Loading...
Geotechnical Engineering StudyEarthSolutionsNWLLC EarthSolutions NW LLC Geotechnical Engineering Construction Observation/Testing Environmental Services 15365 N.E.90th Street,Suite 100 Redmond,WA 98052 (425)449-4704 Fax (425)449-4711 www.earthsolutionsnw.com GEOTECHNICAL ENGINEERING STUDY PROPOSED WOODLANDS AT REDONDO CREEK RESIDENTIAL DEVELOPMENT 3023X -20 AVENUE SOUTH FEDERAL WAY,WASHINGTON ES-6637 TH Geotechnical Engineering,Construction Observation/Testing and Environmental Services Drwn.CAM Checked SES Date April 2019 Date 04/25/2019 Proj.No.6637 Plate 1 Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC Vicinity Map Danilchik Property Federal Way,Washington Reference: King County,Washington Map 745 By The Thomas Guide Rand McNally 32nd Edition NORTH NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. SITE Plate Proj.No. Date Checked By Drwn.ByEarthSolutionsNWLLCGeotechnicalEngineering,ConstructionObservation/TestingandEnvironmentalServicesEarthSolutionsNWLLCEarthSolutionsNWLLCAmB AgC Sk AmB AgD AgC AgDStormPond pacific highway s.s.304thstreet20th avenue s. Water Tower 440 440 450 450 460 460 480490 500510 470 470 480 490 500 510 TP-1 TP-2 TP-3 TP-4 TP-5 TP-6 TP-7 TP-8 NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. NOTE:The graphics shown on this plate are not intended for design purposes or precise scale measurements,but only to illustrate the approximate test locations relative to the approximate locations of existing and /or proposed site features.The information illustrated is largely based on data provided by the client at the time of our study.ESNW cannot be responsible for subsequent design changes or interpretation of the data by others. LEGEND Approximate Location of ESNW Test Pit,Proj.No. ES-6637,April 2019 Subject Site 15%+Slope in AgD Soils TP-1 NORTH0 75 150 300 Sc ale in Feet1"=150' MRS SSR 09/30/2019 6637 2TestPitLocationPlan DanilchikPropertyFederalWay,Washington Drwn.CAM Checked SES Date April 2019 Date 04/26/2019 Proj.No.6637 Plate 3 Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC Geotechnical Engineering,Construction Obser vation/Testing and Environmental Services Retaining Wall Drainage Detail Danilchik Property Federal Way,Washington NOTES: Free-draining Backfill should consist of soil having less than 5 percent fines. Percent passing No.4 sieve should be 25 to 75 percent. Sheet Drain may be feasible in lieu of Free-draining Backfill,per ESNW recommendations. Drain Pipe should consist of perforated, rigid PVC Pipe surrounded with 1-inch Drain Rock. LEGEND: Free-draining Structural Backfill 1-inch Drain Rock 18"Min. Structural Fill Perforated Rigid Drain Pipe (Surround in Drain Rock) SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAWING Drwn.CAM Checked SES Date April 2019 Date 04/26/2019 Proj.No.6637 Plate 4 Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC Geotechnical Engineering,Construction Observation/Testing and Environmental Services Footing Drain Detail Danilchik Property Federal Way,Washington Slope Perforated Rigid Drain Pipe (Surround in Drain Rock) 18"Min. NOTES: Do NOT tie roof downspouts to Footing Drain. Surface Seal to consist of 12"of less permeable,suitable soil.Slope away from building. LEGEND: Surface Seal:native soil or other low-permeability material. 1-inch Drain Rock SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING