Loading...
19-104116 Building - Multi Family City of Federal Way Permit #:19-104116-00-MF Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: VILLAGE AT REDONDO CONDOS BLDG D Project Address: 28300 18TH AVE S Parcel Number: 894444 0000 Project Description: ALT- Remove and replace existing windows,doors,cladding and WRB on the rear elevation of the building.Repair existing balconies and provide new railing. Owner Applicant Contractor Lender VILLAGE AT REDONDO HOA DIMENSIONAL BUILDING TATLEY GRUND INC OWNER IS LENDER .CO RESIDENTIAL PROPERTIES I CONSULTANTS 1115 N 97TH ST 28300 18TH AVE S 626 120TH AVE NE SUITE B-I 01 SEATTLE WA 98103 FEDERAL WAY WA 98003 BELLEVUE WA 98005 • Census Category: 434-Residential alt/add-no change in number of units Includes: I #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area(sq.ft.) Additional Permit Information Mechanical to be Included' No Plumbing Work Valuation" 0 Mechanical Work Valuation? 0 Number of Stories 3 Is this an Online or O.T.C.application' No Permit for Building Shell Only? No Plumbing to be Included? No Total Valuation: 118,025.00 u $ .a u( 9 S `�.,.3.��..� ..,,� ? ...�`�.nom:.. .�..... � 3 H ._...: ..v ,ni3,Ali' .��:,.,�,.,3sa r �:�zh. � �a i ._. ,-, �v� ;t ��,�u:Lr.a, � ��..��S;B� , 3 PERMIT EXPIRES Wednesday, 15 April,2020 Permit Issued on Friday,October 18,2019 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy andthe e i II e in accordance with the laws, rules and regulations of the State of _ n'ton and the City of Federal Way. Date: Owner or agent: /o—/b—/e7 t 4A,. THIS CARD IS TO REMAIN ON-SITE • ' Federal Way Construction Inspection Record Fed y INSPECTION REQUESTS: (253)835-3050 PERMIT#: 19 104116 00 Address: 28300 18TH AVE S Bldg D Project: VILLAGE AT REDONDO HOA FEDERAL WAY WA Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Initial Erosion Control(4365) 1 7❑ Footings/Setback(4110) j Q Foundation Wall(4115) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete By Date • By Date ' By Date ® Drainage/Downspout(4040) ® Re-steel(4215) ® Slab/Concrete Floor(4255) Approved to backfill I Approved to place concrete or grout Approved to place concrete I By Date ' By Date By Date • ® Underfloor Framing(4285) ® Floor Sheathing(4105) ® Shear Walls(4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By• Date ' By Date •El Roof Sheathing(4220) 1 EiFire/Draft Stops(4095) al Interim Erosion Control(4370) Approved to install roofing Approved j Approved By Date ByDate / ! ,70.Z D By Date Prior to scheduling a Framing inspection; ® Framing(4 ElInsulation(4150) Electrical,Plumbing&Mechanical Rough-in A owed to insulate A and Fire/Draft Stop inspections must be signed- off igned- I pproved to install wallboard 1. off and approved. IBC 109.3.4 B, Date By Date 2 / ir 5 Gypsum Wallboard Nailing(4130) El Suspended Ceiling Grid(4265) 