20-100038 }
Mechanical
City of Federal Way Permit #:20-100038-00-ME
Community Development Dept. -
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609
Project Name: SADOWITZ
Project Address: 29030 7TH PL S Parcel Number: 515290 0020
Project Description: Furnace change out
•
Owner Applicant Contractor
RAPHAEL SADOWITZ KATRINA SIMONSONGREEN CITY GREEN CITY HEATING&AIR
29030 7TH PL S HEATING&AIR CONDITIONING CONDITIONING
FEDERAL WAY WA 98003 18131 85TH ST E GREENCH866B2(1/22/22)
USA BONNEY LAKE WA 98391 18131 85TH ST E
BONNEY LAKE WA 98391
Additional Permit Information
Mechanical Work Valuation? 3000.00 Is this an Online or O.T.C.applications Yes
Furnaces 1
PERMIT EXPIRES Sunday,5 July,2020
Permit Issued on Tuesday,January 7,2020
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
oNtaarstEFederal Way.
Owner or agent: Date:
FILE
THIS CARD IS TO REMAIN ON-SITE
Federal VI/ay Construction Inspection Record
INSPECTION REQUESTS:(253)835-3050
PERMIT#: 20 100038 00 Address: 29030 7TH PL S
Project: RAPHAEL JIN SADOWITZ FEDERAL WAY WA 98003-3607
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
® Mechanical Rough-in(4165) ® Gas Piping(4125) •0 Final-Mechanical(4065) ,
Approved Approved to release test Approved
By Date `By Date `By �S Date 0(010110-40.
•
Rough Electrical 0 Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date