Loading...
08-105231 Building - Commercial City d Federal Way Community D4yelopment Services Permit #: 08-105231-00-CO P.O.Box 9718 Federal Way,WA 98063-9718 Inspection Request Line: (2 53)(253)835-2607 Fax (253)835-2609 r, p q 835-3050 Ems •: _ , Project Name: WORLD VISION US Project Address: 34834 WEYERHAEUSER WAY S Suite 200 Parcel Number: 222104 9031 Project Description: TI-Create(2) meeting rooms by constructing(4)walls.No plumbing or mechanical. Owner Applicant Contractor Lender WORLD VISION US SUPERIOR BUILDERS INC SUPERIOR BUILDERS INC WORLD VISION US PO BOX 8716 PO BOX 1849 SUPERBI112D2 (3/4/09) PO BOX 8716 FEDERAL WAY WA 98063 MILTON WA 98354-1849 PO BOX 1849 FEDERAL WAY WA 98063 MILTON WA 98354-1849 Census Category: 437 - Commercial alt/add/conversion Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area(sq.ft.) 0 0 0 0 Ike%krir Existing Sprinkler System in Building?........ .... _Yes Mechanical to be Included? ........ ... ......,...,....No Number of Stories. 4 Permit for Building Shell Only?............................No Plumbing to be Included? No New/Additional Sq.Feet-Total 0 Zoning Designation OP-1 PERMIT EXPIRES Tuesday, May 19, 2009 Permit Issued on Thursday, November 20, 2008 I hereby certify that the above information is correct a • that the construction on the above described property and the occupancy and the us will be i car.:nce wi • the laws, rules and regulations of the State of Washington and the ' ity of Federal Way. Owner or agent: , � Date: // (-90/0 - iiii, THIS CARD IS TO REMAIN ON-SITE . CITY OF Community Development Inspection Record Federal Way IVR INSPECTION REQUEST PHONE # (253) 835-3050 PERMIT #: 08-105231-00-CO Owner: WORLD VISION US Address: 34834 WEYERHAEUSER WAY S Suite 200 FEDERAL WAY, WA 98003 This card is part of your required inspection documents. Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom)..Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Footings/Setback(4110) 0 Re-steel (4215) ❑ Slab/Concrete Floor(4255) Approved to place concrete Approved to place concrete or grout Approved to place concrete By Date By Date By Date 0 Underfloor Framing(4285) ❑ Floor Sheathing(4105) 0 Fire/Draft Stops(4095) Approved to sheath floor Approved to install flooring Approved By Date By Date By Date NOTE: Prior to scheduling a Framing(4120) ❑ Framing(4120) ❑ Insulation(4150) inspection;Electrical,Plumbing&Mechanical Approved to insulate Approved to install wallboard Rough-in and Fire/Draft Stop inspections must be signed-off and approved. IBC 109.3.4/UBC 1085.4 Bye S Date /11 /03 By Date • ❑ Gypsum Wallboard Nailing(4130) �❑ Suspended Ceiling Grid (4265) ❑ Final-Fire Department(4060) Approved to install mud&tape Approved to drop tile Approved B /tui at) Date (l f O g By Date , By Dat44/61 ❑ Final-Planning(4070) ❑ Final-Building(4050) Approved Approved By Date By(d0 (,/t)Date / (l/(2• � • • For inspector reference only 0 Rough Electrical 0 FINAL-Electrical Approved Approved • By Date By Date