17 Final-S K F&R(4060) Approved to install mud&tape Approved to drop tile Approved By` Date / 20.7L0 By Date By Date El Final-Planning El Final Erosion Control(4375) El Final-Building(4050) Approved Approved Approved By Date By Date By Date Q Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date • RECEIVED • N. PERMIT APPLICATION CITY OF Federal SEP 0 4 2019 PERMIT CENTER+33325 8th Avenue South + Federal Way,WA 98003-6325 253-835-2607 + FAX 253-835-2609 + permitcenteri)icityoffederalway.com CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT PERMIT NUMBER I 9 — I I I 4 - Mr — TARGET DATE 28300 18th Avenue South, Federal Way SUITE/UNIT# SITE ADDRESS Building D PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL# $108;025 I I 21 ooh RM3600 8944440000-1822 TYPE OF PERMIT X BUILDING ❑ PLUMBING 0 MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT VILLAGE AT REDONDO BUILDING 'D' TARGETED REPAIRS Remove and replace existing windows, doors, cladding and WRB on the rear PROJECT DESCRIPTION elevation of the building. Repair existing balconies and provide new railing Detailed description of work to be included on this permit only NAME PRIMARY PHONE Village at Redondo Homeowners association C/O Suhrco 425 455 0900 Residential Properties, LLC,AMO PROPERTY OWNER MAILING ADDRESS E-MAIL 2010— 156th AVE NE#100 N/A CITY STATE ZIP Bellevue WA 98007 NAME PHONE TATLEY GRUND INC- Brian Whitaker 206 523 4653 MAILING ADDRESS E-MAIL 1115 N 97TH ST. bwhitaker@tatleygrund.com CONTRACTOR CITY STATE ZIP FAX Seattle WA WA WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# CC TATLEGI099MN—UBI: 601-328-042 05/04/2019 19-99-107560-00-BL NAME PRIMARY PHONE Dimensional Building Consultants 425 455 2046 MAILING ADDRESS E-MAIL APPLICANT 626 120th AVE NE esteban@dimensionalbc.com CITY STATE ZIP FAX Bellevue WA 98005 NAME PRIMARY PHONE Esteban Vallejo 425 455 2046 PROJECT CONTACT MAILING ADDRESS E-MAIL (The individual to receive and respond to all correspondence 626 120th AVE NE esteban@dimensionalbc.com concerning this application) CITY STATE ZIP FAX Bellevue WA 98005 NAME PROJECT FINANCING ❑ OWNER-FINANCED When value is$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the Bulletin#100—January 29,2016 Page 1 of 2 k:\Handouts\Permit Application . • issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs, expenses, and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part f is application. SIGNATURE: / ' g"' '' DAT PRINT NAME: Bulletin#100—January 29,2016 Page 2 of 2 k:\Handouts\Permit Application . . . Dimensional 626 120th Ave NE suite 6101 Bellevue WA 98005 o:425 455 2046/f:425 455 2069 dimensionalbc.com gari litBUIL NG. CONS.:TANTS, LC_ RECEIVED SEP 0 4 209 r September 03, 2019 ..t OF FED" -WAY 3PMMUNVVY DEVELOPMEPtT Community Development Department y -o > m City of Federal Way m O o � 