Loading...
Traffic Impact Analysis THE WOODLANDS AT REDONDO CREEK REVISED TRAFFIC IMPACT ANALYSIS CITY OF FEDERAL WAY Prepared for Dmitriy Mayzlin RMJ Holdings LLC 9675 SE 36th Street, Suite 105 Mercer Island, WA 98040 Prepared by 11410 NE 124th St., #590 Kirkland, Washington 98034 Telephone: 425.522.4118 Fax: 425.522.4311 September 28, 2019 Page 1 September 28, 2019 Dmitriy Mayzlin RMJ Holdings LLC 9675 SE 36th Street, Suite 105 Mercer Island, WA 98040 Re: Woodlands at Redondo Creek - City of Federal Way Traffic Impact Analysis Dear Mr.Mayzlin: We are pleased to submit this traffic impact analysis (TIA) report for the proposed 68 lot Woodlands at Redondo Creek Plat located on the north side of S 304th St. and of 20th Ave S in the City of Federal Way. SUMMARY OF SCOPE OF TIA The traffic items to be analyzed in this TIA were identified by City of Federal Way staff in conjunction with the proponent and includes: · Evaluate AM and PM peak hour traffic conditions at the S 304th St./20th Ave S intersection for existing and future conditions. · Determine if a left turn lane is warranted on S 304th St, at 20th Ave SE. · Measure and evaluate sight distance at the two plat access intersections and S 304th St/20th Ave S intersection. · Evaluate potential neighborhood traffic issues for nearby streets. PROJECT DESCRIPTION Figure 1 is a vicinity map showing the location of the site and study area. Figure 2 is the site plan showing 68 lots. The site is located on the north side of S 304th St. and west of 20th Ave South. The site access street connects to 20th Ave S at S 302nd Pl. and S 300th Street. The Woodlands at Redondo Creek Page 2 Development of The Woodlands at Redondo Creek is expected to occur by the year 2021. Therefore, for purposes of this study, 2021 is used as the horizon year. TRIP GENERATION AND DISTRIBUTION The 68 lots in the proposed Woodlands at Redondo Creek are expected to generate the vehicular trips during an average weekday and during the street traffic peak hours as shown below: TRIP GENERATION FOR THE 68 LOTS OF WOODLANDS AT REDONDO CREEK Time Period Trip Rate Trips Entering Trips Exiting Total Average Weekday 9.44 321 50% 321 50% 642 AM Peak Hour 0.75 13 25% 38 75% 51 PM Peak Hour 1.00 44 64% 22 36% 68 A vehicle trip is defined as a single or one direction vehicle movement with either the origin or destination (exiting or entering) inside the study site. The trip generation is calculated using the average trip rates in the Institute of Transportation Engineers (ITE) Trip Generation, Tenth Edition, for Single Family Detached Housing (ITE Land Use Code 210). These trip generation values account for all site trips made by all vehicles for all purposes, including resident, visitor, and service and delivery vehicle trips. TRIP DISTRIBUTION AND ASSIGNMENT Figure 3 shows the AM and PM peak hour site generated traffic volumes and distribution for the Woodlands at Redondo Creek project at the study intersection and the existing street network. The trip distribution is based on existing traffic volume count patterns, the characteristics of the street network, the location of likely trip origins and destinations (employment, shopping, social and recreational opportunities), expected travel times, and previous traffic studies in the City of Federal Way. The Woodlands at Redondo Creek Page 3 EXISTING PHYSICAL CONDITIONS Street Facilities The streets in the study area are classified per the City of Federal Way Comprehensive Plan as follows: I 5 Interstate SR 99 Principal Arterial Military Rd Minor Arterial S 304th St, 28th Ave S Principal Collector 20th Ave S, 23rd Ave S, S 298th St Minor Collector In the vicinity of the site, S 304th St has a speed limit of 30 mph and consists of two lanes. There are no curb, gutter or sidewalk along the site