site equipped with walking
trails and natural, picnic and play areas,
4. Wildwood Elementary School is located approximately .35 miles from the new homes, equipped
with play equipment and sports fields,
5. Federal Way High School is about the same distance from the site with a track and sports fields.
Both school facilities provide additional recreation opportunities outside of school hours.
Bulletin #050 May 1, 2014 Page 12 of 15 k:\flandouts\I nvironmental Checklist May2014
b. Would the proposed project displace any existing recreational uses? If so, describe. hel
TMO
c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to
be provided by the project or applicant, if any. iel
The project proposes and is required to provide sidewalks on the frontage of S 304th St and on internal
roadways for pedestrian access. A usable open space with a playground is proposed as part of Tract E. The
preservation of the onsite critical areas and buffers provide conservation open space opportunities for the
residents and local area.
13. Historic and cultural preservation
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed
in or eligible for listing in national, state, or local preservation registers located on or near the site? If
so, specifically describe. h[ elp]
There are no structures on the site. The Washington Information System for Architectural and
Archaeological Records Data (WISAARD) does not identify any eligible historic buildings or sites near the
project site.
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may
include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural
importance on or near the site? Please list any professional studies conducted at the site to identify
such resources. hf elf]
No known landmarks or evidence have been observed on or near the site. Additionally, WISAARD's
interpolated 'Environmental Factors with Archaeological Resources Results' data layer indicates that the
site is Low Risk to Moderate Risk of archaeological evidence.
c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near
the project site. Examples include consultation with tribes and the department of archeology and
historic preservation, archaeological surveys, historic maps, GIS data, etc. hf elp]
The method used to assess the potential impacts included WISAARD online map provided by Washington's
Department of Archaeology and Historic Preservation.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to
resources. Please include plans for the above and any permits that may be required.
If any such historic or cultural evidence is encountered during construction or installation of improvements,
work will be halted in the area and a state -approved archeologist/historian will be engaged to investigate,
evaluate and/or move or curate such resources, as appropriate.
14. Transportation
a. Identify public streets and highways serving the site or affected geographic area and describe
proposed access to the existing street system. Show on site plans, if any. VLe1pJ
S 304rd St and 20th Ave S serve the project site.
Bulletin #050 — May 1, 2014 Page 13 of 15 k:\Handouts\Environmental Checklist May 2014
b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If
not, what is the approximate distance to the nearest transit stop? el
Yes, the site is serviced by Metro Transit RapidRide line A with 2 stops in the local vicinity, one southwest
of the project site approximately .5 miles away at the intersection of S 308th St and Pacific Hwy S (SR 99),
and the second northwest of the site approximately .75 miles from the site entrance at S Dash Point Rd
(SR 509) and Pacific Hwy S.
c. How many additional parking spaces would the completed project or non -project proposal have? How
many would the project or proposal eliminate? el
The final project will result in approximately 4 off-street parking spaces per unit, or 272 in total.
Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle, or
state transportation facilities, not including driveways? If so, generally describe (indicate whether
public or private). h[ el o
Development of the project will require roads to be developed for access throughout the site. Expansion
and improvements to the current S 304th St ROW fronting the property is also part of this project.
d. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation?
If so, generally describe. flLe1W
Not expected.
e. How many vehicular trips per day would be generated by the completed projector proposal? If known,
indicate when peak volumes would occur and what percentage of the volume would be trucks (such as
commercial and non -passenger vehicles). What data or transportation models were used to make these
estimates? hf glp]
The development of 68 single family residential homes is anticipated to generate 642 average weekday
daily trips. It is estimated that the proposed development will create 51 AM pear hour trips and 68 PM
peak hour trips. The trip generation estimates are based on the ITE Trip Generation Manual, 101h Edition,
ITE Code 210 and is provided in the 'The Woodlands at Redondo Creek Revised Traffic Impact Analysist'
prepared by TraffEx.
f. Will the proposal interfere with, affect, or be affected by the movement of agricultural and forest
products on roads or streets in the area? If so, generally describe.
Not expected.
g. Proposed measures to reduce or control transportation impacts, if any. liel
Payment of the City's transportation impact fee will help fund City-wide transportation improvements.
15. Public services
a. Would the project result in an increased need for public services (for example: fire protection, police
protection, public transit, health care, schools, other)? If so, generally describe. ftelpj
The completed single-family development would result in a slight, increased need for public services to
include fire protection, police protection, and health care for the new volume of residents that will reside
within the project site.
Bulletin #050 — May 1, 2014 Page 14 of 15 k:\I Iandouts\Environmental Checklist May 2014
b. Proposed measures to reduce or control direct impacts on public services, if any. Pielpj
The increased demand will be offset by impact fees, levies, and taxes required to be paid by the applicant
as part of this development. The proposal has been designed in a manner that will provide adequate access
for fire, medic, and police vehicles. Property taxes generated by the proposed units should be sufficient to
offset any increases in public service needs.
16. Utilities
a. Underline/circle utilities currently available at the site: hel
electricity, natural gas, water, refuse service, telephone sanitary sewer, septic system, other
The above listed utilities are either available on -site or will be extended as necessary to serve the site.
b. Describe the utilities that are proposed for the project, the utility providing the service, and the general
construction activities on the site or in the immediate vicinity which might be needed. JeIVI
Lakehaven Utility District will provide water and sewer connection.
Puget Sound Energy will supply electricity and gas
Telephone: Century Link, Verizon, Comcast
Fire Protection: South King Fire & Rescue
School District: Federal Way School District
C. SIGNATURE HELP
The above answers are true and complete to the best of my knowledge. I understand that the lead agency is
relying on them to make its decision.
Signature:
Printed NaYne of Signee: J 1J1/647!_ A4,
Position and Agency/Organization: t��nner� �' �>'�) (`6a Sh lhn4 a'lgj _WQ
Date Submitted: iO L3 /I -1
Bulletin #050 — May 1, 2014 Page 15 of 15 k:\Handouts\Environmental Checklist May 2014