33325 8th Avenue South C N -1 Federal Way, WA 98003-6325 O 77 N -- Attention: Mr. Scott Sproul, CBO, Building Official ren Q o 2 o �' co RE. VILLAGE AT REDONDO CONDOMINIUMS, BUILDING D so r J- $ RCW 64.55.020 (1) LIMITED CONSTRUCTION p < T 0 Dear Mr. Sproul: 0 (7) s° m N 6- 5 0 I refer to the above mentioned condominium property located at 28300 18th Avenue South, 0 g Federal Way, Washington. The exterior Work anticipated at Building D exceeds 5% of the P assessed value of the property and is therefore going to be subjected to limited "Rehabilitative 0 T Construction" as defined by RCW 64.55.020. Please be advised that our firm has provided building enclosure documents that in my professional judgment are appropriate to satisfy the requirements of RCW 64.55.005 through 64.55.090 for the areas where work has been authorized. Additionally, our firm is providing third party intermittent inspection of the work for quality assurance purposes in accordance with RCW 64.55.030. Upon completion of the inspections, our firm will prepare and submit a signed letter certifying that the building enclosure has been inspected during the course of construction or rehabilitative construction and that it has been constructed or reconstructed in substantial compliance with the building enclosure design documents, as updated pursuant to RCW 64.55.020. PP I Yours sincerely, ,� oI wts , Erika Pfeiffer, P.E. 4. j'' Oti;l erika@dimensionalbc.com principal , 38372 ,ii Dimensional Building Consultants, LLC vision • knowledge• solutions EXPIRES 03 MAR 2021 vision • knowledge • solutions GENERAL NOTES 1. ALL DRAWINGS, NOTES, AND DETAILS PROVIDED IN THIS SECTION REPRESENTS THE CONSTRUCTION DOCUMENTS. THE 'CONSTRUCTION DOCUMENTS' MAY NOT REPRESENT ALL CONDITIONS AND DIMENSIONS THAT ARE PRESENT ON SITE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE AND VERIFY ALL SITE CONDITIONS. 2. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS INCLUDING ACCESS TO THE WORK, POWER REQUIREMENTS, STAGING, DISPOSAL, AND SECURE MATERIAL STORAGE. 3. ALL MATERIALS SPECIFIED WITHIN THIS CONSTRUCTION DOCUMENTS SHALL BE INCORPORATED INTO THE WORK. NO SUBSTITUTIONS SHALL BE ACCEPTED UNLESS A WRITTEN REQUEST IS MADE FOR CONSIDERATION. ANY SUBSTITUTION REQUEST SHALL BE SUBMITTED IN CONJUNCTION WITH A LETTER FROM THE MATERIAL MANUFACTURER STATING A) THE PRODUCT HAS EQUAL PHYSICAL PROPERTIES TO THE SPECIFIED MATERIAL, B) THAT THE MANUFACTURER WARRANTS THAT THE SUBSTITUTED MATERIAL IS COMPATIBLE WITH ALL ADJACENT AND UNDERLYING MATERIALS AND SHALL MEET ITS INTENDED SERVICE LIFE. 4. THE CONTRACTOR SHALL VERIFY THE MATERIAL COMPATIBILITY OF ALL WATERPROOFING COMPONENTS (E.G., SEALANTS, CLOSED CELL BACKER ROD, SELF -ADHERING MEMBRANE, ETC.) USED IN CONJUNCTION WITH OTHER WATERPROOFING COMPONENTS. 