frontage on S 304th Street. There is a sidewalk along the east side of 20th Ave S between S 302nd Pl and S 304th Street. Sight Distance Intersection sight distances and stopping sight distances were measured and compared to City requirements at the S 304th St./20th Ave S intersection and at the two new site access street locations to 20th Ave S at S 302nd Pl and S 300th Street. City of Federal Way requirements are based on current AASHTO “Geometric Design of Highways and Streets” standards. The posted speed limit on S 304th St is 30 mph. A posted speed of 30 mph infers a design speed o 35 mph. For a design speed of 35 mph, an intersection sight distance (ISD) of 335 ft is required for right turning vehicles exiting the side street, and 390 ft for left turning vehicles exiting the side street. The field measured ISD is > 400 ft. to the east and > 400 ft to the west and therefore meets requirements. The required stopping sight distance (SSD) for a 35 mph design speed is 250 ft. The measured stopping sight distance is <400 ft. to the east and 330 ft to the west and therefore meets requirements. A posted speed of 25 mph infers a design speed of 30 mph. For a design speed of 30 mph, an ISD of 335 ft. and a SSD of 200 ft. is required. The ISD and SSD were field measured at both site access intersections to 20th Ave S and meet requirements. The Woodlands at Redondo Creek Page 4 EXISTING TRAFFIC CONDITIONS Traffic Volumes Figure 5 shows the existing AM and PM peak hour traffic volumes at the S 304th St./20th Ave S study. Counts were taken on Thursday 9-19-2019 and are included in the technical appendix. Level of Service Analysis LOS is a qualitative measure describing operational conditions within a traffic flow, and the perception of these conditions by drivers or passengers. These conditions include factors such as speed, delay, travel time, freedom to maneuver, traffic interruptions, comfort, convenience, and safety. Levels of service are given letter designations, from A to F, with LOS A representing the best operating conditions (free flow, little delay) and LOS F the worst (congestion, long delays). Generally, LOS A and B are high, LOS C and D are moderate and LOS E and F are low. Tables 1 and 2 show calculated level of service (LOS) for existing and future conditions including project traffic at the pertinent street intersection. The LOS was calculated using the procedures in the Transportation Research Board Highway Capacity Manual The LOS shown indicates overall intersection operation. At intersections, LOS is determined by the calculated average control delay per vehicle. The LOS and corresponding average control delay in seconds are as follows: TYPE OF INTERSECTION A B C D E F Stop Sign Control <10 .0 >10 and <15 >15 and <25 >25 and <35 >35 and <50 >50 Tables 1 and 2 show that the study intersection currently operates at LOS A or B for existing and future conditions including project generated trips. The LOS calculation worksheets are included in the technical appendix. FUTURE TRAFFIC CONDITIONS Figure 4 shows projected future AM and PM peak hour traffic volumes including existing traffic, background growth and project generated traffic Background Growth An annual background growth rate of 2% per year was used per previously approved studies in the area. The 2% growth factor, over a two year period (from 2019 to 2021 totaling 4%), was added to the 2019 existing traffic volumes. The Woodlands at Redondo Creek Page 5 FUTURE TRAFFIC CONDITIONS WITH PROJECT Figure 4 shows the projected future 2021 AM and PM peak hour traffic volumes with the proposed project. The site-generated peak hour traffic volumes were added to the projected future without project volumes to obtain the future with project volumes. Tables 1 and 2 show calculated LOS for future conditions at the study intersection.. The study intersection operates at an excellent LOS A or B in the AM and PM peak future 2021 conditions. LEFT TURN LANE WARRANT A left turn lane warrant analysis was performed for eastbound to northbound left turns from S 304th St. to 20th Ave south. Figure 5 shows Table M22-01.17 from the WSDOT Design manual. For future conditions including project volumes, a left turn lane would not be warranted at the time of project completion. NEIGHBORHOOD IMPACTS Other than a general lack of sidewalks on the surrounding streets, we did not observe any readily apparent traffic issues. The majority (70%) of the project generated traffic is oriented from the site access point at the intersection of 20th Ave S /S 302nd Pl toward the south along 20th Ave S to 304th Street. There is an existing sidewalk along the east side of 20th Ave S from S 302nd Pl to S 304th Street. TRAFFIC MITIGATION REQUIREMENTS Frontage Improvements Half street frontage improvements are required on 20th Ave S and on S 304th Street. The standard cross section on 304th St. S for this class street is for three 12 ft lanes. We understand due to wetlands on both the north and south sides of S 304th St, there will be no future access streets or driveways along 304th St S between S 20th St and SR 99. To minimize impacts to the wetland, we understand the proponent will request a variance to the frontage improvements to reduce the widening. Assuming that ultimately there will be a left turn lane warranted on S 304th St. both at 20th St S and also at SR 99, the site frontage widening would need to allow for these future left turn lanes and associated tapers. Per Federal Way standard detail 3-20, the left turn lane and taper on S 304th St at S 20th St would be, 50 ft storage, 50 ft opening and 180 ft taper totaling 280 ft. The left turn lane at SR 99 would be, 100 ft storage, 50 ft opening and 180 ft taper totaling 330 ft. The distance from the stop bar at SR 99 to the stop bar at S 20th St. is approximately 900 feet. Therefore, there will be a 300 ft area along 304th St S between the two intersections where only a two lane cross section will be required. The Woodlands at Redondo Creek Page 6 Traffic Impact Fee The City of Federal Way requires a Traffic Impact Fee payment for each new single family home. The impact fee should be based on the net increase of single family homes which would be 68 single family homes minus the number of existing homes to be removed with the development. Neighborhood Traffic Impacts Surrounding neighborhood streets should be monitored to determine if issues such as speeding or cut through traffic arise with the development. Speed humps, signage and other appropriate measures may be implemented at that time. SUMMARY, CONCLUSIONS AND RECOMMENDATIONS We recommend that the Woodlands at Redondo Creek be constructed as shown on the revised site plan with the following traffic impact mitigation measures: · Construct the frontage improvements including curb, gutter, landscape strip and sidewalk along the site frontage on S 304th St and 20th Ave so as to allow future construction of left turn lanes at S 20th St and SR 99. · Construct the internal site streets to City standards. · Contribute a traffic impact fee. No other traffic mitigation should be necessary. If you have any questions, please call 425-522-4118. You may also contact us via e-mail at vince@nwtraffex.com or larry@nwtraffex.com. Very truly yours, Vincent J. Geglia Larry D. Hobbs, P.E. Principal Principal TraffEx TraffEx The Woodlands at Redondo Creek Page 7 TABLE 1 AM PEAK HOUR LEVEL OF SERVICE SUMMARY THE WOODLANDS AT REDONDO CREEK INTERSECTION EXISTING 2019 2021 WITHOUT PROJECT 2021 WITH PROJECT 20th Ave S / S 304th St B 10.0 SB B 10.0 SB B 10.8 SB TABLE 2 PM PEAK HOUR LEVEL OF