08-105231 Building - Commercial
City d Federal Way
Community D4yelopment Services Permit #: 08-105231-00-CO
P.O.Box 9718
Federal Way,WA 98063-9718 Inspection Request Line: (2
53)(253)835-2607 Fax (253)835-2609 r, p q 835-3050
Ems •: _ ,
Project Name: WORLD VISION US
Project Address: 34834 WEYERHAEUSER WAY S Suite 200 Parcel Number: 222104 9031
Project Description: TI-Create(2) meeting rooms by constructing(4)walls.No plumbing or mechanical.
Owner Applicant Contractor Lender
WORLD VISION US SUPERIOR BUILDERS INC SUPERIOR BUILDERS INC WORLD VISION US
PO BOX 8716 PO BOX 1849 SUPERBI112D2 (3/4/09) PO BOX 8716
FEDERAL WAY WA 98063 MILTON WA 98354-1849 PO BOX 1849 FEDERAL WAY WA 98063
MILTON WA 98354-1849
Census Category: 437 - Commercial alt/add/conversion
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area(sq.ft.) 0 0 0 0
Ike%krir
Existing Sprinkler System in Building?........ .... _Yes Mechanical to be Included? ........ ... ......,...,....No
Number of Stories. 4 Permit for Building Shell Only?............................No
Plumbing to be Included? No New/Additional Sq.Feet-Total 0
Zoning Designation OP-1
PERMIT EXPIRES Tuesday, May 19, 2009
Permit Issued on Thursday, November 20, 2008
I hereby certify that the above information is correct a • that the construction on the above described property and
the occupancy and the us will be i car.:nce wi • the laws, rules and regulations of the State of Washington
and the ' ity of Federal Way.
Owner or agent: , � Date: // (-90/0
- iiii, THIS CARD IS TO REMAIN ON-SITE
. CITY OF Community Development Inspection Record
Federal Way IVR INSPECTION REQUEST PHONE # (253) 835-3050
PERMIT #: 08-105231-00-CO
Owner: WORLD VISION US
Address: 34834 WEYERHAEUSER WAY S Suite 200
FEDERAL WAY, WA 98003
This card is part of your required inspection documents. Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD.
Inspections are listed as close to sequential order as possible(read left to right,top to bottom)..Please schedule inspections as appropriate. Work must not
be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections
are logged on the back of this card.
0 Footings/Setback(4110) 0 Re-steel (4215) ❑ Slab/Concrete Floor(4255)
Approved to place concrete Approved to place concrete or grout Approved to place concrete
By Date By Date By Date
0 Underfloor Framing(4285) ❑ Floor Sheathing(4105) 0 Fire/Draft Stops(4095)
Approved to sheath floor Approved to install flooring Approved
By Date By Date By Date
NOTE: Prior to scheduling a Framing(4120) ❑ Framing(4120) ❑ Insulation(4150)
inspection;Electrical,Plumbing&Mechanical Approved to insulate Approved to install wallboard
Rough-in and Fire/Draft Stop inspections must be
signed-off and approved. IBC 109.3.4/UBC 1085.4 Bye S
Date /11 /03 By Date •
❑ Gypsum Wallboard Nailing(4130) �❑ Suspended Ceiling Grid (4265) ❑ Final-Fire Department(4060)
Approved to install mud&tape Approved to drop tile Approved
B /tui at) Date (l f O g By Date ,
By Dat44/61
❑ Final-Planning(4070) ❑ Final-Building(4050)
Approved Approved
By Date By(d0 (,/t)Date / (l/(2• �
•
•
For inspector reference only
0 Rough Electrical 0 FINAL-Electrical
Approved Approved •
By Date By Date