5. THE CONTRACTOR SHALL ESTABLISH A WRITTEN SAFETY AND FALL PROTECTION PLAN, A COPY OF WHICH SHALL BE MAINTAINED ONSITE. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO COMMUNICATE THE PLANS TO ALL EMPLOYEES AND SUBCONTRACTORS. . 6. THE CONTRACTOR SHALL PROVIDE TO THE OWNER AND THE CONTRACT PROJECT ENGINEER EMERGENCY TELEPHONE NUMBERS AND CONTACT NAMES FOR USE, IF REQUIRED, OUTSIDE OF NORMAL BUSINESS HOURS. 7. THE CONTRACTOR SHALL INSTITUTE COMPLIANCE WITH AND BE SOLELY RESPONSIBLE FOR ALL RELEVANT CITY, COUNTY, STATE AND/OR FEDERAL ORDINANCES, LAWS AND REGULATIONS INCLUDING BUT NOT LIMITED TO: A) PROVISIONS FOR DISPOSAL OF CONSTRUCTION MATERIALS AND DEMOLITION DEBRIS. B) PROVISIONS FOR ELECTRICAL SAFETY. C) PROVISIONS OF OSHA REGULATIONS AND SIMILAR STATE AND LOCAL REQUIREMENTS FOR SAFETY IN THE WORKPLACE, INCLUDING PROVISIONS FOR SAFETY AND FALL PROTECTION PROGRAMS. D) PROVISIONS OF THE HAZARDOUS MATERIALS SECTIONS OF THE MATERIAL SAFETY DATA SHEETS (MSDS) SUBMITTED FOR PRODUCTS BROUGHT TO AND UTILIZED ON SITE. 8. A PROJECT BINDER SHALL BE GENERATED FOR ALL SPECIFIED PRODUCTS INCLUDING, INSTALLATION INSTRUCTIONS, PRODUCT DATA SHEETS AND MSDS SHEETS FOR ALL PRODUCTS. 9, THE PROVISIONS OF ALL RULES AND REGULATIONS GOVERNING SAFETY OF THE WORK SHALL APPLY TO ALL WORK UNDER THIS CONTRACT. FEDERAL, STATE AND LOCAL INSPECTORS SHALL BE GRANTED ACCESS TO THE WORK FOR INSPECTION WITHOUT FIRST OBTAINING A SEARCH OR ADMINISTRATIVE WARRANT. 10. IF THE CONTRACTOR OBSERVES THE EXISTENCE OF ANY MATERIAL, WHICH HE KNOWS OR HAS REASON TO BELIEVE IS HAZARDOUS TO HUMAN HEALTH, THE CONTRACTOR SHALL PROMPTLY NOTIFY THE OWNER. THE CONTRACTOR SHALL NOT PERFORM ANY WORK INVOLVING THE MATERIAL OR ANY WORK CAUSING THE MATERIAL TO BE LESS ACCESSIBLE PRIOR TO RECEIPT OF SPECIAL INSTRUCTIONS FROM THE OWNER. 11. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR HIS INVITEES AT THE SITE AND FOR THOSE OF HIS SUBCONTRACTORS, SUPPLIERS, AND THEIR EMPLOYEES, INCLUDING ANY ACTS OR OMISSIONS OF SUCH INVITEES. ALL INVITEES SHALL SIGN -IN AT. 12. THE CONTRACTOR AND NOT THE CONSULTANT SHALL BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES (OTHER THAN THOSE EXPRESSLY SPECIFIED IN CONTRACT DOCUMENTS), OR FOR SAFETY AND FALL PROTECTION PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. 13. ALL MATERIAL AND WORKMANSHIP SHALL BE SUBJECT TO OBSERVATION, EXAMINATION AND TESTING AT ANY AND ALL TIMES DURING MANUFACTURE AND CONSTRUCTION. THE CONSULTANT AND THE OWNER SHALL HAVE AUTHORITY TO REJECT DEFECTIVE MATERIAL AND WORKMANSHIP AND REQUIRE ITS CORRECTION. DEFECTIVE WORKMANSHIP SHALL BE SATISFACTORILY CORRECTED AND DEFECTIVE.MATERIAL SHALL BE SATISFACTORILY REPLACED WITH PROPER MATERIAL WITHOUT CHARGE THEREFOR, AND THE CONTRACTOR SHALL PROMPTLY SEGREGATE AND REMOVE THE DEFECTIVE MATERIAL FROM THE SITE. 14. THE CONSULTANT, THE OWNER, THE CONTRACT PROJECT ENGINEER, THE OWNER'S OBSERVERS AND OTHER TESTING PERSONNEL, INSPECTORS FROM STATE AND LOCAL AGENCIES, AND OTHERS AUTHORIZED BY THE OWNER, SHALL HAVE ACCESS TO THE WORK AT ALL TIMES. THE CONTRACTOR SHALL PROVIDE PROPER FACILITIES FOR ACCESS AND INSPECTION. 15. IF THE CONTRACTOR DEEMS ADDITIONAL DETAIL OR INFORMATION IS NEEDED, HE MAY REQUEST THE SAME IN WRITING FROM THE CONSULTANT TO CLARIFY THE INTENT CONVEYED IN THE SCOPE OF WORK OR PLANS AND SPECIFICATIONS. HIS REQUEST SHALL PRECISELY STATE THE DETAIL OR INFORMATION NEEDED AND SHALL EXPLAIN WHY IT IS NEEDED. THE CONTRACTOR SHALL ALSO INDICATE A DATE WHEN THE REQUESTED INFORMATION IS REQUIRED, 16. IF THE CONTRACTOR FINDS A CONFLICT, ERROR, OR OTHER DISCREPANCY IN THE PLANS OR SPECIFICATIONS, HE SHALL NOTIFY THE CONSULTANT IN WRITING AS SOON AS REASONABLY POSSIBLE, BUT BEFORE PROCEEDING WITH THE AFFECTED WORK. THE CONSULTANT SHALL ISSUE A CLARIFICATION TO THE CONTRACTOR STATING THE CORRECT REQUIREMENTS. IF THE CONTRACTOR DEEMS THE FIELD ORDER REQUIRES ADDITIONAL WORK, HE SHALL NOTIFY THE CONSULTANT OF SUCH PRIOR TO PROCEEDING WITH THAT WORK AND HE SHALL SUBMIT A REQUEST FOR CHANGE ORDER ALONG WITH A DETAILED SUBSTANTIATING COST PROPOSAL THRU THE CONSULTANT TO THE OWNER. 17. SUBMITTALS SHALL BE FORWARDED WITH REASONABLE TIME FOR REVIEW TO THE CONSULTANT FOR APPROVAL IF REQUIRED BY THE SPECIFICATIONS OR SCOPE OF WORK OR IF REQUESTED BY THE CONSULTANT OR THE OWNER. NO PART OF THE WORK DEALT WITH BY A SUBMITTAL SHALL BE FABRICATED BY THE CONTRACTOR, SAVE AT HIS OWN RISK, UNTIL SUCH APPROVAL HAS BEEN GIVEN. WORK CARRIED OUT BY CONTRACTOR IN ABSENCE OF APPROVED SUBMITTAL/ SHOP DRAWINGS SHALL BE AT CONTRACTORS OWN RISK. 18. IF A SUBMITTAL AND/OR SHOP DRAWINGS INDICATES A DEPARTURE FROM THE CONTRACT REQUIREMENTS, THE CONSULTANT MAY REJECT THE SUBMITTAL OR, IF HE DEEMS IT TO HAVE MERIT, MAY RECOMMEND IT TO THE OWNER, WHO SHALL APPROVE OR REJECT IT AS THE OWNER, IN ITS SOLE DISCRETION, SEES FIT. THE DEPARTURE FROM THE CONTRACT REQUIREMENTS SHALL BE FURTHER AUTHORIZED BY A CHANGE ORDER, IF A REDUCTION OR INCREASE IN THE CONTRACT PRICE IS APPROPRIATE. GENERAL NOTES (cont'd. 19. THE WORK SHALL BE IN ACCORDANCE WITH THE DESIGN DOCUMENTS, MANUFACTURER'S INSTALLATION INSTRUCTIONS & RECOMMENDATIONS, AND THE APPROVED SUBMITTALS/ SHOP DRAWINGS. APPROVAL OF THE CONTRACTOR'S SUBMITTALS BY THE CONSULTANT DOES NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY OF COMPLYING WITH THE CONTRACT AND ALL DRAWINGS AND SPECIFICATIONS, EXCEPT AS CHANGED BY CHANGE ORDER. 20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEW AND CONFIRMING COMPATIBILITY OF ALL COMPONENTS IN THE EVENT OF A SUBSTITUTION. LLTTERS FROM THE RELEVANT MATERIAL SUPPLIERS CONFIRMING COMPATIBILITY SHALL BE SUFFICIENT EVIDENCE OF COMPATIBILITY. 21. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THE CONTRACT, ALL EQUIPMENT, MATERIAL, AND ACCESSORIES INCORPORATED IN THE WORK ARE TO BE NEW. 22. UNLESS SPECIFICALLY APPROVED BY THE OWNER OR REQUIRED BY THE CONTRACT, THE CONTRACTOR SHALL NOT INCORPORATE INTO THE WORK ANY MATERIALS CONTAINING ASBESTOS OR ANY MATERIAL KNOWN BY THE INDUSTRY TO BE HAZARDOUS TO THE HEALTH OF BUILDING CONSTRUCTION WORKERS, MAINTENANCE WORKERS, OR OCCUPANTS. 23. ALL WORKMANSHIP SHALL BE OF THE HIGHEST QUALITY FOUND IN THE BUILDING INDUSTRY IN EVERY RESPECT. ALL ITEMS OF WORK SHALL BE DONE BY CRAFTSMEN OR TRADESMEN SKILLED IN THE PARTICULAR TASK OR ACTIVITY TO WHICH THEY ARE ASSIGNED. POOR OR INFERIOR WORKMANSHIP SHALL BE REMOVED AND REPLACED AT CONTRACTOR'S EXPENSE SUCH THAT THE WORK CONFORMS TO THE HIGHEST QUALITY STANDARDS OF THE TRADES CONCERNED, OR OTHERWISE CORRECTED TO THE SATISFACTION OF THE CONSULTANT, THE OWNER, OR OTHER INSPECTING AUTHORITY, AS APPLICABLE. ALL WORK SHALL BE FREE OF DEFECTS RESULTING FROM THE USE OF MATERIALS, EQUIPMENT OR WORKMANSHIP, WHICH ARE DEFECTIVE, INFERIOR, OR NOT IN ACCORDANCE WITH THE TERMS OF THE CONTRACT DOCUMENTS. 24. IF THE CONTRACTOR FINDS A GROWTH ON THE MATERIALS TO BE REMOVED WHICH THEY ARE CONCERNED ABOUT, THE CONTRACTOR SHALL CONTACT THE OWNER AND A CERTIFIED INDUSTRIAL HYGIENIST TO DETERMINE PROPER CONTAINMENT, HANDLING, AND DISPOSAL TECHNIQUES INCLUDING PERSONAL PROTECTION EQUIPMENT THAT IS NEEDED. ALL MATERIALS THAT ARE PHYSICALLY DAMAGED BY A GROWTH AND ROT MUST BE REMOVED PER THE HYGIENISTS PROTOCOL. APPLICABLE CODES: ALL CONSTRUCTION WITHIN THE SPECIFIED AREA OF WORK SHALL COMPLY WITH THE 2018 INTERNATIONAL BUILDING CODE, AND APPLICABLE CITY AND STATE AMENDMENTS. BUILDING INFORMATION: 28300 18TH AVENUE S. FEDERAL WAY, WASHINGTON 98003 PARCEL NO.: 894444-0000 YEAR BUILT: 1990 USE: MULTI -FAMILY CONDOMINIUMS CONSTRUCTION TYPE: WOOD FRAME PROJECT TEAM: OWNER: VILLAGE AT REDONDO HOMEOWNERS ASSOCIATION C/O SUHRCO RESIDENTIAL PROPERTIES, LLC, AMO 2010 - 156TH AVE NE #100 BELLEVUE, WA 98007 425-455-0900 BUILDING CONSULTANT: DIMENSIONAL BUILDING CONSULTANTS, LLC 626 120TH AVENUE NE, SUITE B101 BELLEVUE, WA 98005 CONTACT: MARTIN FLORES TEL: 425-455-2046 EMAIL: martin@dimensionalbc.com CONTRACTOR: TATLEY-GRUND INC. 1115 N 97TH ST. SEATTLE, WA 98103 CONTACT: BRIAN WHITAKER, PROJECT MANAGER 206-523-4653 BWH ITAKER@TATLEYGR U N D.COM Sheet List Table Sheet Number Sheet Title G-1.0 GENERAL NOTES & DRAWING INDEX G-1.1 SITE PLANS G-1.2 SCOPE OF WORK G-1.3 SCOPE OF WORK WP-2.0 ELEVATIONS WP-3.1 CLADDING DETAILS WP-3.2 WINDOW -DOOR DETAILS & SCHEDULES WP-3.3 WINDOW & DOOR DETAILS WP-3.4 WINDOW AND DOOR FLASHING SEQUENCE WP-4.1 DECK DETAILS WP-4.2 DECK DETAILS S-1.0 STRUCTURAL DETAILS VILLAGE AT REDONDO BUILDING'D & T'= TARGETED REPAIRS ABBREVIATIONS A.B. ANCHOR BOLT EA. EACH N/A NOT APPLICABLE