SERVICE SUMMARY THE WOODLANDS AT REDONDO CREEK INTERSECTION EXISTING 2019 2021 WITHOUT PROJECT 2021 WITH PROJECT 20th Ave S / S 304th St A 9.9 SB B 10.1 SB B 11.4 SB * Number shown is the average control delay in seconds per vehicle for the worst approach or movement which determines the LOS for an unsignalized intersection per the Transportation Research Board Highway Capacity Manual Example : A Level of service 9.9 Average control delay SB Approach direction * Figure 1 Project Site TheWoodlandsatRedondoCreek-FederalWay VicinityMap * Figure 2 Project Site TheWoodlandsatRedondoCreek-FederalWay SitePlan 1 3 2 11 ProjectSite1 2 38%52%42Figure 3 WoodlandsatRedondoCreek-FederalWay AMandPMPeakHourTripGenerationandDistribution AM 15%PercentageofProject Traffic PMPeakHour TrafficVolume Enter44 Exit24 Total68 14% 20% S304thSt PeakHour TrafficVolume 20%10%30%tothenorth 11633 4 1241 2 30%3630%1320% 1 2 2 70%14870%32774 2 43NAccess/ 156th ave 274 1 33S Access/ 156th Ave 214 0 02SE142 Pl156thAve/724 8 10% 5% 48% 1 22 24 23 22 25 3016 1 0 0 0 0 000SE 32nd/ 241st Av 20thAveS50% PM LegendLegend AMPeakHour TrafficVolume Enter13 Exit38 Total51 311419086 3 0 0 0 0 000S304th/ 20th Ave 120522 9 0 0 0 0 000S304th/ 20th Ave 1 3 2 5 ProjectSite1 2 38%52%42Figure 4 WoodlandsatRedondoCreek-FederalWay AMandPMPeakHourVolumesatS304thSt/20thAveS Legend 15%PercentageofProject Traffic Enter17 Exit31 Total48 14% 20%50% AMPeakHour TrafficVolume20%10%11633 4 123 41 2 30%3630%1320% 1 270%14870%32774 2 43NAccess/ 156th ave 274 1 33S Access/ 156th Ave 214 0 02SE142 Pl156thAve/724 8 10% 5% 48% 2 23 22 25 3016 1 0 0 0 0 000SE 32nd/ 241st Av Project TrafficExisting Future withProject Future withoutProject 222 2 111 1AM Peak Hourt PM Peak Hour 19086 3 0 0 0 0 0007012 1 174 267 0 0 0008012 1 188 289 0 0 00027098 4 188 289 0 0 000120522 9 0 0 0 0 0001003 0 247 282 0 0 0001003 0 267 305 0 0 000130525 9 267 305 0 0 000 1 3 2 5 ProjectSite1 2 38%52%42Figure 5 WoodlandsatRedondoCreek-FederalWay LeftTurnLaneWarrantatS304thSt/20thAveS Legend 15%PercentageofProject Traffic PMPeakDHV=606 Exit31 Total48 14% 20%50% AMPeakHour TrafficVolume20%10%11633 4 123 41 2 30%3630%1320% 1 270%14870%32774 2 43NAccess/ 156th ave 274 1 33S Access/ 156th Ave 214 0 02SE142 Pl156thAve/724 8 10% 5% 48% 2 23 22 25 3016 1 0 0 0 0 000SE 32nd/ 241st Av %leftturnvol/DHV=25/606=4.1% TECHNICAL APPENDIX Prepared for: Traffex Traffic Count Consultants, Inc. Phone: (253) 770-1407 FAX: (253) 770-1411 E-Mail: Team@TC2inc.com WBE/DBE Intersection:20th Ave S & S 304th St Date of Count:Thurs 9/19/2019 Location:Federal Way, Washington Checked By:Jess Time From North on (SB)From South on (NB)From East on (WB)From West on (EB)Interval Interval 20th Ave S 0 S 304th St S 304th St Total Ending at T L S R T L S R T L S R T L S R 7:15 A 0 0 0 2 0 0 0 0 3 0 68 0 3 2 49 0 121 7:30 A 0 0 0 1 0 0 0 0 2 0 73 0 1 0 42 0 116 7:45 A 0 0 0 1 0 0 0 0 0 0 65 0 2 0 37 0 103 8:00 A 0 1 0 3 0 0 0 0 6 0 61 1 1 0 46 0 112 8:15 A 0 0 0 1 0 0 0 0 2 0 63 0 0 1 30 0 95 8:30 A 0 0 0 0 0 0 0 0 2 0 56 0 2 1 50 0 107 8:45 A 0 3 0 2 0 0 0 0 1 0 45 1 2 1 35 0 87 9:00 A 0 0 0 1 0 0 0 0 3 0 43 0 1 0 35 0 79 9:15 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 0 4 0 11 0 0 0 0 19 0 474 2 12 5 324 0 820 Peak Hour:7:00 AM to 8:00 AM Total 0 1 0 7 0 0 0 0 11 0 267 1 7 2 174 0 452 Approach 8 0 268 176 452 %HV n/a n/a 4.1%4.0%4.0% PHF 0.50 n/a 0.92 0.86 0.93 20th Ave S 11 8 3 0 Bike S 304th St 7 0 1 0 Ped S 304th St 1 274 Ped 0 267 268 Bike 0 0 443 450 2 0 Bike 176 174 7:00 AM to 8:00 AM 0 Ped 175 0 PEDs Across:N S E W Ped 2 0 0 0 484 1.0 PHF Peak Hour Volume INT 01 2 2 Bike 0 PHF %HV INT 02 0 EB 0.86 4.0% INT 03 0 0 0 Check WB 0.92 4.1% INT 04 0 In:452 NB n/a n/a INT 05 1 2 3 0 Out:452 SB 0.50 n/a INT 06 1 1 0 T Int.0.93 4.0% INT 07 0 Bicycles From:N S E W Conditions: INT 08 1 1 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 0 INT 12 0 INT 05 0 1 6 0 0 7 INT 06 NO BIKES 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 0 0 0 0 TRA19104M_01a Prepared for: Traffex Traffic Count Consultants, Inc. Phone: (253) 770-1407 FAX: (253) 770-1411 E-Mail: Team@TC2inc.com WBE/DBE Intersection:20th Ave S & S 304th St Date of Count:Thurs 9/19/2019 Location:Federal Way, Washington Checked By:Jess Time From North on (SB)From South on (NB)From East on (WB)From West on (EB)Interval Interval 20th Ave S 0 S 304th St S 304th St Total Ending at T L S R T L S R T L S R T L S R 4:15 P 0 3 0 1 0 0 0 0 0 0 40 1 1 3 57 0 105 4:30 P 0 0 0 1 0 0 0 0 6 0 61 6 1 2 72 0 142 4:45 P 0 2 0 0 0 0 0 0 1 0 61 1 0 1 62 0 127 5:00 P 0 2 0 0 0 0 0 0 1 0 54 0 1 1 58 0 115 5:15 P 0 0 0 0 0 0 0 0 0 0 59 0 2 0 67 0 126 5:30 P 0 0 0 0 0 0 0 0 0 0 65 0 0 1 80 0 146 5:45 P 0 0 0 0 0 0 0 0 1 0 71 0 2 0 49 0 120 6:00 P 0 0 0 1 0 0 0 0 0 0 87 0 1 2 51 0 141 6:15 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 0 7 0 3 0 0 0 0 9 0 498 8 8 10 496 0 1022 Peak Hour:5:00 PM to 6:00 PM Total 0 0 0 1 0 0 0 0 1 0 282 0 5 3 247 0 533 Approach 1 0 282 250 533 %HV n/a n/a 0.4%2.0%1.1% PHF 0.25 n/a 0.81 0.77 0.91 20th Ave S 4 1 3 0 Bike S 304th St 1 0 0 1 Ped S 304th St 0 283 Ped 0 282 282 Bike 0 0 529 533 3 0 Bike 250 247 5:00 PM to 6:00 PM 0 Ped 247 0 PEDs Across:N S E W Ped 0 0 0 0 584 1.0 PHF Peak Hour Volume INT 01 1 1 Bike 0 PHF %HV INT 02 0 EB 0.77 2.0% INT 03 0 0 0 Check WB 0.81 0.4% INT 04 1 1 In:533 NB n/a n/a INT 05 1 1 0 Out:533 SB 0.25 n/a INT 06 0 0 T Int.0.91 1.1% INT 07 0 Bicycles From:N S E W Conditions: INT 08 0 INT 01 1 1 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 1 1 INT 12 0 INT 05 0 2 1 0 0 3 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 0 2 0 2 TRA19104M_01p EXISTING 3: S 304TH ST & 20TH AVE S 9/27/2019 9/27/2019 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 0.2 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 2 174 267 1 1 7 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 0 4 4 0 0 0 Mvmt Flow 2 187 287 1 1 8 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 288 0 - 0 479 288 Stage 1 - - - - 288 - Stage 2 - - - - 191 - Critical Hdwy 4.1 - - - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.2 - - - 3.5 3.3 Pot Cap-1 Maneuver 1286 - - - 549 756 Stage 1 - - - - 766 - Stage 2 - - - - 846 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1286 - - - 548 756 Mov Cap-2 Maneuver - - - - 548 - Stage 1 - - - - 766 - Stage 2 - - - - 844 - Approach EB WB SB HCM Control Delay, s 0.1 0 10 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1286 - - - 722 HCM Lane V/C Ratio 0.002 - - - 0.012 HCM Control Delay (s) 7.8 0 - - 10 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0 AM FUTURE WITHOUT PROJECT 3: S 304TH ST & 20TH AVE S 9/27/2019 9/27/2019 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 0.2 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 2 188 267 1 1 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 0 4 4 0 0 0 Mvmt Flow 2 202 287 1 1 9 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 288 0 - 0 494 288 Stage 1 - - - - 288 - Stage 2 - - - - 206 - Critical Hdwy 4.1 - - - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.2 - - - 3.5 3.3 Pot Cap-1 Maneuver 1286 - - - 538 756 Stage 1 - - - - 766 - Stage 2 - - - - 833 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1286 - - - 537 756 Mov Cap-2 Maneuver - - - - 537 - Stage 1 - - - - 766 - Stage 2 - - - - 831 - Approach EB WB SB HCM Control Delay, s 0.1 0 10 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1286 - - - 723 HCM Lane V/C Ratio 0.002 - - - 0.013 HCM Control Delay (s) 7.8 0 - - 10 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0 AM FUTURE WITH PROJECT 3: S 304TH ST & 20TH AVE S 9/27/2019 9/27/2019 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 0.9 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 8 188 289 4 9 27 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 0 4 4 0 0 0 Mvmt Flow 9 202 311 4 10 29 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 315 0 - 0 532 313 Stage 1 - - - - 313 - Stage 2 - - - - 219 - Critical Hdwy 4.1 - - - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.2 - - - 3.5 3.3 Pot Cap-1 Maneuver 1257 - - - 512 732 Stage 1 - - - - 746 - Stage 2 - - - - 822 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1257 - - - 508 732 Mov Cap-2 Maneuver - - - - 508 - Stage 1 - - - - 746 - Stage 2 - - - - 815 - Approach EB WB SB HCM Control Delay, s 0.3 0 10.8 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1257 - - - 659 HCM Lane V/C Ratio 0.007 - - - 0.059 HCM Control Delay (s) 7.9 0 - - 10.8 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.2 PM EXISTING 3: S 304TH ST & 20TH AVE S 9/27/2019 9/27/2019 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 3 247 282 0 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 91 91 91 91 91 91 Heavy Vehicles, % 0 2 0 0 0 0 Mvmt Flow 3 271 310 0 0 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 310 0 - 0 588 310 Stage 1 - - - - 310 - Stage 2 - - - - 278 - Critical Hdwy 4.1 - - - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.2 - - - 3.5 3.3 Pot Cap-1 Maneuver 1262 - - - 475 735 Stage 1 - - - - 748 - Stage 2 - - - - 774 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1262 - - - 474 735 Mov Cap-2 Maneuver - - - - 474 - Stage 1 - - - - 748 - Stage 2 - - - - 772 - Approach EB WB SB HCM Control Delay, s 0.1 0 9.9 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1262 - - - 735 HCM Lane V/C Ratio 0.003 - - - 0.001 HCM Control Delay (s) 7.9 0 - - 9.9 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0 PM FUTURE WITHOUT PROJECT 3: S 304TH ST & 20TH AVE S 9/27/2019 9/27/2019 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 3 267 305 0 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 91 91 91 91 91 91 Heavy Vehicles, % 0 2 0 0 0 0 Mvmt Flow 3 293 335 0 0 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 335 0 - 0 635 335 Stage 1 - - - - 335 - Stage 2 - - - - 300 - Critical Hdwy 4.1 - - - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.2 - - - 3.5 3.3 Pot Cap-1 Maneuver 1236 - - - 446 712 Stage 1 - - - - 729 - Stage 2 - - - - 756 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1236 - - - 445 712 Mov Cap-2 Maneuver - - - - 445 - Stage 1 - - - - 729 - Stage 2 - - - - 754 - Approach EB WB SB HCM Control Delay, s 0.1 0 10.1 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1236 - - - 712 HCM Lane V/C Ratio 0.003 - - - 0.002 HCM Control Delay (s) 7.9 0 - - 10.1 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0 PM FUTURE WITH PROJECT 3: S 304TH ST & 20TH AVE S 9/27/2019 9/27/2019 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 0.7 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 25 267 305 9 5 13 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 91 91 91 91 91 91 Heavy Vehicles, % 0 2 0 0 0 0 Mvmt Flow 27 293 335 10 5 14 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 345 0 - 0 688 340 Stage 1 - - - - 340 - Stage 2 - - - - 348 - Critical Hdwy 4.1 - - - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.2 - - - 3.5 3.3 Pot Cap-1 Maneuver 1225 - - - 415 707 Stage 1 - - - - 725 - Stage 2 - - - - 719 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1225 - - - 404 707 Mov Cap-2 Maneuver - - - - 404 - Stage 1 - - - - 725 - Stage 2 - - - - 700 - Approach EB WB SB HCM Control Delay, s 0.7 0 11.4 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1225 - - - 585 HCM Lane V/C Ratio 0.022 - - - 0.034 HCM Control Delay (s) 8 0 - - 11.4 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0.1 - - - 0.1