ABR ABBREVIATION E.B. EXPANSION BOLT N.T.S. NOT TO SCALE ENCL. ENCLOSURE A/C AIR CONDITIONING EQ. EQUAL ADD ADDENDUM EP ENAMEL PAINT O.C. ON CENTER EXIST. EXISTING OP'G OPENING A.F.F. ABOVE FINISH FLOOR EXT. EXTERIOR OPP. OPPOSITE ALUM. ALUMINUM OSB ORIENTED STRAND BOARD ALT ALTERNATE PL PLATE F.F. FACTORY FINISH PLB'G PLUMBING FDTN FOUNDATION PNT. PAINT BLDG BUILDING F.E. FIRE EXTINGUISHER PLYWD PLYWOOD BLK'G BLOCKING F.F. FIN. FINISH FLOOR FINISH PR. PAIR PROP. PROPERTY BOT. BOTTOM FLR FLOOR PSF POUND PER SQ. FT. FT. FEET PVMT PAVEMENT C.J. CONTROL JOINT FT'G FOOTING q- CENTER LINE REINF. REINFORCED CL'G CEILING GA. GAUGE REQ. REQUIRED GLB GLU-LAM BEAM R.O. ROUGH OPENING CMU CONCRETE GWB GYPSUM WALL MASONRY UNIT BOARD COL. COLUMN GYP. GYPSUM SCHED. SCHEDULE CONC. CONCRETE HGT HEIGHT S.F. SQUARE FEET CONT. CONTINUE HORIZ. HORIZONTAL S SPPEE C. SIMILAR SPECIFICATIONS HR. HOUR SQ. SQUARE d PENNY NAILS ) STL STEEL DBL DOUBLE I.B.C. INTERNATIONAL STOR. STORAGE DEMO DEMOLITION BUILDING STRUCT. STRUCTURE DIA. DIAMETER CODE DIM DIMENSION INSUL. INSULATION INT. INTERIOR TEMP. TEMPORARY DN DOWN JT. JOINT T&G TONGUE AND GROOVE T.O.P. TOP OF PLATE DR DOOR KIT. KITCHEN TYP. TYPICAL DTL. DETAIL L.L. LIVE LOAD UTIL. UTILITY EA. EACH E.B. EXPANSION BOLT VENT. VENTILATION ELEV. ELEVATION MAT MATERIAL VERT. VERTICAL OR ELEVATOR MAX. MAXIMUM VTR VENT THRU ROOF ENCL. ENCLOSURE MECH. MECHANICAL EQ. EQUAL MF'R MANUFACTURER W/ WITH MIN. MINIMUM OR MINUTE W/O WITHOUT EXT. EXTERIOR MISC. MISCELLANEOUS WC WATER CLOSET MTL METAL WIN WINDOW f THE VILLAGE AT REDONDO Cando wl'i'l ®^^ + THE VILLAGE AT REDONDO Condo i 1 Q.S.T. PLAN N.T.S. O srr�e s, ue Sauth SITE AREA °I a 0 off' JP 4 JU VILLAGE AT REDONDO CONDOMINIUMS BUILDING 'M' v VICINITY MAP 4"N' N.T S. City of Federal Way Building Division A: PPROVED F CONSTRUCTION RECEIVED B y: ___ SEP 0 4 2019 Date - CITY OF FEDERAL WAY COMMUNrTY DEVELOPMENT a WE ARE PROVIDING A STATEMENT TO CERTIFY THE COST OF CONSTRUCTION IS MORE THAN 5% OF THE ASSESSED VALUE OF THE RESIDENTIAL BUILDING AND THEREFORE THE CONSTRUCTION WORK IS REHABILITATIVE AS DESCRIBED IN RCW 64.55. THE UNDERSIGNED HAS PROVIDED CONSTRUCTION DRAWINGS THAT IN MY PROFESSIONAL JUDGMENT ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF RCW 64.55.020. THIRD PARTY INSPECTIONS WILL ALSO BE PROVIDED IN ACCORDANCE WITH RCW 64.55.030. WE ARE USING THE ASSESSED VALUE AS PUBLISHED BY THE KING COUNTY DEPARTMENT OF ASSESSMENTS. nn nn LO O O [n CO O Q O 0) > O � > 0) N m ■ U O O m LO LO W N U) C L.LI O z U > Q Q � O f m 19 (.0 G �41 Z tia O 0 Z , O J 0 �I Z _ o 0 ZLU 06 O a. W -WLu r (- co > 0 > N Q W Q W z W F- I- /W 00 0 V J W < oM J > m lz N m SHEET NO. 0 Ap D m - O z ■ Vr ^' MA-_ nN� tiv *k P' O � A N A rn fl 00 GENERAL NOTES o 0 DRAWING INDEX o o s 6 O <K DATE:2019-09-03 0 PROJECT NO.: 18-11 ^o _A O 90 O 'n